FY 2003 MILITARY CONSTRUCTION PROGRAM 1. Component NAVY 3. Installation and Location/UIC:N64482 NAVAL AND MARINE CORPS INSTALLATIONS VARIOUS LOCATIONS 4. Project Title PLANNING AND DESIGN (continued) CURRENT SITUATION: IMPACT IF NOT PROVIDED: 314 2. Date 2/12/C2 7. Project Number 203 12. Supplemental Data: A. Estimated Design Data: (Parametric estimates have been used to develop project costs. Project design conforms to Part II of Military Handbook 1190, Facility Planning and Design guide) B. Equipment associated with this project which will be provided from other appropriations: NONE. Page No. 386 1. Component NAVY FY 2003 MILITARY CONSTRUCTION PROGRAM 3. Installation and Location/UIC:N64482 NAVAL AND MARINE CORPS INSTALLATIONS VARIOUS LOCATIONS 4. Project Title PLANNING AND DESIGN (...continued) Activity POC: CDR BOB MCLEAN Phone No: 703-604-9992 314 2. Date 2/12/02 7. Project Number Page No. 387-388 Projects authorized by Title 10 USC 2805 not otherwise authorized by law having an approved cost of $1,500,000 or less, including construction, alteration, or conversion of permanent or temporary facilities. Projects intended solely to correct a deficiency that is life-threatening, health-threatening, or safety-threatening, may have an approved cost equal to cr less than $3,000,000. Total request includes funds for supervision, inspection, and overhead. 11. Requirement: LS PROJECT: Adequate: LS Substandard: LS Title 10 USC 2805 provides authority to the Secretary of Defense and the Page No. 389 1. Component NAVY FY 2003 MILITARY CONSTRUCTION PROGRAM 3. Installation and Location/UIC:N64481 NAVAL AND MARINE CORPS INSTALLATIONS VARIOUS LOCATIONS 4. Project Title UNSPECIFIED MINOR CONSTRUCTION continued) CURRENT SITUATION: IMPACT IF NOT PROVIDED: 315 2. Date 2/12/02 7. Project Number 203 12. Supplemental Data: A. Estimated Design Data: (Parametric estimates have been used to develop project costs. Project design conforms to Part II of Military Handbook 1190, Facility Planning and Design guide) B. Equipment associated with this project which will be provided from other appropriations: NONE. Page No. 390 |