A. Estimated Design Data: (Parametric estimates have been used to develop project costs. Project design conforms to Part II of Military Handbook 1190, Facility Planning and Design guide) B. Equipment associated with this project which will be provided from other appropriations: NONE. Submitted to Congress Page No. 253 The Deputy Chief of Naval Operations (Fleet Logistics and Readiness) certifies that this project has been considered for joint use potential. Unilateral construction is recommended. The reason for this recommendation is: This is an installation utility/infrastructure project and does not qualify for joint use at this location. However, all tenants on this installation are Submitted to Congress Page No. 254 Develop, in coordination with agencies and representatives of other (Continued On DD 1390C) Form DD 1 Dec 76 1390 Submitted to Congress Page No. 255 services, the doctrine, tactics, techniques and equipment employed by landing forces in amphibious operations; support Marine Corps requirements for long range planning by identifying required study areas and by initiating study of such areas, in coordination with other government and civilian contract agencies; educate officers in the principles, tactics and techniques of warfare, with particular emphasis on the landing force aspects of amphibious operations in air-ground combat forces of the Marine Corps; educate staff noncommissioned officers with the requisite responsibilities; exercise academic supervision over all Marine Corps formal schools (less recruit training); and other functions as directed by the Commandant of the Marine Corps. Submitted to Congress Page No. 256 Construct a one-story reinforced concrete and steel building with concrete foundation and structural floor. The building will have a built-up roof on reinforced deck, intrusion detection system, telephone and telecommunications, fire protection system, sound attenuation, heating/air conditioning system, loading dock, built-in air compressor, paving, parking, fence and site improvements at Weapons Training Battalion (WTBn). The facility will be constructed to seismic zone three and current armory, ammunition loading and weapons test facility standards. Also includes technical operating manuals and Anti-Terrorism/Force Protection features. Form DD Dec 76 1391 Submitted to Congress (Continued On DD 1391C) Page No. 257 |