1252.217-78 Discharge of liens.

As prescribed at 1217.7000 (a) and (b), insert the following clause:

DISCHARGE OF LIENS (OCT 1994)

(a) The Contractor shall immediately discharge or cause to be discharged, any lien or right in rem of any kind, other than in favor of the Government, that exists or arises in connection with work done or materials furnished under this contract.

(b) If any such lien or right in rem is not immediately discharged, the Government, at the expense of the Contractor, may discharge, or cause to be discharged, the lien or right.

(End of clause)

1252.217-79 Delays.

As prescribed at 1217.7000 (a) and (b), insert the following clause:

DELAYS (OCT 1994)

When during the performance of this contract the Contractor is required to delay work on a vessel temporarily, due to orders or actions of the Government respecting stoppage of work to permit shifting the vessel, stoppage of hot work to permit bunkering, stoppage of work due to embarking or debarking passengers and loading or discharging cargo, and the Contractor is not given sufficient advance notice or is otherwise unable to avoid incurring additional costs on account thereof, an equitable adjustment shall be made in the price of the contract pursuant to the "Changes" clause.

(End of clause)

1252.217-80 Department of Labor safety and health regulations for ship repairing.

As prescribed at 1217.7000 (a) and (b), insert the following clause:

DEPARTMENT OF LABOR SAFETY AND HEALTH REGULATIONS FOR SHIP REPAIR (OCT 1994)

Nothing contained in this contract shall relieve the Contractor of any obligations it may have to comply with

(a) The Occupational Safety and Health Act of 1970 (29 U.S.C. 651, et seq.);

(b) The Safety and Health Regulations for Ship Repairing (29 CAR part 1915); or

(c) Any other applicable Federal, State, and local laws, codes, ordinances, and regulations.

[blocks in formation]

(b) If the Contractor or any subcontractor has a guarantee for work performed or materials furnished that exceeds the 60 day period, the Government shall be entitled to rely upon the longer guarantee until its expiration.

(c) With respect to any individual work item identified as incomplete at the time of redelivery of the vessel(s), the guarantee period shall run from the date the item is completed.

(d) If practicable, the Government shall give the Contractor an opportunity to correct the deficiency.

(1) If the Contracting Officer determines it is not practicable or is otherwise not advisable to return the vessel(s) to the Contractor, or the Contractor fails to proceed with the repairs promptly, the Contracting Officer may direct that the repairs be performed elsewhere, at the Contractor's expense.

(2) If correction and repairs are performed by other than the Contractor, the Contracting Officer may discharge the Contractor's liability by making an equitable deduction in the price of the contract.

(e) The Contractor's liability shall extend for an additional 90 day guarantee period on those defects or deficiencies that the Contractor corrected.

(f) At the option of the Contracting officer, defects and deficiencies may be left uncorrected. In that event, the Contractor and Contracting Officer shall negotiate an equitable reduction in the contract price. Failure to agree upon an equitable reduction shall constitute a dispute under the Disputes clause of this contract.

[blocks in formation]

SMALL BUSINESS AND SMALL DISADVANTAGED BUSINESS SUBCONTRACTING REPORTING (OCT 1994)

(a) The Contractor shall submit the Summary Subcontract Report (Standard Form 295 (SF-295)) to the Department of Transportation, Office of the Secretary, Office of Small and Disadvantaged Business Utilization (S-42), 400 7th St., SW, Washington, DC, 20590.

(b) The Contractor shall include this clause in all subcontracts that include the clause at (FAR) 48 CFR 52.219-9.

(End of clause)

[59 FR 40288, Aug 8, 1994, as amended at 62 FR 26420, May 14, 1997]

1252.220-90 Local hire. (USCG)

As prescribed in USCG guidance at (TAR) 48 CFR 1220.9001, insert the following clause:

LOCAL HIRE (OCT 1994)

The Contractor shall employ, for the purpose of performing this contract in whole or in part in a State that has an unemployment rate in excess of the national average rate of unemployment (as defined by the Secretary of Labor), individuals who are local residents and who, in the case of any craft or trade, possess or would be able to acquire promptly the necessary skills. Local Resident means a resident or an individual who commutes daily to that State.

(End of clause)

[64 FR 2439, Jan. 14, 1999]

1252.222-70 Strikes or picketing affecting timely completion of the contract work.

As prescribed in (TAR) 48 CFR 1222.101-71(a), insert the following clause:

STRIKES OR PICKETING AFFECTING TIMELY COMPLETION OF THE CONTRACT WORK (OCT 1994)

Notwithstanding any other provision hereof, the Contractor is responsible for delays arising out of labor disputes, including but not limited to strikes, if such strikes are reasonably avoidable. A delay caused by a strike or by picketing which constitutes an unfair labor practice is not excusable unless the Contractor takes all reasonable and appropriate action to end such a strike or picketing, such as the filing of a charge with the National Labor Relations Board, the use of other available Government procedures, and

the use of private boards or organizations for the settlement of disputes.

(End of clause)

1252.222-71 Strikes or picketing affecting access to a DOT facility.

As prescribed in (TAR) 48 CFR 1222.101-71(b), insert the following clause:

STRIKES OR PICKETING AFFECTING ACCESS TO A DOT FACILITY (OCT 1994)

If the Contracting Officer notifies the Contractor in writing that a strike or picketing: (a) is directed at the Contractor or subcontractor or any employee of either; and (b) impedes or threatens to impede access by any person to a DOT facility where the site of the work is located, the Contractor shall take all appropriate action to end such strike or picketing, including, if necessary, the filing of a charge of unfair labor practice with the National Labor Relations Board or the use of other available judicial or administrative remedies.

(End of clause)

1252.223-70 Removal or disposal of hazardous substances-applicable licenses and permits.

As prescribed in (TAR) 48 CFR 1223.303, insert the following clause: REMOVAL OR DISPOSAL OF HAZARDOUS SUBSTANCES APPLICABLE LICENSES AND PERMITS (DEC 1997)

The Contractor must have all licenses and permits required by Federal, state, and local laws to perform hazardous substance(s) removal or disposal services. If the Contractor does not currently possess these documents, it must obtain all requisite licenses and permits within days after date of award. The Contractor shall provide evidence of said documents to the Contracting Officer or designated Government representative prior to commencement of work under the contract. (End of clause)

[62 FR 67752, Dec. 30, 1997]

1252.223-71 Accident and fire reporting.

As prescribed in (TAR) 48 CFR 1223.7000(a), insert the following clause:

ACCIDENT AND FIRE REPORTING (OCT 1994) (a) The Contractor shall report to the Contracting Officer any accident or fire occurring at the site of the work which causes:

(1) A fatality or as much as one lost workday on the part of any employee of the Contractor or subcontractor at any tier;

(2) Damage of $1,000 or more to Federal property, either real or personal;

(3) Damage of $1,000 or more to Contractor or subcontractor owned or leased motor vehicles or mobile equipment; or

(4) Damage for which a contract time extension may be requested.

(b) Accident and fire reports required by paragraph (a) of this section shall be accomplished by the following means:

(1) Accidents or fires resulting in a death, hospitalization of five or more persons, or destruction of Federal property (either real or personal), the total value of which is estimated at $100,000 or more, shall be reported immediately by telephone to the Contracting Officer or his/her authorized representative and shall be confirmed by telegram or facsimile transmission within 24 hours to the Contracting Officer. Such telegram or facsimile transmission shall state all known facts as to extent of injury and damage and as to cause of the accident or fire.

(2) Other accident and fire reports required by paragraph (a) of this section may be reported by the Contractor using a state, private insurance carrier, or Contractor accident report form which provides for the statement of:

(i) The extent of injury; and

(ii) The damage and cause of the accident or fire.

Such report shall be mailed or otherwise delivered to the Contracting Officer within 48 hours of the occurrence of the accident or fire.

(c) The Contractor shall assure compliance by subcontractors at all tiers with the requirements of this clause.

(End of clause)

1252.223–72 Protection of human subjects.

As prescribed in (TAR) 48 CFR 1223.7000(b), insert the following clause: PROTECTION OF HUMAN SUBJECTS (OCT 1994) The Contractor shall comply with the National Highway Traffic Safety Administration (NHTSA) principles and procedures (in accordance with NHTSA Order 700-1, 700-3, and 700-4) for the protection of human subjects participating in activities supported directly or indirectly by contracts from DOT. A copy of the applicable NHTSA orders shall be provided to offerors and/or contractors upon request. In fulfillment of its assurance:

(a) A committee competent to review projects and activities that involve human subjects shall be established and maintained by the Contractor.

(b) The committee shall be assigned responsibility to determine for each activity planned and conducted that:

(1) The rights and welfare of subjects are adequately protected;

(2) The risks to subjects are outweighed by potential benefits; and

(3) The informed consent of subjects shall be obtained by methods that are adequate and appropriate.

(c) Committee reviews are to be conducted with objectivity and in a manner to ensure the exercise of independent judgment of the members. Members shall be excluded from review of projects or activities in which they have an active role or a conflict of interests. (d) Continuing constructive communication between the committee and the project directors must be maintained as a means of safeguarding the rights and welfare of subjects.

(e) Facilities and professional attention required for subjects who may suffer physical, psychological, or other injury as a result of participating in an activity shall be provided.

(f) The committee shall maintain records of committee review of applications and active projects, of documentation of informed consent, and of other documentation that may pertain to the selection, participation, and protection of subjects. Detailed records shall be maintained of circumstances of any review that adversely affects the rights or welfare of the individual subjects. Such materials shall be made available to DOT upon request.

(g) The retention period of such records and materials shall be as specified at (FAR) 48 CFR 4.703.

(h) Periodic reviews shall be conducted by the Contractor to assure, through appropriate administrative overview, that the practices and procedures designed for the protection of the rights and welfare of subjects are being effectively applied.

(NOTE: If the Contractor has a Department of Health and Human Services approved Institutional Review Board (IRB) which can appropriately review this contract in accordance with the technical requirements and NHTSA Orders 700-1, 700-3, and 700-4, that IRB will be considered acceptable for the purposes of this contract.

(End of clause)

1252.228-70 Loss of or damage to leased aircraft.

CFR As prescribed in (TAR) 48 1228.306-70 (a) and (b), insert the following clause:

LOSS OF OR DAMAGE TO LEASED AIRCRAFT (DEC 1997)

(a) The Government assumes all risk of loss of, or damage (except normal wear and tear) to, the leased aircraft during the term of this lease while the aircraft is in the possession of the Government.

(b) In the event of damage to the aircraft, the Government, at its option, shall make the necessary repairs with its own facilities or by contract, or pay the Contractor the reasonable cost of repair of the aircraft.

(c) In the event the aircraft is lost or damaged beyond repair, the Government shall pay the Contractor a sum equal to the fair market value of the aircraft at the time of such loss or damage, which value may be specifically agreed to in clause 1252.228-71, "Fair Market Value of Aircraft,' "less the salvage value of the aircraft. However, the Government may retain the damaged aircraft or dispose of it as it wishes. In that event, the Contractor will be paid the fair market value of the aircraft as stated in the clause.

(d) The Contractor agrees that the contract price does not include any cost attributable to hull insurance or to any reserve fund it has established to protect its interest in the aircraft. If, in the event of loss or damage to the leased aircraft, the Contractor receives compensation for such loss or damage in any form from any source, the amount of such compensation shall be:

(1) Credited to the Government in determining the amount of the Government's liability; or

(2) For an increment of value of the aircraft beyond the value for which the Government is responsible.

(e) In the event of loss of or damage to the aircraft, the Government shall be subrogated to all rights of recovery by the Contractor against third parties for such loss or damage and the Contractor shall promptly assign such rights in writing to the Government. (End of clause)

[blocks in formation]

(b) If the contractor has insured the same aircraft against loss or destruction in connection with other operations, the amount of such insurance coverage on the date of the loss or damage for which the Government may be responsible under this contract.

(End of clause)

1252.228-72 Risk and indemnities.

As prescribed in (TAR) 48 CFR 1228.306-70(a) and (d), insert the following clause:

RISK AND INDEMNITIES (DEC 1997)

The Contractor hereby agrees to indemnify and hold harmless the Government, its officers and employees from and against all claims, demands, damages, liabilities, losses, suits and judgments (including all costs and expenses incident thereto) which may be suffered by, accrue against, be charged to or recoverable from the Government, its officers and employees by reason of injury to or death of any person other than officers, agents, or employees of the Government or by reason of damage to property of others of whatsoever kind (other than the property of the Government, its officers, agents or employees) arising out of the operation of the aircraft. In the event the Contractor holds or obtains insurance in support of this covenant, evidence of insurance shall be delivered to the Contracting Officer.

(End of clause)

[62 FR 67752, Dec. 30, 1997]

1252.228-90 Notification of Miller Act payment bond protection. (USCG) As prescribed in USCG guidance at (TAR) 48 CFR 1228.106-490, insert the following clause:

NOTIFICATION OF MILLER ACT PAYMENT BOND PROTECTION (OCT 1994)

This notice clause shall be inserted by first tier subcontractors in all their subcontracts and shall contain the surety which has provided the payment bond under the prime contract.

(a) The prime contract is subject to the Miller Act (40 U.S.C. 270), under which the prime contractor has obtained a payment bond. This payment bond may provide certain unpaid employees, suppliers, and subcontractors a right to sue the bonding surety under the Miller Act for amounts owned for work performed and materials delivery under the prime contract.

(b) Persons believing that they have legal remedies under the Miller Act should consult their legal advisor regarding the proper steps to take to obtain these remedies. This notice

clause does not provide any party any rights against the Federal Government, or create any relationship, contractual or otherwise, between the Federal Government and any private party.

(c) The surety which has provided the payment bond under the prime contract is:

(Name)

(Street Address)

(City, State, Zip Code)

(Contact & Tel. No.)

(End of clause)

[64 FR 2439, Jan. 14, 1999]

1252.231-70 Date of incurrence of costs.

As prescribed in (TAR) 48 CFR 1231.205-32, insert the following clause:

DATE OF INCURRENCE OF COSTS (OCT 1994) The Contractor shall be entitled to reimbursement for costs incurred on or after in an amount not to exceed $ that, if incurred after this contract had been entered into, would have been reimbursable under this contract.

(End of clause)

1252.236-70 Special precautions for work at operating airports.

As prescribed in

(TAR) 48 CFR 1236.570, insert the following clause:

SPECIAL PRECAUTIONS FOR WORK AT
OPERATING AIRPORTS (OCT 1994)

(a) When work is to be performed at an operating airport, the Contractor must arrange its work schedule so as not to interfere with flight operations. Such operations will take precedence over construction convenience. Any operations of the Contractor which would otherwise interfere with or endanger the operations of aircraft shall be performed only at times and in the manner directed by the Contracting Officer. The Government will make every effort to reduce the disruption of the Contractor's operation.

(b) Unless otherwise specified by local regulations, all areas in which construction operations are underway shall be marked by yellow flags during daylight hours and by red lights at other times. The red lights along the edge of the construction areas within the existing aprons shall be the electric type of not less than 100 watts intensity placed and supported as required. All other construction markings on roads and adjacent

parking lots may be either electric or battery type lights. These lights and flags shall be placed so as to outline the construction areas and the distance between any two flags or lights shall not be greater than 25 feet. The Contractor shall provide adequate watch to maintain the lights in working condition at all times other than daylight hours. The hour of beginning and the hour of ending of daylight will be determined by the Contracting Officer.

(c) All equipment and material in the construction areas or when moved outside the construction area shall be marked with airport safety flags during the day and when directed by the Contracting Officer, with red obstruction lights at nights. All equipment operating on the apron, taxiway, runway, and intermediate areas after darkness hours shall have clearance lights in conformance with instructions from the Contracting Officer. No construction equipment shall operate within 50 feet of aircraft undergoing fuel operations. Open flames are not allowed on the ramp except at times authorized by the Contracting Officer.

(d) Trucks and other motorized equipment entering the airport or construction area shall do so only over routes determined by the Contracting Officer. Use of runways, aprons, taxiways, or parking areas as truck or equipment routes will not be permitted unless specifically authorized for such use. Flag personnel shall be furnished by the Contractor at points on apron and taxiway for safe guidance of its equipment over these areas to assure right of way to aircraft. Areas and routes used during the contract must be returned to their original condition by the Contractor. The maximum speed allowed at the airport shall be established by airport management. Vehicles shall be operated so as to be under safe control at all times, weather and traffic conditions considered. Vehicles must be equipped with head and tail lights during the hours of darkness.