maintain, operate and train on aircraft from locations up to a mile away from their hangar. In addition, two airfield waivers would be required because of the elimination of a peripheral and rear taxiway. The squadrons will be unable to operate and maintain their aircraft in an effective manner. Parking aircraft distant to maintenance hangars is also a quality of life issue as it adversely impacts the work environment.

12. Supplemental Data:

A. Estimated Design Data: (Parametric estimates have been used to develop project costs. Project design conforms to Part II of Military Handbook 1190, Facility Planning and Design guide)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

B. Equipment associated with this project which will be provided from other appropriations: NONE.

Form

DD

1 Dec 76

1391C

Submitted to Congress

Page No. 93

[blocks in formation]

Activity POC: ENS DUONG TAM ANH Phone No: (805)-989-2383

JOINT USE CERTIFICATION:

7. Project Number 267

The Deputy Chief of Naval Operations (Fleet Logistics and Readiness) certifies that this project has been considered for joint use potential. Unilateral construction is recommended. The reason for this recommendation is:

This is an installation utility/infrastructure project and does not qualify for joint use at this location. However, all tenants on this installation are benefited by this project.

Form

DD Dec 76 1391C

Submitted to Congress

Page No. 94

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Provide homeport facilities for approximately 54 warships, amphibious ships,

Form

DD Dec 76 1390

Submitted to Congress

(Continued On DD 1390C)

Page No. 95.

[blocks in formation]

and auxiliaries of the Pacific Fleet. Provide harbor and waterfront facilities, exchange, personnel support, athletic, recreational, berthing, messing, morale, and other logistics facilities.

[blocks in formation]

Page No. 96

[blocks in formation]

Replace two of the three existing 3750 KVA transformers which provide electric power for ships berthing on the south side of Pier 2 with two new 5000 KVA (8,000 amp) transformers. Project includes duct bank, conduit, cable, control wire, fiber optic cable, programmable logic controller, concrete slabs and unit substations. Anti-terrorism/force protection features will be included.

11. Requirement: LS

Adequate: LS

Substandard: LS

PROJECT:

This project provides additional electric power required to double berth
CG (Cruiser) and DDG (Destroyer) class ships at Pier 2. (Current mission)

REQUIREMENT:

Electrical power upgrades are required to meet the electric power

Form

DD

1 Dec 76 1391

(Continued On DD 1391C)

Submitted to Congress

Page No. 97