maintain, operate and train on aircraft from locations up to a mile away from their hangar. In addition, two airfield waivers would be required because of the elimination of a peripheral and rear taxiway. The squadrons will be unable to operate and maintain their aircraft in an effective manner. Parking aircraft distant to maintenance hangars is also a quality of life issue as it adversely impacts the work environment. 12. Supplemental Data: A. Estimated Design Data: (Parametric estimates have been used to develop project costs. Project design conforms to Part II of Military Handbook 1190, Facility Planning and Design guide) B. Equipment associated with this project which will be provided from other appropriations: NONE. Form DD 1 Dec 76 1391C Submitted to Congress Page No. 93 Activity POC: ENS DUONG TAM ANH Phone No: (805)-989-2383 JOINT USE CERTIFICATION: 7. Project Number 267 The Deputy Chief of Naval Operations (Fleet Logistics and Readiness) certifies that this project has been considered for joint use potential. Unilateral construction is recommended. The reason for this recommendation is: This is an installation utility/infrastructure project and does not qualify for joint use at this location. However, all tenants on this installation are benefited by this project. Form DD Dec 76 1391C Submitted to Congress Page No. 94 Provide homeport facilities for approximately 54 warships, amphibious ships, Form DD Dec 76 1390 Submitted to Congress (Continued On DD 1390C) Page No. 95. and auxiliaries of the Pacific Fleet. Provide harbor and waterfront facilities, exchange, personnel support, athletic, recreational, berthing, messing, morale, and other logistics facilities. Page No. 96 Replace two of the three existing 3750 KVA transformers which provide electric power for ships berthing on the south side of Pier 2 with two new 5000 KVA (8,000 amp) transformers. Project includes duct bank, conduit, cable, control wire, fiber optic cable, programmable logic controller, concrete slabs and unit substations. Anti-terrorism/force protection features will be included. 11. Requirement: LS Adequate: LS Substandard: LS PROJECT: This project provides additional electric power required to double berth REQUIREMENT: Electrical power upgrades are required to meet the electric power Form DD 1 Dec 76 1391 (Continued On DD 1391C) Submitted to Congress Page No. 97 |