vided in § 20-1.5405-2 in the following circumstances:

(i) Where the offeror or contractor prepares specifications which are to be used in competitive procurements of products or services covered by such specifications.

(ii) Where the offeror or contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using such approaches or methodologies.

(iii) Where the offeror or contractor is granted access to information not available to the public concerning NRC plans, policies, or programs which could form the basis for a later procurement action.

(iv) Where the offeror or contractor is granted access to proprietary information of its competitors.

(v) Where the award of a contract might otherwise result in placing the offeror or contractor in a conflicting role in which its judgment may be biased in relation to its work for the NRC or may otherwise result in an unfair competitive advantage for the offeror or contractor.

(c) Policy application guidance. The following examples are illustrative only and are not intended to identify and resolve all contractor organizational conflict of interest situations.

(1) Example. The XYZ Corp., in response to a request for proposal (RFP), proposes to undertake certain analyses of a reactor component as called for in the RFP. The XYZ Corp. is one of several companies considered to be technically well qualified. In response to the inquiry in the RFP, the XYZ Corp. advises that it is currently performing similar analyses for the reactor manufacturer.

Guidance. An NRC contract for that particular work normally would not be awarded to the XYZ Corp. because it would be placed in a position in which its judgment could be biased in relationship to its work for NRC. Since there are other well-qualified companies available, there would be reason for considering a waiver of the policy.

no

(2) Example. The ABC Corp., in response to a RFP, proposes to perform certain analyses of a reactor compo

nent which are unique to one type of advanced reactor. As is the case with other technically qualified companies responding to the RFP, the ABC Corp. is performing various projects for several different utility clients. None of the ABC Corp. projects have any relationship to the work called for in the RFP. Based on the NRC evaluation, the ABC Corp. is considered to be the best qualified company to perform the work outlined in the RFP.

Guidance. An NRC contract normally could be awarded to the ABC Corp. because no conflict of interest exists which would motivate bias with respect to the work. An appropriate clause would be included in the contract to preclude the ABC Corp. from subsequently contracting for work during the performance of the NRC contract with the private sector which could create a conflict. For example, ABC Corp. would be precluded from the performance of similar work for the company developing the advanced reactor mentioned in the example.

(3) Example. As a result of operating problems in a certain type of commercial nuclear facility, it is imperative that NRC secure specific data on various operational aspects of that type of plant so as to assure adequate safety protection of the public. Only one manufacturer has extensive experience with that type of plant. Consequently, that company is the only one with whom NRC can contract which can develop and conduct the testing programs required to obtain the data in reasonable time. That company has a definite interest in any NRC decisions that might result from the data produced because those decisions affect the reactor's design and thus the company's costs.

Guidance. This situation would place the manufacturer in a role in which its judgment could be biased in relationship to its work for NRC. Since the nature of the work required is vitally important in terms of NRC's responsibilities and no reasonable alternative exists, a waiver of the policy may be warranted. Any such waiver shall be fully documented and coordinated in accordance with the waiver provisions of this policy with particular attention to the establishment of

[blocks in formation]

(4) Example. The ABC Co. submits a proposal for a new system for evaluating a specific reactor component's performance for the purpose of developing standards that are important to the NRC program. The ABC Co. has advised NRC that it intends to sell the new system to industry once its practicability has been demonstrated. Other companies in this business are using older systems for evaluation of the specific reactor component.

Guidance. A contract could be awarded to the ABC Co. provided that the contract stipulates that no information produced under the contract will be used in the contractor's private activities unless such information has been reported to NRC. Information which is reported to NRC by contractors will normally be disseminated by NRC to others so as to preclude an unfair competitive advantage that might otherwise accrue. When NRC furnishes information to the contractor for the performance of contract work, it shall not be used in the contractor's private activities unless such information is generally available to others. Further, the contract will stipulate that the contractor will inform the NRC contracting officer of all situations in which the information developed under the contract is proposed to be used.

(5) Example. The ABC Corp., in response to a RFP proposes to assemble a map showing certain seismological features of the Appalachian fold belt. In accordance with the representation in the RFP and § 20-1.5403(b)(1)(i), ABC Corp. informs the NRC that it is presently doing seismological studies for several utilities in the Eastern United States but none of the sites are within the geographic area contemplated by the NRC study.

Guidance. The contracting officer would normally conclude that award of a contract would not place ABC Corp. in a conflicting role where its judgment might be biased. The work for others clause of § 20-1.5405-1(c) would preclude ABC Corp. from accepting work during the term of the NRC contract which could create a conflict of interest.

(d) Other considerations. (1) The fact that the NRC can identify and later avoid, eliminate, or neutralize any potential organizational conflicts arising from the performance of a contract is not relevant to a determination of the existence of such conflicts prior to the award of a contract.

(2) It is not relevant that the contractor has the professional reputation of being able to resist temptations which arise from organizational conflicts of interest, or that a follow-on procurement is not involved, or that a contract is awarded on a competitive or a sole source basis.

§ 20-1.5404 Representation.

(a) The following procedures are designed to assist the NRC contracting officer in determining whether situations or relationships exist which may constitute organizational conflicts of interest with respect to a particular offeror or contractor.

(b) Representation procedure. The following organizational conflicts of interest representation provision shall be included in all solicitations and unsolicited proposals for: (1) Evaluation services or activities; (2) technical consulting and management support services; (3) research; and (4) other contractual situations where special organizational conflicts of interest provisions are noted in the solicitation and would be included in the resulting contract. This representation requirement shall also apply to all modifications for additional effort under the contract except those issued under the "changes" clause. Where, however, a statement of the type required by the organizational conflicts of interest representation provision has previously been submitted with regard to the contract being modified, only an updating of such statement shall be required.

ORGANIZATIONAL CONFLICTS OF
INTEREST REPRESENTATION

I represent to the best of my knowledge and belief that:

The award to of a contract or the modification of an existing contract does () or does not ( ) involve situations or relationships of the type set forth in 41 CFR § 20-1.5403(b)(1).

(c) Instructions to offerors. The following shall be included in all NRC solicitations: (1) If the representation as completed indicates that situations or relationships of the type set forth in 41 CFR 20-1.5403(b)(1) are involved, or the contracting officer otherwise determines that potential organizational conflicts exist, the offeror shall provide a statement in writing which describes in a concise manner all relevant facts bearing on his representation to the contracting officer. If the contracting officer determines that organizational conflicts exist, the following actions may be taken: (i) Impose appropriate conditions which avoid such conflicts, (ii) disqualify the offeror, or (iii) determine that it is otherwise in the best interest of the United States to seek award of the contract under the waiver provisions of § 20-1.5411.

(2) The refusal to provide the representation required by § 20-1.5404(b) or upon request of the contracting officer the facts required by § 20-1.5404(c), shall result in disqualification of the offeror for award. The nondisclosure or misrepresentation of any relevant interest may also result in the disqualification of the offeror for award; or if such nondisclosure or misrepresentation is discovered after award, the resulting contract may be terminated. The offeror may also be disqualified from subsequent related NRC contracts and be subject to such other remedial actions provided by law or the resulting contract.

(d) The offeror may, because of actual or potential organizational conflicts of interest, propose to exclude specific kinds of work from the statements of work contained in a RFP unless the RFP specifically prohibits such exclusion. Any such proposed exclusion by an offeror will be considered by the NRC in the evaluation of proposals. If the NRC considers the proposed excluded work to be an essential or integral part of the required work and its exclusion would work to

the detriment of the competitive posture of the other offerors, the proposal must be rejected as unacceptable.

(e) The offeror's failure to execute the representation required by paragraph (b) of this section with respect to invitation for bids will be considered to be a minor informality, and the offeror will be permitted to correct the omission.

§ 20-1.5405 Contract clauses.

§ 20-1.5405-1 General contract clause.

All contracts of the types set forth in § 20-1.5404(b) shall include the following clauses:

(a) Purpose. The primary purpose of this clause is to aid in ensuring that the contractor: (1) Is not placed in a conflicting role because of current or planned interest (financial, contractual, organizational, or otherwise) which relate to the work under this contract, and (2) does not obtain an unfair competitive advantage over other parties by virtue of its performance of this contract.

(b) Scope. The restrictions described herein shall apply to performance or participation by the contractor as defined in 41 CFR § 20-1.5402(f) in the activities covered by this clause.

(c) Work for others. Notwithstanding any other provision of this contract, during the term of this contract, the contractor agrees to forgo entering into consulting or other contractual arrangements with any firm or organization, the result of which may give rise to a conflict of interest with respect to the work being performed under this contract. The contractor shall ensure that all employees who are employed full time under this contract and employees designated as key personnel, if any, under this contract abide by the provision of this clause. If the contractor believes with respect to itself or any such employee that any proposed consultant or other contractual arrangement with any firm or organization may involve a potential conflict of interest, the contractor shall obtain the written approval of the contracting officer prior to execution of such contractual arrangement.

(d) Disclosure after award. (1) The contractor warrants that to the best of its knowledge and belief and except as otherwise set forth in this contract, it does not have any organizational conflicts of interest, as defined in 41 CFR 20-1.5402(a).

(2) The contractor agrees that if after award it discovers organizational conflicts of interest with respect to this contract, it shall make an immediate and full disclosure in writing to the contracting officer. This statement shall include a description of the action which the contractor has taken or proposes to take to avoid or mitigate such conflicts. The NRC may, however, terminate the contract for convenience if it deems such termination to be in the best interests of the government.

(e) Access to and use of information. (1) If the contractor in the performance of this contract obtains access to information, such as NRC plans, policies, reports, studies, financial plans, internal data protected by the Privacy Act of 1974 (Pub. L. 93-579), or data which has not been released to the public, the contractor agrees not to: (i) Use such information for any private purpose until the information has been released to the public; (ii) compete for work for the Commission based on such information for a period of six (6) months after either the completion of this contract or the release of such information to the public, whichever is first, (ii) submit an unsolicited proposal to the government based on such information until one year after the release of such information to the public, or (iv) release the information without prior written approval by the contracting officer unless such information has previously been released to the public by the NRC.

(2) In addition, the contractor agrees that to the extent it receives or is given access to proprietary data, data protected by the Privacy Act of 1974 (Pub. L. 93-579), or other confidential or privileged technical, business, or financial information under this contract, the contractor shall treat such information in accordance with restrictions placed on use of the information.

(3) The contractor shall have, subject to patent and security provisions of this contract, the right to use technical data it produces under this contract for private purposes provided that all requirements of this contract have been met.

(f) Subcontracts. Except as provided in 41 CFR 20-1.5402(h), the contractor shall include this clause, including this paragraph, in subcontracts of any tier. The terms "contract," "contractor," and "contracting officer," shall be appropriately modified to preserve the government's rights.

(g) Remedies. For breach of any of the

above proscriptions or for intentional nondisclosure or misrepresentation of any relevant interest required to be disclosed concerning this contract or for such erroneous representations as necessarily imply bad faith, the government may terminate the contract for default, disqualify the contractor from subsequent contractual efforts, and pursue other remedies as may be permitted by law or this contract.

(h) Waiver. A request for waiver under this clause shall be directed in writing through the contracting officer to the Executive Director for Operations (EDO) in accordance with the procedures outlined in § 20-1.5411.

20-1.5405-2 Special contract provisions.

(a) If it is determined from the nature of the proposed contract that organizational conflicts of interest exist, the contracting officer may determine that such conflict can be avoided or after obtaining a waiver in accordance with § 20-1.5411, neutralized through the use of an appropriate special contract provision. If appropriate, the offeror may negotiate the terms and conditions of these clauses, including the extent and time period of any such restriction. These provisions include but are not limited to:

(1) Hardware exclusion clauses which prohibit the acceptance of production contracts following a related nonproduction contract previously performed by the contractor;

(2) Software exclusion clauses;

(3) Clauses which require the contractor (and certain of his key personnel) to avoid certain organizational conflicts of interest; and

(4) Clauses which provide for protection of confidential data and guard against its unauthorized use.

(b) The following additional contract clause may be included as section (i) in the clause set forth in § 20-1.5405-1 when it is determined that award of a follow-on contract would constitute an organizational conflict of interest.

(1) Follow-on effort. (1) The contractor shall be ineligible to participate in NRC contracts, subcontracts, or proposals therefor

(solicited or unsolicited) which stem directly from the contractor's performance of work under this contract. Furthermore, unless so directed in writing by the contracting officer, the contractor shall not perform any technical consulting or management support services work or evaluation activities under this contract on any of its products or services or the products or services of another firm if the contractor has been substantially involved in the development or marketing of such products or services.

(2) If the contractor under this contract prepares a complete or essentially complete statement of work or specifications, the contractor shall be ineligible to perform or participate in the initial contractual effort which is based on such statement of work or specifications. The contractor shall not incorporate its products or services in such statement of work or specifications unless so directed in writing by the contracting officer, in which case the restriction in this subparagraph shall not apply.

(3) Nothing in this paragraph shall preclude the contractor from offering or selling its standard commercial items to the government.

§ 20-1.5406 Evaluation, findings, and contract award.

The contracting officer will evaluate all relevant facts submitted by an offeror pursuant to the representation requirements of § 20-1.5404(b) and other relevant information. After evaluating this information against the criteria of § 20-1.5403, a finding will be made by the contracting officer whether organizational conflicts of interest exist with respect to a particu

lar offeror. If it has been determined that conflicts of interest exist, then the contracting officer shall either:

(a) Disqualify the offeror from award,

(b) Avoid or eliminate such conflicts by appropriate measures; or

(c) Award the contract under the waiver provision of § 20-1.5411.

[blocks in formation]

such conflicts do, in fact, exist and that it would not be in the best interests of the government to terminate the contract as provided in the clauses required by § 20-1.5405, the contracting officer will take every reasonable action to avoid, eliminate, or, after obtaining a waiver in accordance with § 20-1.5411, neutralize the effects of the identified conflict.

§ 20-1.5408-20-1.5409 [Reserved]

§ 20-1.5410 Subcontracts.

The contracting officer shall require offerors and contractors to submit a representation statement in accordance with § 20-1.5404(b) from subcontractors and consultants. The contracting officer shall require the contractor to include contract clauses in accordance with § 20-1.5405 in consultant agreements or subcontracts involving performance of work under a prime contract covered by this subsection.

§ 20-1.5411 Waiver.

(a) In the first instance, determination with respect to the need to seek a waiver for specific contract awards shall be made by the contracting officer with the advice and concurrence of the program office director and the Office of Executive Legal Director. Upon the recommendation of the con

tracting officer, and after consultation

with the Office of the General Counsel, the EDO may waive the policy in specific cases if he determines that it is in the best interest of the United States to do so.

(b) Such action shall be strictly limited to those situations in which: (1) The work to be performed under contract is vital to the NRC program; (2) the work cannot be satisfactorily performed except by a contractor whose interests give rise to a question of conflict of interest; and (3) contractual and/or technical review and supervision methods can be employed by NRC to neutralize the conflict. For any such waivers, the justification and