Page images
PDF
EPUB
[merged small][merged small][merged small][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

(6)

[ocr errors]

SUBTOTAL

FY 1976

FY 1977

FY 1978

FY 1979

FY 1975-79

(3)
BALANCE TO

CONFULTE

FY 13:4 (Cal & E

191

TOTAL EXCLUDING

(Non-Acul

[merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small]

Obis Outlays Obli Outlays

[ocr errors]

Outlays

Obls. Outlays

[ocr errors]

Outlays

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

ENERGY RESEARCH & DEVELOPMENT FACT SHEET (Continued)

TAIL OF FUNDING REQUIREMENTS-Federal Government Only (in millions of dollars)

EQUIPMENT

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small]

private Facil ties. The

mber of pot tractors excr Specific con: he selected :

S. BRIEF DESC
PROPOSAL

State:

County:

[blocks in formation]

I NAME OF CONTRACTOR: Site where work will be daterformed

[blocks in formation]

tial con-
Is 100.
ctors will
a later
'TION OF

[blocks in formation]

The objective of this subnrogram is to demonstrate solar therma system capability to provide widespread production of load followinr electric energy, with a potential for reeting baseload requirements for electric utilities, and total energy systems for military and other installations. The subprogram.includes:

Design, fabrication, and assembly of equipment for a demonstr.
100 te Central Receiver Load Folloing Power plant.
(Same as orderly program but delayed one year,

. Design, fabrication, and testing of a 200 e, 2 th (delive
pilot plant, and design fabrication, and assembly of a 10"
200 th (delivered) de-onstration plant for a Solar Total
Energy System for a Community or "ilitary Base. (Sare as
orderly program but delayed 6 months)

.

[ocr errors]

Design, Fabrication, and testing of a 400 Klie bench model
Collector Load Following plant.

. Advanced Research and Technology

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors]

ENERGY RESEARCH AND DEVELOPMENT FACT SHEET (Continued)

Level of Effort:

O MAXINIUM
ORDERLY
MINIMUM

IDENTIFICATION NUMBER 0903000512985501

6. JUSTIFICATION-State the specific energy problem or objective, and specify how the proposal will contribute to the solution of the problem
or attainment of the objective. Inclurte reasons for selecting the recommended approach over other attenting. Also inclure the benefits
expected to be derived from manting the objectives or solving the problems for which the project is proposed. Outline the prkuncertain
(R/U), plens to minimize R/U, and basis for proceeding in face of R/U. Quantitative data should be used to the fullest extent,

.

Approximately 20% of the current U.S. energy consumption is used to generate electric Solar Thermal Electric Power Systems are estimated to be able to provide up to 30% electri capacity. In addition, their collection sub-systems could provide thermal energy for proc heat for decentralized (local) and/or centralized applications. Other advantages associat with these systems are:

[ocr errors][ocr errors]

Energy production facilities can be essentially colocated with the demand centers to be served, resulting in negligable transportation costs.

The energy sources is limitless

The energy source is widely distributed.

The conversion systems are relatively pollution free.

The conversion systems have minimal associated safety or waste discharge problems.

The objective of this subprogram is to demonstrate solar thermal system capability to provide widespread production of load following electric energy, with a potential for meeting baseload requirements for electric utilities, and total energy systems for military and other installations. The subprogram plans to generate more than 15e from pilot plants by FY 1979 and a total of more than 125Me from pilot and demonstration plants by Y 1984. Th demonstration of a Total Solar Energy System for an Industrial Load Center project is not provided for in this subprogram. It is contained in the accelerated subprogram. Other projects are stretched out and reduced in scope and funding in comparision to the accelerat program.

Capital equipment costs have been estimated at $4.50 800/Ke of installed capacity for load following electrical systems. The cost for generating conventional peak ocwer 10 estimated to be 25-45 mills/KH in the Southwestern U.S., slightly higher costs are estimated in the Southeastern U.S. The estimated useful life of all systems is 25 years. Delivered costs of $2-3/3TV are estimated for total energy systems. Commercial operation and availability is estimated to occur in FY 1988, as opposed to FY 1933 in the accelerated Bubprogram. First year production capacity is estimated to be two 500 Me plants.

Implementation of this plan will stimulate several industries. These include:

glass or plastic sheets (for reflectors-approx. 6 months output of one float glass line per 100 Me capacity)

aluminum and silver coating (for reflectors-approx. 50 tons of aluminum per 100 e capacity)

heat pipes (potentially incorporated in systems for heat transmission)

Several system

There are no fundamental technical barriers requiring basic research. concepts will be tested to verify overall performance and economics. A major factor presently limiting performance is the low plant capacity factor (estimated at approximately 33%) unless thermal storage is provided. Efforts are currently underway to define the technical and economic parameters of a variety of solar thermal conversion concepts. There are also ongoing sub-system and component R&D activities including development of scale model collectors and high efficiency solar absorption coatings. In addition, the entire Solar Total Energy Concept is being examined and assessed at NSF, AEC, and DOD laboratories, and under DO contracts.

CHEDULE #include major lucilities and major equipment. Indirate dates by Fiscal Year and Quarter).

& DEVELOPMENT MILESTONES (number auch consecutively)

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

75

b. Construct Pilot Plant (200 KWe, 2 Muth)

76

c. Construct Demonstration Plant (10 Me, 200 MWth)

78

568

[blocks in formation]

377 3 179

4

3 84

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

(Continue to next column)

[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

NOTE: I

1241

[ocr errors]

2.5

2.5 12

10

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

FY 1978

[ocr errors]

Outlays Obls.

25

[blocks in formation]

25

30

14

18

18

30

.

3.8

1.8

4.8 6.8 7.5 7.5

[merged small][merged small][merged small][merged small][ocr errors]

S

n

[blocks in formation]
[blocks in formation]
[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

35

33

126.1

113

239.1

2.5

11.

20.8

25.5

30

34

113.1

126

239.1

eoperative programs are proposed, Indicate the amount by year of both private and Federal government funding. A brief description of the Cooperative programs and the rationale for the division of funding

« PreviousContinue »