clause as paragraph (d), and add the following as paragraph (c) in the basic clause:

(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for , beginning with the first day of the first full month following the month of manufacture marked on the container, all sup plies furnished retain their original characteristics to the extent that the supplies remain suitable for the intended use as stated in this contract (1) under actual application conditions or (ii) when tested in accordance with requirements stated elsewhere in this contract.

(c) Government surveillance and testing.

(1) During this period, surveillance will be maintained on supplies warehoused in Government facilities; and the supplies will be tested periodically to determine their suitability for intended use. Sampling for surveillance testing will be in accordance with Military Standard No. 105, and such testing will be made after NORMAL MIXING, STIRRING, OR SHAKING, in accordance with directions either furnished with the supplies or as shown in the applicable specifications.

(2) Surveillance testing will be based on storage stability requirements set forth in the contract specification, or purchase description on the basis of salient characteristics (e.g., viscosity or sag flow, curing time, strip adhesion or tensile shear, etc.) established by GSA as appropriate to determine suitability for intended use. In the case of brand name items not covered by detailed purchase descriptions, surveillance testing may be based on salient characteristics included in the manufacturer's data sheets. If storage stability requirements showing allowable variations are not included in applicable specifications or elsewhere in the contract, material will be considered suitable for intended use if the salient characteristics vary not more than 20 percent from the originally specified values (i.e., those applicable to acceptance testing of the supplies) for noncritical end-use items, and not more than 10 percent for critical end-use items. (56 FR 1741, Jan. 17, 1991) 552.246-70 Source inspection by qual

ity approved manufacturer. As prescribed in 546.302–70, insert the following clause: SOURCE INSPECTION BY QUALITY APPROVED

MANUFACTURER (Dec 1990) (a) Inspection system and inspection facilities.

(1) The inspection system maintained by the Contractor under the Inspection of Supplies Fixed Price clause (FAR 52.246-2) of this contract shall be maintained through

out the contract period and shall comply with all requirements of Federal Standard 368, edition in effect on the date of the solicitation. A written description of the inspection system shall be made available to the Government before contract award. The Contractor shall immediately notify the Contracting Officer and the designated GS quality assurance office of any changes made in the inspection system during the contract period. As used herein, the term "inspection system" means the Contractor's own facility or any other facility acceptable to the Government that will be used to perform inspections or tests of materials and components before incorporation into end articles and for inspection of such end articles before shipment. When the manufacturing plant is located outside of the United States, the Contractor shall arrange delivery of the items from a plant or warehouse located in the United States (including Puerto Rico and the Virgin Islands) equipped to perform all inspections and tests required by the contract or specifications to evidence conformance therewith, or shall arrange with a testing laboratory or other facility in the United States, acceptable to the Government, to perform the required inspections and tests.

(2) In addition to the requirements in Federal Standard 368, records shall include the date when inspection and testing were performed. These records shall be available for (1) 3 years after final payment; or (11) 4 years from the end of the Contractor's fiscal year in which the record was created, whichever period expires first.

(3) Offerors are required to specify, in the space provided elsewhere in this solicitation, the name and address of each manufacturing plant or other facility where supplies will be available for inspection, indicating the item number(s) to which each applies.

(4) Within 10 calendar days after receipt of the written notice of award, the Contractor shall provide the Administrative Contracting Officer with the name of the individual and an alternate that will be responsible for inspecting each shipment under this contract.

(b) Inspection and receiving reports.

(1) For each shipment released, one of the officials named by the Contractor under paragraph (a)(4) above shall sign a Quality Approved Manufacturer Certificate certifying that supplies have been inspected and found to comply with contract requirements.

The certification shall read as follows:

"I certify that all items in this shipment have been listed herein, and have been inspected and found to comply with all requirements of the contract."

Signature of Certifying Official (1) For shipments made to military facilities, the Contractor shall prepare and distribute the DD Form 250, Material Inspection and Receiving Report, or computer formatted equivalent of the form not later than the close of business the workday following shipment. The certification above shall be placed in block 16 on this form. The Contractor will be provided a supply of the DD Form 250 with complete instructions for preparation and distribution.

(ii) For shipments made to civilian facilities only, the Contractor shall prepare and distribute not later than the close of business the workday following shipment a certification of inspection and conformance for the identified items, in accordance with instructions furnished at the time of award. The Contractor may furnish the requisite information on the DD Form 250 or computer formatted equivalent, company letterhead, or invoice document.

(c) Inspection by Government personnel.

(1) Although the Government will normally rely upon the Contractor's certification as to the quality of supplies shipped, it reserves the right under the Inpsection of Supplies—Fixed Price clause to inspect and test all supplies called for by this contract, before acceptance, at all times and places, including the point of manufacture. When the Government notifies the Contractor of its intent to inspect supplies before shipment, the Contractor shall notify or arrange for subcontractors to notify the designated GSA quality assurance office 7 workdays before the date when supplies will be ready for inspection. Shipment shall not be made until inspection by the Government is completed and shipment is authorized by the Government.

(2) Government inspection responsibility will be assigned to the GSA quality assurance office which has jurisdiction over the State in which the Contractor's or subcontractor's plant or other designated point for inspection is located.

(3) During the contract period, a Government representative may periodically select samples of supplies produced under this contract for Government verification inspection and testing. Samples sent to a Government testing facility will be disposed of as follows: Samples from an accepted lot, not damaged in the testing process, will be returned promptly to the Contractor after completion of tests. Samples damaged in the testing process will be disposed of as requested by the Contractor. Samples from a rejected lot will be returned to the Contractor or disposed of in a time and manner agreeable to both the Contractor and the Government.

(d) Quality deficiencies.

(1) Notwithstanding any other clause of this contract concerning the conclusiveness of acceptance by the Government, any supplies or production lots shipped under this contract found to be defective in material or workmanship, or otherwise not in conformity with the requirements of this contract

within a period of * months after acceptance shall, at the Government's option, be replaced, repaired or otherwise corrected by the Contractor at no cost to the Government within 30 calendar days (or such longer period as the Government may authorize in writing) after receipt of notice to replace or correct. The Contractor shall remove, at its expense, supplies rejected or required to be replaced, repaired or corrected. When the nature of the defect affects an entire batch or lot of supplies, and the Contracting Officer determines that correction can best be accomplished by retaining the nonconforming supplies and reducing the contract price by an amount equitable under the

circumstances, then the equitable price adjustment shall apply to the entire batch or lot of supplies from which the nonconforming item was taken.

(2) If supplies in process, shipped or awaiting shipment to fill Government orders are found not to comply with contract requirements, or if deficiencies in either plant quality or process controls are found, the Contractor may be issued a Quality Deficiency Notice (DDN). Upon receipt of a QDN, the Contractor shall take immediate corrective action and shall suspend shipment of the supplies covered by the QDN until such time as corrective action has been completed. The Contractor shall notify the GSA quality assurance office, within 5 workdays, of corrective action taken or to be taken to permit onsite verification by a Government representative. Shipments of nonconforming supplies will be returned at the Contractor's expense and may constitute cause for termination. Delays due to the issuance of a QDN do not constitute excusable delay under the Default clause. Failure to complete corrective action in a timely manner may result in termination of this contract.

(3) This contract may be terminated for default if subsequent Government inspection discloses that plant quality or process controls are not being maintained, supplies which do not meet the requirements of the specification are being shipped, or there is failure to comply with any other requirement of this clause.

(e) Additional cost for inspection and testing. The Contractor will be charged for any additional cost of inspection/testing or reinspecting/retesting supplies for the reasons stated in paragraph (e) of FAR 52.246–2, Inspection of Supplies-Fixed Price. When inspection or testing is performed by or under the direction of GSA, charges will be at the rate of $ ** per man-hour or fraction thereof if the inspection is at a GSA distribution center; $ ** per man-hour or fraction thereof, plus travel costs incurred, if the inspection is at any other location; and $ ** per man-hour or fraction thereof for laboratory testing, except that when a testing facility other than a GSA laboratory performs days before the date the work will be completed and ready for final inspection and tests. Final inspection and tests will begin within 10 calendar days after the date specified in the Contractor's notice unless the Contracting Officer determines that the work is not ready for final inspection and so informs the Contractor.

(End of Clause)

all or part of the required tests, the Contractor shall be assessed the actual cost incurred by the Government as a result of testing at such facility. When inspection is performed by or under the direction of any agency other than GSA, the charges indicated above may be used, or the agency may assess the actual cost of performing the inspection and testing.

(1) Responsibility for rejected supplies. When the Contractor fails to remove or provide instructions for the removal of rejected sup plies under paragraph (d) above, pursuant to the Contracting Officer's instructions, the Contractor shall be liable for all costs incurred by the Government in taking such measures as are expedient to avoid unnecessary loss to the Contractor. In addition to the remedies provided in FAR 52.246–2, supplies may be

(1) Stored for the Contractor's account;

(2) Reshipped to the Contractor at its expense (any additional expense incurred by the Government or the freight carrier caused by the refusal of the Contractor to accept their return also shall be for the Contractor's account); or

(3) Sold to the highest bidder on the open market and the proceeds applied against the accumulated storage and other costs, including the cost of the sale.

(g) Subcontracting requirements. The Contractor shall insert in any subcontracts the inspection or testing provisions set forth in paragraphs (a) through (d) of this clause and the Inspection of Supplies—Fixed Price clause of this contract. The Contractor shall be responsible for compliance by any subcontractor with the provisions set forth in paragraphs (a) through (d) of this clause and the Inspection of Supplies Fixed Price clause.

552.246-72 Source inspection by Gov

ernment. As prescribed in 546.302–71, insert the following clause: SOURCE INSPECTION BY GOVERNMENT (DEC

1990) (a) Inspection by Government personnel.

(1) Supplies to be furnished under this contract will be inspected at source by the Government before shipment from the manufacturing plant or other facility designated by the Contractor, unless the Contractor is otherwise notified in writing by the Contracting Officer or a designated representative. Notwithstanding the foregoing, the Government may perform any or all tests contained in the contract specifications at a Government facility without prior written notice by the Contracting Officer before release of the supplies for shipment. Samples sent to a Government testing facility will be disposed of as follows: Samples from an accepted lot, not damaged in the testing process, will be returned promptly to the Contractor after completion of tests. Samples damaged in the testing process will be disposed of as requested by the Contractor. Samples from a rejected lot will be returned to the Contractor or disposed of in a time and manner agreeable to both the Contractor and the Government.

(2) Government inspection responsibility will be assigned to the GSA qu ity assurance office which has jurisdiction over the State in which the Contractor's or subcontractor's plant or other designated point for inspection is located. The Contractor shall notify or arrange for subcontractors to notify the designated GSA quality assurance office 7 workdays before the date when supplies will be ready for inspection. Shipment shall not be made until after inspection by the Government is completed and shipment is authorized by the Government.

(b) Inspection and receiving reports. For each shipment, the Contractor shall be responsible for preparation and distribution of inspection documents as follows: (1) DD Form 250, Material Inspection and Receiving Report, or computer formatted equivalent for deliveries to military agencies; or (2) GSA Form 308, Notice of Inspection for deliveries to GSA or other civilian agencies. When required, the Contractor will be furnished a

(End of Clause) * The Contracting Officer shall normally insert 12 months as the period during which defective or otherwise nonconforming supplies must be replaced. However, when the supplies being bought have a shelf life of less than 1 year, the shelf-life period should be used, or in the instance where a longer period may reasonably be expected to be available, the longer period should be used.

** The rates to be inserted are established by the Commissioner of the Federal Supply Service or a designee. (56 FR 1742, Jan. 17, 1991)

552.246–71 Final inspection and tests.

As prescibed in 546.312, insert the following clause:

FINAL INSPECTION AND TESTS (MAY 1989) The Contractor shall give written notice to the Contracting Officer at least 10 calendar

supply of GSA Form 308 and/or DD Form 250, and complete instructions for their preparation and distribution.

(c) Inspection facilities.

(1) The inspection system required to be maintained by the Contractor in accordance with FAR 52.246–2, Inspection of SuppliesFixed Price, may be the Contractor's own facilities or any other facilities acceptable to the Government. These facilities shall be utilized to perform all inspections and tests of materials and components before incorporation into end articles, and for the inspection of such end articles before shipment. The Government reserves the right to evaluate the acceptability and effectiveness of the Contractor's inspection system before award and periodically during the contract period.

(2) Offerors are required to specify, in the spaces provided elsewhere in the solicitation, the name and address of each manufacturing plant or other facility where supplies will be available for inspection, indicating the item number(s) to which each applies.

(3) The Contractor shall deliver the items specified in this contract from a plant or warehouse located within the United States (including Puerto Rico and the Virgin Islands) that is equipped to perform all inspections and tests required by this contract or specifications to evidence conformance therewith, or shall arrange with a testing laboratory or other facility in the United States, acceptable to the Government, to perform the required inspections and tests.

(d) Availability of records.

(1) In addition to any other requirement of this contract, the Contractor shall maintain records showing the following information for each order received under the contract: (i) Order number; (ii) date order received by the Contractor; (iii) quantity ordered; (iv) date scheduled into production; (v) batch or lot number, if applicable; (vi) date inspected and/or tested; (vii) date available for ship ment; (viii) date shipped or date service completed; and (ix) National Stock Number (NSN), or if none is provided in the contract, the applicable item number or other contractual identification.

(2) These records should be maintained at the point of source inspection and shall be available to the Contracting Officer, or an authorized representative, for (i) 3 years after final payment; or (ii) 4 years from the end of the Contractor's fiscal year in which the record was created, whichever period expires first.

(e) Additional cost for inspection and testing. The Contractor will be charged for any additional cost for inspecting/testing or reinspection/retesting supplies for the reasons stated in paragraph (e) of FAR 52.246-2, Inspection of Supplies—Fixed Price. When inspection or testing is performed by or under the direction of GSA, charges will be at the rate of $ * per man-hour or fraction thereof if the in

spection is at a GSA distribution center; $ * per man-hour or fraction thereof, plus travel costs incurred, if the inspection is at any other location; and S * per man-hour or fraction thereof for laboratory testing, except that when a testing facility other than a GSA laboratory performs all or part of the required tests, the Contractor shall be assessed the actual cost incurred by the Government as a result of testing at such facility. When inspection is performed by or under the direction of any agency other than GSA, the charges indicated above may be used, or the agency may assess the actual cost of performing the inspection and testing.

(f) Responsibility for rejected supplies. When the Contractor fails to remove or provide instructions for the removal of rejected supplies under FAR 52.246–2(h) pursuant to the Contracting Officer's instructions, the Contractor shall be liable for all costs incurred by the Government in taking such measures as are expedient to avoid unnecessary loss to the Contractor. In addition to the remedies provided in FAR 52.246-2, supplies may be

(1) Stored for the Contractor's account;

(2) Reshipped to the Contractor at its expense (any additional expense incurred by the Government or the freight carrier caused by the refusal of the Contractor to accept their return also shall be for the Contractor's account); or

(3) Sold to the highest bidder on the open market and the proceeds applied against the accumulated storage and other costs, including the cost of the sale.

(End of Clause) * The rates to be inserted are established by the Commissioner of the Federal Supply Service or a designee. (56 FR 1744, Jan. 17, 1991)

552.246-73 Warranty-multiple award

schedule. As prescribed in 546.710, insert the following clause:

WARRANTY-MULTIPLE AWARD SCHEDULE

(MAY 1989)

The Contractor's standard commercial warranty as stated in the Contractor's commercial price list will apply to this contract if its warranty is equal to or better than the warranty required by 552.246-17 (Alternate I).

(End of Clause)

552.246-74 Warranty-International

multiple award schedule. As prescribed in 546.710(c), insert the following clause:

WARRANTY INTERNATIONAL MULTIPLE

AWARD SCHEDULE (MAY 1989) Unless specified otherwise in this contract, the Contractor's standard commercial warranty as stated in the commercial price list applies to this contract, except: (a) The Contractor shall provide, at a minimum, a warranty on all non-consumable parts for a period of 90 days from the date that the Government accepts the product; (b) parts and labor required under the warranty provisions shall be supplied free of charge; (c) transportation costs of returning the products to and from the repair facility, or the costs involved with contractor personnel traveling to the Government facility for the purpose of repairing the product onsite shall be borne by the Contractor during the 90-day warranty period.

stallation furnished by any manufacturer, supplier, or installer in the ordinary course of business; (2) All information required to make such guarantee or warranty legally binding and effective; and (3) The information and the guarantee or warranty in sufficient time to permit the Government to meet any ime limit specified in the guarantee or warranty or, if no time limit is specified, prior to completion and acceptance of all work under this contract.

(End of Clause)

552.246–76 Warranty of pesticides.

As prescribed in 546.710, insert the following clause:

(End of Clause)

552.246–75 Guarantees.

As prescribed in 546.710(b), insert the following clause:

WARRANTY OF PESTICIDES (MAY 1989) (a) Notwithstanding acceptance of pesticides by the Government, the Contractor warrants that for 1 year after the date of shipment, all pesticides furnished under this contract shall meet the requirements of Pub. L. 92–516, as amended, and shall be registered with the Environmental Protection Agency (EPA).

(b) If EPA takes action to stop sale, stop use, remove, seize, or cancel registration of a pesticide within 1 year after date of shipment, the Contractor shall immediately notify the Contracting Officer. The notification will include: (1) Contract number; (2) identification of the pesticide; (3) reason for the EPA action against the pesticide; and (4) list of Government agencies and addresses to which it was delivered.

[ocr errors]

(End of Clause)

GUARANTEES (MAY 1989) (a) Unless otherwise provided in the specifications, the Contractor guarantees all work to be in accordance with contract requirements and free from defective or inferior materials, equipment, and workmanship for 1 year after the date of final acceptance or the date the equipment or work was placed in use by the Government, whichever occurs first.

(b)(1) If, within any guarantee period, the Contracting Officer finds that guaranteed work requires repair or change because of defective or inferior materials, equipment, or workmanship or is not in accordance with contract requirements, the Contracting Officer shall notify the Contractor in writing. The Contractor shall promptly, and without additional expense to the Government, correct:

(i) All guaranteed work;

(ii) All damage to equipment, the site, the building or its contents resulting from the unsatisfactory guaranteed work; and

(iii) Any work, materials, and equipment that are disturbed in fulfilling the guarantee, including any disturbed work, materials, and equipment that may have been guaranteed under another contract.

(2) If the Contractor fails to proceed promptly in accordance with the guarantee, the Government may have such work performed at the expense of the Contractor.

(c) Any special guarantees that may be required under the contract will be subject to paragraphs (a) and (b), insofar as they do not conflict with special guarantees.

(d) The Contractor shall furnish to the Government: (1) Each transferable guarantee or warranty of equipment, materials, or in

552.247-70 Placarding railcar ship

ments. As prescribed in 547.305, insert the following clause:

PLACARDING RAILCAR SHIPMENTS (MAY 1989)

When a railcar is loaded in such a manner that it can be or should be unloaded from only one side, the Contractor shall place on the appropriate railcar door a placard reading “Unload From This Side" and on the opposite door a placard reading “Unload From Other Side."

(End of Clause)

552.249-70 Termination for conven

ience of the Government (fixed

price) (short form). As prescribed in 549.502 insert the following clause: