Copper (unalloyed): Bar, rod, shapes, wire (except electrical wire). Sheet, strip, plate, rolls.. Pipe, tube (seamless).. Copper-base alloy: Bar, rod, wire, shapes. Sheet, strip, plate, rolls, military ammunition cups and discs.. Pipe, tube (seamless). Copper wire mill products: Copper wire and cable: Insulated building wire.. Paper and lead power cable. Paper and lead telephone cable.. Asbestos cable... Rolled armor plate is subject to negotiation between mill and its customer. If no acceptable arrangements are worked out, BDSA should be notified. Applies to special rolled shapes including angles and channels. ? For welded tubing or high carbon spring steel strip, 75 days. If cold-finished, add an additional 15 days. Lead time applies to unmachined castings after approval of patterns for production. 10 For refractory alloys, 60 days. 11 Small simple castings to fit 12 x 16 inch flask, 7 days. By negotiation between mill and its customer. If no acceptable arrangements are worked out, BDSA should be notified. SCHEDULE IV TO DMS RÉG. 1-MINIMUM MILL QUANTITIES-Continued 1 See definitions contained in footnotes to Schedule I of this regulation. ? All stainless steel products are by negotiation. If no acceptable arrangments are worked out, BDSA should be notified. 3 By negotiation between mill and its customer. If no acceptable arrangements are worked out, BDSA should be notified. Published carload minimum (mixed sizes and grades). Quantity refers to any assortment of wire merchant trade products For forging quality, product of one heat. Product of one heat. Standard package quantities as published by each mill. 'Standard minimum quantities as established by each mill. SCHEDULE V TO DMS REG. 1-FORM FOR STATEMENT OF REQUIREMENTS FOR CLASS A PRODUCTS (See Section 4(b)) 5. Quantity of Listed Controlled Materials required to required to produce product or item described in Block 4. unit(s) of the terials categories. In no case should the further breakdown requested be in any greater detail than the listing on Form DMS4S. Such further breakdown, if requested, must be supplied on this Form DMS-6 or on a separate sheet to be attached to this form. He must fill in the name and address of his company in Block 3 and enter a description of the Class A product for which the information is requested in Block 4. He should also send his supplier, with copies of the form, a letter describing the information he desires, the number of copies he needs, and the time when they should be submitted to him. He should also refer to Sec |