B. Equipment associated with this project which will be provided from other appropriations: NONE.

C. FY 2001 Unaccompanied Housing Real Property Maintenance Conducted: $148,000

D. FY 2002 Unaccompanied Housing Real Property Maintenance Conducted: $306,000

E. Future Unaccompanied Housing Real Property Maintenance Requirements: $4,413,000

Activity POC: ENS JAMES EVANS Phone No: (757) 887-4516

JOINT USE CERTIFICATION:

The Deputy Chief of Naval Operations (Fleet Logistics and Readiness) certifies that this project has been considered for joint use potential. construction is recommended. The reason for this recommendation is:

Unilateral

This facility can be used by other components on an as available basis; however, the scope of the project is based on Navy requirements.

Form

DD

1 Dec 76 1391C

Submitted to Congress

Page No. 274

77-860 D-01--9

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Provide support on west coast for the operational TRIDENT system of submarines and long range missiles, including processing capability for assembly and disassembly of both explosive and non-explosive components of the TRIDENT II (D-5) missile.

Note: Block 6a and 6b personnel strength numbers are for Host Activity,

Form

DD1 Dec 76 1390

Submitted to Congress

(Continued On DD 1390C)

Page No. 275

[blocks in formation]

Note: The Block 7a and 7b is the Total Acreage number for SUBBASE, Bangor, Washington.

[blocks in formation]

Page No. 276

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

This project constructs a reinforced concrete Missile Spares Storage Building (MSSB). The MSSB will have an interior clear height of 7.62 meters, will contain a covered loading dock, ramp, space for material handling, receiving, shipping, rack storage, classified storage and interior office space for MSSB personnel and will be provided with fire and lightning protection. The MSSB will be environmentally controlled and will be equipped with a 5 ton bridge crane. 11. Requirement:

2,787 m2

Adequate: 0m2

Substandard:

0m2

PROJECT:

This project provides a Missile Spares Storage Building. (New mission)

REQUIREMENT:

A Missile Spares Storage Facility is required to provide a central facility for storage, shipping, staging and issue of missile inert components in support of TRIDENT II (DS) missile production processing.

[blocks in formation]

Page No. 277

[blocks in formation]

A TRIDENT II Supply Facility does not currently exist at this base. The Motor Spares Storage Building constructed to support the TRIDENT I (C4) program in 1976 collapsed in 1996, and the existing program uses existing production and storage facilities to support the TRIDENT I program.

IMPACT IF NOT PROVIDED:

Strategic Weapons Facility Pacific will be incapable of providing adequate storage and control of missile inert components and motors in support of TRIDENT II missile production and processing operations.

12. Supplemental Data:

A. Estimated Design Data: (Parametric estimates have been used to develop project costs. Project design conforms to Part II of Military Handbook 1190, Facility Planning and Design guide)