Page images
PDF
EPUB
[blocks in formation]

12-7.404-5 Changes.

Insert the clause set forth in FPR 17.404-5. In the clause, the period of “thirty (30) days" within which any claim for adjustment must be asserted may be varied in accordance with Administration procedures.

8 12–7.403-54 Labor surplus area subcon.

tracting program. Insert the clause set forth in FPR 11.1310-2(b) under the conditions prescribed therein. § 12–7.403–55 Minority business enter.

prises subcontracting program. Insert the clause set forth in FPR 11.1310-2(b) under these contitions prescribed therein. 812-7.403-58 Preference for U.S. flag air

carriers. Insert the clause set forth in FPR 1.1.323-2 under the conditions prescribed therein.

$12-7.404–6 Key personnel.

Insert the clause set forth in FPR 17.304-6.

§ 12–7.404–7 Disposition of material.

Insert the clause set forth in FPR 17.304-8.

$12–7.404–8 Reports of work.

Insert the clause set forth in FPR 17.304-9.

[blocks in formation]

§ 12–7.450-3 Priorities, allocations, and al- § 12–7.451–5 Military security requirelotments.

ments. Insert the clause set forth in When required by DOTPR 12-1.352. DOTPR 12-7.150-3.

insert the clause set forth in DOTPR

12-7.151-9 and modifications thereto $ 12–7.450–4 Interpretation or modifica. set forth in DOTPR 12–7.251-7.

tion. Insert the clause set forth in 8 12-7.451-6 Stop work orders. DOTPR 12-7.150-4.

The clause set forth in DOTPR 12

7.151-12 may be included under the 812-7.450-5 Dissemination of contract in

conditions described therein, provided formation.

the clause is modified as prescribed in Insert the clause set forth in DOTPR 12-7.251-8. DOTPR 12-7.150-10.

8 12-7.451-7 Value engineering. 8 12-7.450–6 Authorization and consent.

A value engineering incentive clause Insert the clause set forth in substantially as set forth in DOTPR DOTPR 12-7.150-11 in accordance 12-7.151-13, substituting the “Sharwith DOTPR 12-9.151-1.

ing" paragraph (e) in DOTPR 12

7.251-9 (b) or (c) for paragraph (e) of § 12–7.450-7 Notice of delays.

the clause in DOTPR 12-7.151-13, as Insert the clause set forth in applicable, shall be included in the DOTPR 12-7.150-9.

contract in accordance with instruc

tions for its use in DOTPR 12-1.52028 12-7.450-8 Rights in data.

Insert the clause set forth in DOTPR 12-7.151-5 or DOTPR 12 8 12-7.451-8 Renegotiation. 7.151-6 in accordance with instructions

Insert the clause set forth in in DOTPR 12-9.201-1.

DOTPR 12-7.151-15 in accordance 8 12-7.451 DOTPR clauses to be used

with instructions contained therein. when applicable.

8 12-7.451-9 Background patents (license). The following DOTPR clauses shall

Insert the clause set forth in be included in the contract when their DOTPR 12-7.150-12 in accordance use is appropriate.

with instructions contained in DOTPR 12–7.451-1 Recovery of developmental

12-9.150. costs.

Subpart 12-7.6—Clauses for FixedInsert the clause set forth in DOTPR 12-7.151-7 in accordance with

Price Construction Contracts conditions contained in DOTPR 129.702.

8 12-7.600 Scope of subpart.

This subpart sets forth or cites con8 12–7.451-2 Filing of patent applications. tract clauses and notices for solicita

Insert the clause set forth in tions for use in fixed-price construcDOTPR 12-7.151-2 in accordance with tion contracts. instructions in DOTPR 12-9.154.

8 12–7.601 General. 8 12–7.451-3 Reporting of royalties (for The clauses and notices prescribed eign).

in FPR Subpart 1-7.6 shall be used in Insert the clause set forth in accordance with instructions set forth DOTPR 12-7.151-3 in accordance with in FPR 1-7.601. instructions in DOTPR 12-9.156.

8 12-7.602 Required clauses. 8 12–7.451-4 Refund of royalties.

Subject to the exceptions in FPR 1Insert the clause set forth in 7.601, the following clauses shall be inDOTPR 12-7.151-4 in accordance with serted in all advertised and negotiated instructions in DOTPR 12-9.157.

fixed-price construction contracts. For

[blocks in formation]
[blocks in formation]

§ 12–7.603-21 Subcontractor cost and pric

ing data. Insert the appropriate clause set forth in FPR 1-3.814-3 under the conditions described therein.

[blocks in formation]

8 12-7.603-22 Contracts with the Small

Business Administration (Special 8 (a)

Contract). (a) Insert the clause set forth in FPR 1-1.713-4(g)(1) in contracts with the Small Business Administration awarded pursuant to section 8(a) of the Small Business Act (15 U.S.C. 637(a)).

(b) Insert the clause set forth in FPR 1-1.713-4(h) in subcontracts which will be executed by the Small Business Administration with its subcontractors.

8 12-7.603-23 Small business subcontract

ing program. Insert the clause set forth in FPR 11.710-3(b) under the conditions described therein.

8 12-7.603-24 Minority business enter

prises subcontracting program. Insert the clause set forth in FPR 11.1310-2(b) under the conditions described therein. 812-7.603-25 Late bids and modifications

or withdrawals. Insert the provisions cited in FPR 17.603-25 in solicitations under the conditions precribed therein.

8 12–7.650-2 Protection of existing vegeta

tion, structures, utilities, and improvements. Use with standard Form 19 or 23A.

PROTECTION OF EXISTING VEGETATION, STRUCTURES, UTILITIES, AND IMPROVEMENTS

(a) The Contractor will preserve and protect all existing vegetation (such as trees, shrubs, and grass) on or adjacent to the site of work which is not to be removed and which does not unreasonably interfere with the construction work. Care will be taken in removing trees authorized for removal to avoid damage to vegetation to remain in place. Any limbs or branches of trees broken during such operations or by the careless operation of equipment or by workmen, shall be trimmed with a clean cut and painted with an approved tree pruning compound, as directed by the Contracting Officer.

(b) All existing utilities, communications facilities, and other improvements, including but not limited to conduit, pipe, wiring, or cable (hereinafter referred to as “improvements"), whether above or below ground, shall be protected by the Contractor from damage or destruction. The Contractor shall ascertain from the drawings and specifications the location of any concealed improvements at or near the site of the work. Any destruction of or damage to existing improvements, above or below ground, shall be promptly repaired, restored, or replaced at the direction of the Contracting Officer. The directions of the Contracting Officer may require complete replacement of conduits, pipes, wiring, cables, or similar improvements where original installation was made under a requirement for continuous, unspliced lengths. The Contracting Officer has the right to have the necessary corrective work performed by the Contractor at his expense, or by others and charge the cost thereof to the Contractor. If concealed improvements are encountered and they are not shown on the drawings or specifications, the provisions of the

812-7.603-26 Preference for U.S. flag air

carriers. Insert the clause set forth in FPR 11.323-2 under the conditions described therein.

8 12-7.603-27 Cost accounting standards.

Insert the notices for solicitations set forth in FPR 1-3.1203(a)(3), (h)(2), and (i)(2) and the clauses set forth in FPR 1-3.1204-1 and FPR 1-3.1204-2 under the conditions contained in FPR Subpart 1-3.12.

8 12-7.603-28 Subcontracts.

Insert the clause set forth in FPR 17.103-28 under the conditions contained in the section.

« PreviousContinue »