awards is expected to begin during the period of availability of the annual allotment.

(f) Nonpoint source reserve. Each State shall reserve 1 percent of its annual allotment or $100,000, whichever is greater, for development and implementation of a nonpoint source management program under section 319 of the Act. Sums reserved by the State under this paragraph that are in excess of $100,000 and that are not used for these purposes, may be used by the State for any other purpose under title II of the Act.

(g) Marine estuary reserve. The Administrator shall reserve, before allotment of funds to the States, 1 percent of the funds appropriated under section 207 in fiscal years 1987 and 1988, and 11⁄2 percent of the funds appropriated under section 207 in fiscal years 1989 and 1990, to carry out section 205(1) of the Act.

(h) Indian program reserve. The Administrator shall reserve, before allotment of funds to the States, one-half of 1 percent of the funds appropriated under section 207 in fiscal years 1987, 1988, 1989 and 1990, for grants for the development of waste treatment management plans and for the construction of sewage treatment works to serve Indian tribes.

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985; 55 FR 27095, June 29, 1990]

§35.2021 Reallotment of reserves.

(a) Mandatory portions of reserves under $35.2020(b) through (g) shall be reallotted if not obligated during the allotment period (§35.2010(b) and (d)). Such reallotted sums are not subject to reserves. The State management assistance reserve under §35.2020(a) is not subject to reallotment.

(b) States may request the Regional Administrator to release funds in optional reserves or optional portions of required reserves under § 35.2020(b) through (e) for funding projects at any time before the reallotment date. If these optional reserves are not obligated or released and obligated for other purposes before the reallotment date, they shall be subject to reallotment under § 35.2010(b).

(c) Sums deobligated from the mandatory portion of reserves under paragraphs (b) through (e) of § 35.2020 which

are reissued by the Comptroller to the Regional Administrator before the initial reallotment date for those funds shall be returned to the same reserve. (See § 35.2010(c)).

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985; 55 FR 27095, June 29, 1990]

§35.2023 Water quality management planning.

(a) From funds reserved under §35.2020(d) the Regional Administrator shall make grants to the States to carry out water quality management planning including but not limited to:

(1) Identifying the most cost-effective and locally acceptable facility and non-point measures to meet and maintain water quality standards;

(2) Developing an implementation plan to obtain State and local financial and regulatory commitments to implement measures developed under paragraph (a)(1) of this section;

(3) Determining the nature, extent and causes of water quality problems in various areas of the State and interstate region, and reporting on these annually; and

(4) Determining which publicly owned treatment works should be constructed, in which areas and in what sequence, taking into account the relative degree of effluent reduction attained, the relative contributions to water quality of other point or nonpoint sources, and the consideration of alternatives to such construction, and implementing section 303(e) of the Act.

(b) In carrying out planning with grants made under paragraph (a) of this section, a State shall develop jointly with local, regional and interstate entities, a plan for carrying out the program and give funding priority to such entities and designated or undesignated public comprehensive planning organizations to carry out the purposes of this section.

§35.2024 Combined sewer overflows.

(a) Grant assistance from State allotment. As provided in §35.2015(b)(2)(iv), after September 30, 1984, upon request from a State, the Administrator may award a grant under section 201(n)(1) of the Act from the State allotment for

correction of combined sewer overflows provided that the project is on the project priority list, it addresses impaired uses in priority water quality areas which are due to the impacts of the combined sewer overflows and otherwise meets the requirements of this subpart. The State must demonstrate to the Administrator that the water quality goals of the Act will not be achieved without correcting the combined sewer overflows. The demonstration shall as a minimum prove that significant usage of the water for fishing and swimming will not be possible without the proposed project, and that the project will result in substantial restoration of an existing impaired use. (b) Separate fund for combined sewer overflows in marine waters. (1) After September 30, 1982, the Administrator may award grants under section 201(n)(2) of the Act for addressing impaired uses or public health risks in priority water quality areas in marine bays and estuaries due to the impacts of combined sewer overflows. The Administrator may award such grants provided that the water quality benefits of the proposed project have been demonstrated by the State. The demonstration shall as a minimum prove that significant usage of the water for shellfishing and swimming will not be possible without the proposed project for correction of combined sewer overflows, and the proposed project will result in substantial restoration of an existing impaired use. (2) The Administrator shall establish priorities for projects with demonstrated water quality benefits based upon the following criteria:

(i) Extent of water use benefits that would result, including swimming and shellfishing;

(ii) Relationship of water quality improvements to project costs; and

(iii) National and regional signifi

cance.

(3) If the project is a phase or segment of the proposed treatment works described in the facilities plan, the criteria in paragraph (b)(2) of this section must be applied to the treatment works described in the facilities plan and each segment proposed for funding.

(4) All requirements of this subpart apply to grants awarded under section 201(n)(2) of the Act except §§ 35.2010,

[blocks in formation]

35.2042, 35.2103, 35.2109, and 35.2202. §35.2025 Allowance and advance of allowance.

(a) Allowance. Step 2-3 and Step 3 grant agreements will include an allowance for facilities planning and design of the project and Step 7 agreements will include an allowance for facility planning in accordance with appendix B of this subpart.

(b) Advance of allowance to potential grant applicants. (1) After application by the State (see §35.2040(d)), the Regional Administrator will award a grant to the State in the amount of the reserve under § 35.2020(e) to advance allowances to potential grant applicants for facilities planning and project design.

(2) The State may request that the right to receive payments under the grant be assigned to specified potential grant applicants.

(3) The State may provide advances of allowance only to small communities, as defined by the State, which would otherwise be unable to complete

an

application for a grant under § 35.2040 in the judgment of the State.

(4) The advance shall not exceed the Federal share of the estimate of the allowance for such costs which a grantee would receive under paragraph (a) of this section.

(5) In the event a Step 2-3, Step 3 or Step 7 grant is not awarded to a recipient of an advance, the State may seek repayment of the advance on such terms and conditions as it may determine. When the State recovers such advances they shall be added to its most recent grant for advances of allowance. [49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27095, June 29, 1990]

§ 35.2030 Facilities planning.

(a) General. (1) Facilities planning consists of those necessary plans and studies which directly relate to treatment works needed to comply with enforceable requirements of the Act. Facilities planning will investigate the need for proposed facilities. Through a systematic evaluation of alternatives that are feasible in light of the unique demographic, topographic, hydrologic and institutional characteristics of the

area, it will demonstrate that, except for innovative and alternative technology under $35.2032, the selected alternative is cost effective (i.e., is the most economical means of meeting the applicable effluent, water quality and public health requirements over the design life of the facility while recognizing environmental and other nonmonetary considerations). For sewered communities with a population of 10,000 or less, consideration must be given to appropriate low cost technologies such as facultative ponds, trickling filters, oxidation ditches, or overland-flow land treatment; and for unsewered portions of communities of 10,000 or less, consideration must be given to onsite systems. The facilities plan will also demonstrate that the selected alternative is implementable from legal, institutional, financial and management standpoints.

(2) Grant assistance may be awarded before certification of the completed facilities plan if:

(i) The Regional Administrator determines that applicable statutory and regulatory requirements (including part 6) have been met; that the facilities planning related to the project has been substantially completed; and that the project for which grant assistance is awarded will not be significantly affected by the completion of the facilities plan and will be a component part of the complete waste treatment system; and

(ii) The applicant agrees to complete the facilities plan on a schedule the State accepts and such schedule is inserted as a special condition of the grant agreement.

(b) Facilities plan contents. A completed facilities plan must include:

(1) A description of both the proposed treatment works, and the complete waste treatment system of which it is a part.

(2) A description of the Best Practicable Wastewater Treatment Technology. (See § 35.2005(b)(7).)

(3) A cost-effectiveness analysis of the feasible conventional, innovative and alternative wastewater treatment works, processes and techniques capable of meeting the applicable effluent, water quality and public health requirements over the design life of the

facility while recognizing environmental and other non-monetary considerations. The planning period for the cost-effectiveness analysis shall be 20 years. The monetary costs to be considered must include the present worth or equivalent annual value of all capital costs and operation and maintenance costs. The discount rate established by EPA for the construction grants program shall be used in the cost-effectiveness analysis. The population forecasting in the analysis shall be consistent with the current Needs Survey. A cost-effectiveness analysis must include:

(i) An evaluation of alternative flow reduction methods. (If the grant applicant demonstrates that the existing average daily base flow (ADBF) from the area is less than 70 gallons per capita per day (gpcd), or if the Regional Administrator determines the area has an effective existing flow reduction program, additional flow reduction evaluation is not required.)

(ii) A description of the relationship between the capacity of alternatives and the needs to be served, including capacity for future growth expected after the treatment works become operational. This includes letters of intent from significant industrial users and all industries intending to increase their flows or relocate in the area documenting capacity needs and characteristics for existing or projected flows;

(iii) An evaluation of improved effluent quality attainable by upgrading the operation and maintenance and efficiency of existing facilities as an alternative or supplement to construction of new facilities;

(iv) An evaluation of the alternative methods for the reuse or ultimate disposal of treated wastewater and sludge material resulting from the treatment process;

(v) A consideration of systems with revenue generating applications; (vi) An evaluation of opportunities to reduce use of, or recover energy;

(vii) Cost information on total capital costs, and annual operation and maintenance costs, as well as estimated annual or monthly costs to residential and industrial users.

(4) A demonstration of the non-existence or possible existence of excessive

inflitration/inflow in the sewer system. See § 35.2120.

(5) An analysis of the potential open space and recreation opportunities associated with the project.

(6) An adequate evaluation of the environmental impacts of alternatives under part 6 of this chapter.

(7) An evaluation of the water supply implications of the project.

(8) For the selected alternative, a concise description at an appropriate level of detail, of at least the following: (i) Relevant design parameters;

(ii) Estimated capital construction and operation and maintenance costs, (identifying the Federal, State and local shares), and a description of the manner in which local costs will be financed;

(iii) Estimated cost of future expansion and long-term needs for reconstruction of facilities following their design life;

(iv) Cost impacts on wastewater system users; and

(v) Institutional and management arrangements necessary for successful implementation.

(c) Submission and review of facilities plan. Each facilities plan must be submitted to the State for review. EPA recommends that potential grant applicants confer with State reviewers early in the facilities planning process. In addition, a potential grant applicant may request in writing from the State and EPA an early determination under part 6 of this chapter of the appropriateness of a categorical exclusion from NEPA requirements, the scope of the environmental information document or the early preparation of an environmental impact statement. $35.2032 Innovative and alternative

technologies.

(a) Funding for innovative and alternative technologies. Projects or portions of projects using unit processes or techniques which the Regional Administrator determines to be innovative or alternative technology shall receive increased grants under §35.2152.

(1) Only funds from the reserve in $35.2020(c) shall be used to increase these grants.

(2) If the project is an alternative to conventional treatment works for a

small community, funds from the reserve in §35.2020(b) may be used for the 75 percent portion, or any lower Federal share of the grant as determined under § 35.2152.

(b) Cost-effectiveness preference. The Regional Administrator may award grant assistance for a treatment works or portion of a treatment works using innovative or alternative technologies if the total present worth cost of the treatment works for which the grant is to be made does not exceed the total present worth cost of the most cost-effective alternative by more than 15 percent.

(1) Privately-owned individual systems (§35.2034) are not eligible for this preference.

(2) If the present worth costs of the innovative or alternative unit processes are 50 percent or less of the present worth cost of the treatment works, the cost-effectiveness preference applies only to the innovative or alternative components.

(c) Modification or replacement of innovative and alternative projects. The Regional Administrator may award grant assistance to fund 100 percent of the allowable costs of the modification or replacement of any project funded with increased grant funding in accordance with paragraph (a) of this section if he determines that:

(1) The innovative or alternative elements of the project have caused the project or significant elements of the complete waste treatment system of which the project is a part to fail to meet project performance standards;

(2) The failure has significantly increased operation and maintenance expenditures for the project or the complete waste treatment system of which the project is a part; or requires significant additional capital expenditures for corrective action;

(3) The failure has occurred prior to two years after initiation of operation of the project; and

(4) The failure is not attributable to negligence on the part of any person.

§35.2034 Privately owned individual systems.

(a) An eligible applicant may apply for a grant to build privately owned treatment works serving one or more

principal residences or small commercial establishments.

(b) In addition to those applicable limitations set forth in §§ 35.2100 through 35.2127 the grant applicant shall:

(1) Demonstrate that the total cost and environmental impact of building the individual system will be less than the cost of a conventional system;

(2) Certify that the principal residence or small commercial establishment was constructed before December 27, 1977, and inhabited or in use on or before that date;

(3) Apply on behalf of a number of individual units to be served in the facilities planning area;

(4) Certify that public ownership of such works is not feasible and list the reasons; and

(5) Certify that such treatment works will be properly operated and maintained and will comply with all other requirements of section 204 of the Act. §35.2035 Rotating biological con

tractor (RBC) replacement grants.

The Regional Administrator may award a grant for 100 percent of the cost, including planning and design costs, of modification or replacement of RBCs which have failed to meet design performance specifications, provided:

(a) The applicant for a modification/ replacement grant demonstrates to the Regional Administrator's satisfaction, by a preponderance of the evidence, that the RBC failure is not due to the negligence of any person, including the treatment works owner, the applicant, its engineers, contractors, equipment manufacturers or suppliers;

(b) The RBC failure has significantly increased the project's capital or operation and maintenance costs;

[blocks in formation]

propriated or otherwise available after February 4, 1987.

[55 FR 27095, June 29, 1990]

§ 35.2036 Design/build project grants.

(a) Terms and conditions. The Regional Administrator may award a design/build (Step 7) project grant provided that:

(1) The proposed treatment works has an estimated total cost of $8 million or less;

(2) The proposed treatment works is an aerated lagoon, trickling filter, waste stabilization pond, land application system (wastewater or sludge), slow rate (intermittent) sand filter or subsurface disposal system;

(3) The proposed treatment works will be an operable unit, will meet all requirements of title II of the Act, and will be operated to meet the requirements of any applicable permit;

(4) The grantee obtains bonds from the contractor in an amount the Regional Administrator determines adequate to protect the Federal interest in the treatment works (see 40 CFR 31.36(h));

(5) The grantee will not allow any engineer, engineering firm or contractor which provided facilities planning or pre-bid services to bid or carry out any part of the design/build work;

(6) Contracts will be firm, fixed price contracts;

(7) The grantee agrees that the grant amount, as amended to reflect the lowest responsive/responsible bid (see paragraph (e) of this section), will not be increased;

(8) The grantee will establish reasonable building start and completion dates;

(9) The grantee agrees that EPA will not pay more than 95 percent of the grant amount until after completion of building and the Regional Administrator's final project approval, based on initiation of operation and acceptance of the facility by the grantee;

(10) The grantee agrees that a recipient of a Step 7 grant is not eligible for any other grant for the project under title II of the Act; and

(11) The grantee accepts other terms and conditions deemed necessary by the Regional Administrator.