Page images
PDF
EPUB

(e) The Government agrees that, when necessary, it shall indicate by security classification or administratively controlled designation, the degree of importance to the national defense of information to be furnished by the contractor to the Government or by the Government to the contractor, and the Government shall give written notice of such security classification or administratively controlled designation to the contractor and of any subsequent changes thereof. The contractor is authorized to rely on any letter or other written instrument signed by the Contracting Officer changing a security classification or administratively controlled designation of information.

(f) The contractor agrees to certify after completion of his/her assignment under this contract that he/she has surrendered or disposed of all classified and/or administratively controlled information in his/her custody in accordance with applicable security instructions.

15. Contractor-Mission Relationships (Dec

1985)

(a) The contractor acknowledges that this contract is an important part of the U.S. Foreign Assistance Program and agrees that his/her duties will be carried out in such a manner as to be fully commensurate with the responsibilities which this entails.

(b) While in the Cooperating Country, the contractor is expected to show respect for the conventions, customs, and institutions of the Cooperating Country and not interfere in its political affairs.

(c) If the contractor's conduct is not in accordance with paragraph (b) of this provision, the contract may be terminated under General Provision 16 of this contract. The Contractor recognizes the right of the U.S. Ambassador to direct his/her immediate removal from any country when, in the discretion of the Ambassador, the interests of the United States so require.

(d) The Mission Director is the chief representative of USAID in the Cooperating Country. In this capacity, he/she is responsible for the total USAID Program in the Cooperating Country including certain administrative responsibilities set forth in this contract and for advising USAID regarding the performance of the work under the contract and its effect on the U.S. Foreign Assistance Program. The contractor will be responsible for performing his/her duties in accordance with the statement of duties called for by the contract. However, he/she shall be under the general policy guidance of the Mission Director, and shall keep the Mission Director or his/her designated representative currently informed of the progress of the work under this contract.

16. Termination (Nov 1989)

(This is an approved deviation to be used in place of the clause specified in FAR 52.24912.)

(a) The Government may terminate performance of work under this contract in whole or, from time to time, in part:

(1) For cause, which may be effected immediately after establishing the facts warranting the termination, by giving written notice and a statement of reasons to the contractor in the event (i) the Contractor commits a breach or violation of any obligations herein contained, (ii) a fraud was committed in obtaining this contract, or (iii) the contractor is guilty (as determined by USAID) of misconduct in the Cooperating Country. Upon such a termination, the contractor's right to compensation shall cease when the period specified in such notice expires or the last day on which the contractor performs services hereunder, whichever is earlier. No costs of any kind incurred by the contractor after the date such notice is delivered shall be reimbursed hereunder except the cost of return transportation (not including travel allowances), if approved by the Contracting Officer. If any costs relating to the period subsequent to such date have been paid by USAID, the contractor shall promptly refund to USAID any such prepayment as directed by the Contracting Officer.

(2) For the convenience of USAID, by giving not less than 15 calendar days advance written notice to the contractor. Upon such a termination, contractor's right to compensation shall cease when the period specified in such notice expires except that the contractor shall be entitled to any unused vacation leave, return transportation costs and travel allowances and transportation of unaccompanied baggage costs at the rate specified in the contract and subject to the limitations which apply to authorized travel status.

(3) For the convenience of USAID, when the contractor is unable to complete performance of his/her services under the contract by reason of sickness or physical or emotional incapacity based upon a certification of such circumstances by a duly qualified doctor of medicine approved by the Mission. The contract shall be deemed terminated upon delivery to the Contractor of a termination notice. Upon such a termination, the contractor shall not be entitled to compensation except to the extent of any unused vacation or sick leave but shall be entitled to return transportation, travel allowances, and unaccompanied baggage costs at rates specified in the contract and subject to the limitations which apply to authorized travel status.

(b) The contractor, with the written consent of the Contracting Officer, may terminate this contract upon at least 15 days' written notice to the Contracting Officer.

17. Release of Information (Dec 1985) All rights in data and reports shall become the property of the U.S. Government. All information gathered under this contract by the Contractor and all reports and recommendations hereunder shall be treated as confidential by the Contractor and shall not, without the prior written approval of the Contracting Officer, be made available to any person, party, or government, other than USAID, except as otherwise expressly provided in this contract.

18. Notices (Dec 1985)

Any notice, given by any of the parties hereunder, shall be sufficient only if in writing and delivered in person or sent by telegraph, telegram, registered, or regular mail as follows:

To USAID: Administrator, U.S. Agency for International Development, Washington, D.C. 20523-0001, Attention: Contracting Offi

cer.

(name of the cognizant Contracting Officer with a copy to the appropriate Mission Director).

To Contractor:

At his/her post of duty while in the Cooperating Country and at the Contractor's address shown on the Cover Page of this contract or to such other address as either of such parties shall designate by notice given as herein required. Notices hereunder shall be effective in accordance with this clause or on the effective date of the notice, whichever is later.

19. Reports (June 1987)

(a) The Contractor shall prepare and submit 2 copies of each technical report required by the schedule of this contract to the Bureau for Program and Policy Coordination, Center for Development Information and Evaluation, Development Information Division (PPC/CDIE/DI). All documents should be mailed to:

PPC/CDIE/DI, Acquisitions, Room 209, SA18, U.S. Agency for International Development, Washington, D.C. 20523-1802.

The title page of all reports forwarded to PPC/CDIE/DI pursuant to this paragraph shall include a descriptive title, the author's name(s), contract number, project number and title, contractor's name, name of the USAID project office, and the publication or insurance date of the report.

(b) When preparing reports, the contractor shall refrain from using elaborate art work, multicolor printing and expensive paper/ binding, unless it is specifically authorized in the Contract Schedule. Wherever possible,

pages should be printed on both sides using single spaced type.

20. Use of Pouch Facilities (July 1993) (a) Use of diplomatic pouch is controlled by the Department of State. The Department of State has authorized the use of pouch facilities for USAID contractors and their employees as a general policy, as detailed in paragraphs (a)(1) through (a)(6) of this provision. However, the final decision regarding use of pouch facilities rests with the Embassy or USAID Mission. In consideration of the use of pouch facilities as hereinafter stated, the Contractor agrees to indemnify and hold harmless the Department of State and USAID for loss or damage occurring in pouch transmission.

(1) Contractors are authorized use of the pouch for transmission and receipt of up to a maximum of 0.90 kilogram/2 pounds per shipment of correspondence and documents needed in the administration of foreign assistance programs.

(2) U.S. citizen contractors are authorized use of the pouch for personal mail up to a maximum of 0.45 kilogram/one pound per shipment (but see (a)(3) below). Non-U.S. citizen Contractors are not permitted use of the pouch for personal mail except to the extent that such use may be authorized by the Chief of Mission.

(3) Merchandise, parcels, magazines, or newspapers are not considered to be personal mail for purpose of this clause, and are not authorized to be sent or received by pouch.

(4) Official and personal mail under paragraphs (a) (1) and (2) of this provision, sent by pouch, should be addressed as follows: Individual's Name (C), U.S. Agency for International Development, Washington, D.C. 20523-0001.

(5) Mail sent via the diplomatic pouch may not be in violation of U.S. Postal laws and may not contain material ineligible for pouch transmission.

(6) Use of military postal facilities (APO/ FPO) is authorized to U.S. contractors on the same basis as approved for direct-hire employees at the USAID Mission. Posts having access to APO/FPO facilities and using such for diplomatic pouch dispatch, may, however, accept official and personal mail for the pouch provided, of course, adequate postage is affixed when onward transmission (mail to other than USAID/W) through U.S. postal channels is required.

(b) The contractor shall be responsible for compliance with these guidelines and limitations on use of pouch facilities.

(c) Specific additional guidance on use of pouch facilities in accordance with this clause is available from the Post Communication Center at the Embassy or USAID Mission.

21. Biographical Data (June 1990)

(a) The contractor agrees to furnish biographical information to the Contracting Officer on forms (SF 171 and 171As) provided for that purpose.

(b) Emergency locator information. The contractor agrees to provide the following information to the Mission Administrative Officer on arrival in the host country regarding himself/herself and dependents:

(1) Contractor's full name, home address, and telephone number including any afterhours emergency number(s).

(2) The name and number of the contract, and whether the individual is the contractor or the contractor's dependent.

(3) The name, address, and home and office telephone number(s) of each individual's next of kin.

(4) Any special instructions pertaining to emergency situations such as power of attorney designees or alternate contact persons.

22. U.S. Resident Hire Personal Services
Contractor (June 1990)

A contractor meeting the definition of a U.S. Resident Hire PSC contained in Section 12, General Provisions, Clause 1, Definitions, shall be subject to U.S. Federal Income Tax, but shall not be eligible for any fringe benefits (except contributions for FICA, health insurance and life insurance), allowances, or differentials, including but not limited to travel and transportation, medical, orientation, home leave, etc., unless such individual can demonstrate to the satisfaction of the Contracting Officer that he/she has received similar benefits/allowances from their immediately previous employer in the Cooperating Country, or the Mission Director determines that payment of such benefits would be consistent with the Mission's policy and practice and would be in the best interest of the U.S. Government.

23. Orientation and Language Training (July

1993)

(a) Except as set forth in paragraph (b)(4) below, the Contractor shall receive a maximum of 2 weeks USAID orientation before travel overseas. The dates of orientation shall be selected by the Contractor and approved by the Contracting Officer from the orientation schedule provided by USAID.

(b) As either set forth in the Contract Schedule, or provided in writing by the Contracting Officer, the following may be authorized taking into consideration specific job requirements, contractor's prior overseas experience, or unusual circumstances, in connection with orientation of individual Contractors:

(1) Modified orientation,

(2) Language training,

(3) Orientation for Contractor's dependents at contract expense.

(4) Waiver of orientation for individual contractor.

(c) Transportation costs and travel allowances not to exceed one round trip from the Contractor's residence to place of orientation and return will be reimbursed, pursuant to Clause 10 of the General Provisions, entitled "Travel and Transportation Expenses," if the orientation is more than 80 kilometers/ 50 miles from the contractor's residence. Allowable salary costs during the period of orientation are also reimbursable.

24. Conditions for Contracting Prior to Receipt of Security Clearance (July 1993) (a) U.S. Resident Hire PSC. The contractor may commence work prior to the completion of the security clearance. However, until such time as clearance is received, the contractor shall have no access to classified or administratively controlled materials. Further, failure to obtain clearance will constitute cause for contract termination in accordance with paragraph (a)(2) of General Provision 16 of this contract.

(b) U.S. PSC-Non-Resident Hire. The contractor may elect to commence travel to post immediately to begin work prior to completion of the security clearance. However, until such time as security clearance is received, the contractor shall:

(1) Have no access to classified or administratively controlled materials;

(2) Be authorized to travel to post himself/ herself only; and

(3) Be authorized no entitlements other than those normally authorized for short term (less than a year) employees at post. Even if the contract is for one year or more, dependents may not accompany contractor unless at his/her expense, and transportation/storage of household/personal effects and motor vehicle will not be financed by USAID prior to the receipt of the security clearance. Upon receipt of clearance, the Contracting Officer will authorize reimbursement of any such costs borne at contractor's expense prior to clearance provided they are reasonable, allocable and allowable. If appropriate given the length of time remaining, the Contracting Officer will authorize dependent travel and shipment/storage of motor vehicle and effects. Allowances which would not be provided to short term employees will be authorized after clearance is received provided that the contractor is otherwise entitled to such benefits. Failure to obtain the security clearance will constitute cause for contract termination in accordance with paragraph (a)(2) of General Provision 16 of this contract.

[blocks in formation]

and his/her authorized dependents while performing personal services abroad. Coverage shall be obtained pursuant to the terms of the contract between USAID and USAID's medevac service provider unless exempted in accordance with paragraph (b).

(b) The following are exempted from the requirements in paragraph (a):

(1) Contractors and their dependents with a health insurance program that includes sufficient medevac coverage as approved by the Contracting Officer.

(2) Contractors and their dependents located at Missions where the Mission Director makes a written determination to waive the requirement for such coverage based on findings that the quality of local medical services or other circumstances obviate the need for such coverage.

(c) Information on the current medevac service provider, including application procedures, is available from the Contracting Offi

cer.

26. Governing Law (Nov 1996)

This contract is established under the procurement authorities of the United States Government and shall be interpreted in accordance with the body of Federal Procurement Law in the United States. This contract is a complete statement of the duties, compensation, benefits, leave, notice, termination, and the like; therefore, the laws of the country of performance with respect to labor and contract matters shall not apply to either the carrying out of the obligations of the parties or to the interpretation of this agreement.

13. FAR Clauses to be Incorporated in Full Text in Personal Services Contracts.

The following FAR Clauses are always to be used along with the General Provisions. They are required in full text.

1. Covenant Against Contingent Fees 52.203

2. Electronic Funds Transfer Payment Methods 52.232-28

3. Disputes 52.233-1 (Alternate 1)

4. Preference for U.S. Flag Air Carriers 52.247-63

14. FAR Clauses to be Incorporated by Reference in Personal Services Contracts

The following FAR Clauses are to be used along with the General Provisions, and when appropriate, be incorporated in each personal services contract by reference:

1. Anti-Kickback Procedures 52.203-7

2. Limitation on Payments to Influence Certain Federal Transactions 52.203-12

3. Audit and Records-Negotiation 52.215-2 4. Privacy Act Notification 52.224-1

5. Privacy Act 52.224-2

6. Taxes-Foreign Cost Reimbursement Contracts 52.229-8

7. Interest 52.232-17

8. Limitation of Cost 52.232-20

[blocks in formation]

The collaborative assistance approach represents an alternative method for long-term technical assistance which involves professional collaboration with eligible Title XII institutions and LDC counterparts for a problem-solving type activity to develop new institutional forms and capabilities, to devise operating systems and policies, and to conduct joint research and development-including training. In such an activity, the difficulty in defining, in advance, precise and objectively verifiable contractor inputs and long-term project content as a basis for payment usually requires a flexible approach to project design, contracting, and project implementation. Such flexibility is also essential to the collaborative style which is responsive to LDC desires in problem areas of great complexity and varying uncertainty. Other types of technical assistance, which are usually shorter in term are amenable to

more precise definition in advance, or involve closely defined and relatively standardized services, or are otherwise more analogous to commodity resource transfers, may be suitable for other contracting methods, e.g., certain forms of institution building, on-the-job training, resource surveys, etc. The collaborative assistance method is an approved method for providing technical assistance when used in accordance with the circumstances outlined above, and with the guidelines set forth in paragraph 4, below.

4. Implementation Procedures

(a) Introduction. This paragraph 4, provides background information, guidelines and procedures to effect the implementation of the policy set forth in paragraph 3 of this appendix.

(b) Conditions and practices. In order for this policy to work effectively even when the proposed activity fits the criteria described under Policy, there must also be:

con

(1) Acceptance of the notion that the host country, in consultation with the tractor, is in the best position to make tactical, day-to-day decisions on project inputs within agreed-upon limitations and output expectations;

(2) Sufficient trust and respect between the Agency and the contractor to allow this flexible implementation authority;

(3) A direct-hire project monitor with appropriate background to be knowledgeable of progress and to assist in an advisory and facilitative capacity, both during and between periodic reviews. In addition, the following important conditions must be met:

(i) Adequate preproject communication between, and identification of assistance required by, the host government and USAID; (ii) Full joint planning and improved project design ("Joint" as used herein refers to the primary parties, i.e., the collaborating institutions, as well as the host government and USAID. In some instances, it can also include other donors.);

(iii) Careful contractor selection, i.e., matching of the contractor's technical and managerial capabilities to the anticipated requirements of the overseas activity;

(iv) Establishment of relationships between host country, USAID and contractor staff to include host country leadership, flexible implementation authority, and effective management by the contractor;

(v) Improved joint project evaluation, feedback, and replanning; and

(vi) Simplified administrative procedures and greater reliance on in-country logistical support.

(c) Project Stages and Contractor Involvement. In the long-term technical assistance projects as described above, there are four discrete but sometimes overlapping decision stages which take place-with the principal contractor usually involved in the last three.

(1) Problem analysis and project identification. After the host government has indicated a desire for U.S. collaboration on a particular problem and the USAID field mission has determined that the proposed activity is consistent with its program goals and priorities, considerable effort is usually necessary to refine further the project purpose and type of assistance required and provide a basis for contractor selection. This is a crucial step and is focused on results sought-on what the prospective contractor is expected to produce in relation to resources to be used and to project purpose. It should result in a clear understanding of what the LDC wants, and an overall plan which includes agreement on specific objectives or outputs, acceptable types of activities and inputs and an initial budget-resulting in project documentation. At this step, USAID makes decisions it cannot delegate on what it will support and at what cost. If needed to supplement its direct-hire expertise, USAID can use outside consultants for analysis and advice but retains the ultimate decision for itself in collaboration with, but independent of, the requesting host government. (Normally, the proposed contractor for project definition and subsequent implementation should not have been involved in the problem analysis and project identification stage as a consultant to either the host country government, host institution, or USAID. If a potential contractor has been so involved, particular care must be taken to prevent actual or apparent organizational conflicts of interest in the procurement that follows. This could require at a minimum, a careful assessment and complete documentation of reasons for selection.)

Normally, there will need to be some mutual interaction between the overall planning stage outlined here and the detailed planning and design work which follows in the next phase. There will usually be some overlap, with preliminary decisions in this stage providing a basis for selection of implementing agents for stage (2) which in turn proceeds through some preliminary planning to guide completion of stage (1) as a basis for long-term contracting.

(2) Project definition. At this stage, having selected the implementing agent, the U.S. and LDC organizations which will be collaborating in carrying out the project are encouraged to work out, to their mutual

satisfaction, the particulars of what to do and how to do it (i.e., detailed project design) within the context of LDC leadership and responsibility and the general agreements and budget reached in stage (1). The emphasis here is on the technical approach to be utilized and the scheduling and management of project inputs. This may involve a shortterm reconnaissance and/or an extensive period of detailed joint planning and feeling out of what is feasible during a preliminary

« PreviousContinue »