A. Noise on Channel 8 Telemetry During Inadvertent Turn-On. Page B-5 B-5 B-6 B-7 B-7 B-9 B-9 B-11 C-1 B. Tests Performed on the Command Switch and on the C-4 1. Test Performed on a 15 Point Commutator to Determine its C-4 B. Effect of Diaphragm and Mounting Block Changes on the Measured F-1 1. Introduction F-1 SEQUENCER ACCUMULATOR PULSE AND HIGH CURRENT Operating Characteristics of the Sequencer Accumulator Pulse RA-6 Vibration Levels Corrected to RA-1 Through RA-5 During Liftoff.. Statistical Distribution of Spacecraft Acceleration Spectra During Number ILLUSTRATIONS (cont) Title Page 5-7 RA-6, Mission Telemetry Plot, Channel 8, Point 7, Top Hat, 5-15 5-8 RA-6, Mission Plot, Channel 8, Point 8, Shroud Temperature 5-16 7-3 A-1 A-2 RA-6 Agena Separate and Spacecraft Umbilical Connectors. 7-6 A-6 A-7 A-3 RA-6, Channel 8, Point 3 Telemetry, Calibration Curve, F Battery A-8 A-4 RA-6, Channel 8, Point 4, Telemetry Calibration Curve, P Battery RA-6, Channel 8, Point 7, Telemetry Calibration Curve, Top Hat Critical Area of Electrostatic Potential Versus Atmosphere (In Terms E-3 F-1 Channel 17 Power Spectral Density (PSD), 2. 5 to 4. 5 Seconds F-2 F-2 F-3 Channel 17 Power Spectral Density (PSD), 41. 75 to 43. 75 Seconds. F-3 F-4 |