Page images
PDF
EPUB

ANALYSIS OF OMB RESERVE-Continued

(Dollar amounts in thousands)

Amount Date placed reserved in reserve

Re- Released from reserve Reserve serve

- at close of code Date

Amount fiscal year

[merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

Plant and capital equipment-Continued

66-5-e-Alternating gradient synchro

tron conversion, Brookhaven National

Laboratory, New York.... 66-5-h-Meson physics facility. Los

Almos Scientific Laboratory, New

Mexico.... 66-6-6-Land acquisition, Brookhaven

National Laboratory, New York.. 66-6-d-Electron linear ac celerator

facility. Massachusetts Institute of

Technology, Massachusetts........... 65-5-a-Argonne advanced research

reactor, Argonne National Laboratory,

Illinois.... 64-8-4-Tandem Van de Graaff facility,

Brookhaven National Laboratory,

New York.... 60-8-3-Transuranium processing plant,

Oak Ridge National Laboratory,

Tennessee... 59 -15 Research reactor, Ames Labo

ratory.... 67-5-a-Biology laboratory, Pacific

Northwest Laboratory, Richland, Wash. 63-CDP-Community disposal projects... 678_Construction planning and design. 66-10-Construction planning and design.

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small]

64-AE-Construction planning and design............................. Total.......... ...........

FISCAL YEAR 1969

[merged small][merged small][merged small][ocr errors][merged small]
[merged small][ocr errors][merged small][merged small][merged small][subsumed][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

ANALYSIS OF OMB RESERVE-Continued

(Dollar amounts in thousands)

Amount Date placed reserved in reserve

Re- Released from reserve Reserve serve

- at close of code Date

Amount fiscal year

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Plant and capital equipment - Continued

68-3-6-Modifications to reactors.... $900 Sept. 11, 1968 67-3-2-Fast flux test facility.-..

0 .....do.l.... 67-3-6-Modifications and additions to · reactor facilities, West Milton, N.Y.... 500 .....do....... 67-3-6- Research and development test

plants, Project Rover, Los Alamos
Scientific Laboratory and Nevada Test
Site.-----

1 ...do.l...... 66-4-a-Sodium pump test facility

5,300 .....do.'..--65-4-6-Power burst facility. National Reactor Testing Station, Idaho..

2,400 .....do........ 64-e-7_ Thorium-uranium fuel cycle

development facility, Oak Ridge

National Laboratory, Tennessee..... 680 .....do........ 61-0-5-Fast reactor core test installa

tion, Los Alamos Scientific Laboratory,
New Mexico...--

1,711 .....do.......
58-111-Cooperative power reactor
demonstration program....

1,177 .....do... 57-XXX-Nuclear powered merchant ship. 1,358 .....do...

Reserve for project overruns.... 2,209 .....do....... 68-4-4-Laboratory and energy storage

facility, Los Alamos Scientific Labora-
tory, New Mexico...

3, 150 .....do........ 66-5-e-Alternating gradient synchro

tron conversion, Brookhaven National
Laboratory, N.Y......

12,575 .....do.l...... 66-6-6-Land acquisition, Brookhaven National Laboratory, New York.....

.....do........ 64-9-4-Tandem Van de Graaff facility,

Brookhaven National Laboratory, New
York.... ce-----

250 .....do.!...... 60-8—3—Transuranium processing plant,

Oak Ridge National Laboratory, Ten-
nessee...

222 67-8--Construction planning and design. 1, 725 do..... 66-10-Construction planning and design..............................

1,450 Sept. 11, 19681 65-10_Construction planning and design..............

.'. 592 .....do........ 64-4-4-Nuclear safety engineering test

facility, National Reactor Testing Sta-
tion, idaho.....

S..... 9,077 .....do....... 66-5-h-Meson physics facility, Los Alamos Scientific Laboratory, New Mexico. 26, 202 ....do........ Total...----

119,855 .......... FISCAL YEAR 1970

[blocks in formation]

01

1,723 ...do.....

[merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors]
[blocks in formation]
[ocr errors][merged small][merged small]

920 .....do....... 938 .....do.......

---

[ocr errors]

310

70-2-a-Rebuilding of gaseous diffusion

plant cooling tower, Portsmouth, Ohio. 70-8-General plant projects-special

nuclear materials............. 69-2-0-Calcined solids storage facility

additions, National Reactor Testing

Station, Idaho...... 70-3-4Weapons production, develop

ment, and test installations......... 70-8-General plant projects—weapons.. 69-3-6-Weapons production, develop

ment, and test installations....

[merged small][ocr errors][merged small][merged small][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][ocr errors]

69-261—Restoration of prod. fac., R.F... 69-6-General plant projects-weapons..

5,000 --...do......

651 .....do.l...

More 23; 1970 1 May 13:19

5,000

5.000

[ocr errors][ocr errors]
[ocr errors]

June 25, 1970

See footnote at end of table.

[merged small][merged small][merged small][ocr errors]
[blocks in formation]

Plant and capital equipment-Continued

68-2-6-Weapons production, develop

ment and test installations... 67-2-6---Weapons production, develop

ment and test installations... 70-4-4 High temperature sodium facil

ity. Pacific Northwest Laboratory,

Richland, Wash..... 70-4-5-Résearch and development test

plants, Project Rover, Los Alamos Scientific Laboratory, New Mexico,

and Nevada Test Site, Nevada...... 70-4 d-Modifications to reactors...... 70-8-General plant projects-reactor

development......

[merged small][merged small][merged small][ocr errors][ocr errors][ocr errors][merged small][ocr errors][merged small]

development.......................

1 May 12, 1970

1970 June 25, 1970

[ocr errors]
[blocks in formation]
[merged small][ocr errors][merged small][merged small][merged small]

1,048 .....do........ 1,823 .....do...

500 .....do... 48,200....do...

250 .....do.......

[blocks in formation]
[blocks in formation]

68-3-a-Research and development test

plants, Project Rover, Los Alamos Scientific Laboratory, New Mexico,

and Nevada Test Site, Nevada..... 68-3-6-Isotopic space systems facil

Sandia Base, New Mexico...... 68-3-0-Modifications to reactors...... 67-3-2--East flux test facility.67-3--Modifications and additions to

reactor facilities, West Milton, N.Y..... 67-3-0-Research and development test

plants, Project Rover, Los Alamos Scientific Laboratory. New Mexico. and Nevada Test Site, Nevada-(1) NRDS water distribution system

addition --67-3-1-Modifications to reactors-(3)

ZPR, VI, and IX modifications, ANL.. 67-6-4-Alpha fuels environmental test

facility, Mound Laboratory, Miamis

burg, Ohio.............. .. . 66 4-4--Sodium pump test facility.... 66 4-6-Modifications to reactors (2)

ZPR, VI, and IX modifications, ANL. 65-4-6-Power burst facility. National

Reactor Testing Station, Idaho........ 64-e-4-Nuclear safety engineering

test facilities, National Reactor

Testing Station, Idaho..... 64-e-7-Thorium-uranium fuel cycle

development facility. Oak Ridge

National Laboratory, Tennessee.... . 61-0-5-Fast reactor core test installa

tion, Los Alamos Scientific Labora.

tory, New Manowar reactor dem. 70-110 Cooperative power reactor dem

onstration program-La Crosse boiling

water reactor... 68-111-Cooperative power reactor dem

onstration program-Elk River...... 57-XXX-Nuclear powered merchant ship.

Reserve tor project overruns.... 70-6-e-Accelerator improvements, Stan

ford Linear Accelerator Center, Califor

[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

nia.........

[blocks in formation]

70-8--General plant projects--research.. 68-4-8--Laboratory and energy storage

facility, Los Alamos Scientific Labora

tory, New Mexico..... 66-5-4-Alternating gradient synchro

tron conversion, Brookhaven National

Laboratory, New York..... 66-5-h-Meson physics facility, Los

Alamos Scientific Laboratory, New

Mexico....
See footnote at end of table,

[merged small][merged small][ocr errors][merged small][merged small][merged small]
[ocr errors][merged small]

ANALYSIS OF OMB RESERVE—Continued

{Dollar amounts in thousands)

Amount Date placed reserved in reserve

Re- Released from reserve serve code Date

Amount

Reserve at close of fiscal year

[merged small][ocr errors][ocr errors][merged small][merged small][merged small]

Plant and capital equipment-Continued

70-8-General plant projects-biology

and medicine... 68-6--General plant projects-biology

and medicine..... 67-5-2-Biology laboratory, Pacific

Northwest laboratory, Richland, Wash.. 70-8-General plant projects-adminis

trative............................. 67-8-Construction planning and des gn.. 66-10-Construction planning and design. 65-10-Construction planning and design.

Pollution abatement projects.
Subtotal.

---
FISCAL YEAR 1971

[merged small][ocr errors][merged small][ocr errors][ocr errors][ocr errors][ocr errors][merged small][ocr errors]

-----

123,625

[ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]
[blocks in formation]

Operating expenses:
Reactor development:
Naval reactors-costs...

..
Naval reactors-GSO..
LMFBR project definition phase

costs...
LMFBR-GSO.....

LMFBR-costs...
Isolopes development:

Artificial heart engine develop

ment-costs..
Artificial heart engine develop

ment-GSO.....
Radiation preservation of foods-

costs......
Regulation.

Total (as of Mar. 10, 1971)........... Plant and Capital equipment:

71-1-e-Gaseous diffusion production

Support facilities (AE only)... 71-1-1- Process equipment modifica

tions, gaseous diffusion plants........ 70-2-a-Rebuilding of gaseous diffusion

plant cooling tower, Portsmouth, Ohio. 71-2-a-Weapons production, develop

ment, and test installations.... 70-3-a-Weapons production, develop

ment, and test installations... 69-3-b-Weapons production, develop

ment, and test installations.. 69-261-Restoration of production facil

ity, Rocky Flats....... 68-2-6-Weapons production, develop

ment and test installations.......... 71-3--Modifications to reactors..... 71-3-0-Research and development test

plants, Project Rover, Los Alamos Scientific Laboratory, New Mexico, and

Nevada Test Site, Nevada..... 71-3-C-Modifications to EBR-II and

related facilities, National Reactor

Testing Station, Idaho..... 70-4-b-Research and development test

plants, Project Rover, Los Alamos Scientific Laboratory, New Mexico, and

Nevada Test Site, Nevada...... 70-5--Conversion of heating plant to

natural gas, Argonne National Labora

tory, Illinois........... 68-3-b-Isotopic space systems facility.

Sandia Base, New Mexico....... 67-3-2-Fast flux test facility.. . 66-4--Sodium pump test facility.... 64-e-4-Nuclear safety engineering test

facilities, National Reactor Testing

Station, Idaho........ .
See footnote at end of table.

9,700 Nov. 9, 1970 1 6,400 .....do....... 1,000 .....do.!...... 10,000 .....do.......

55 .....do.!......

15 .....do.!...... 5,000 .....do.?.......

245 .....do....... 2.000....do.'...-.

[blocks in formation]
[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][ocr errors][ocr errors][merged small][merged small]

ANALYSIS OF OBM RESERVE—Continued

(Dollar amounts in thousands)

Amount Date placed reserved in reserve

Released from reserve Reserve serve

at close of code Date

Amount fiscal year

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

Plant and capital equipment-Continued 64-e-1-Thorium-uranium fuel cycle de

velopment facility, Oak Ridge National

Laboratory, Tennessee...... 61-0-5-Fast reactor core test installa

tion, Los Alamos Scientific Laboratory,

New Mexico... 60-110-Cooperative power reactor dem

onstration program-La Crosse boiling

water reactor....... 57-XXX-Nuclear-powered merchant ship.

Reserve for project overruns.... 71-5-a-Addition to physics building

(human radiobilogy facility), Argonne

National Laboratory, Illinois.... 71-6-4-National Nuclear Science In

formation Center (AE only), Oak Ridge,

Tenn...... 67-8-Construction planning and design.. 66-10-Construction planning and design. 65-10-Construction planning and de

sign.

[ocr errors]

.....do....

..do...
....do.l......

[ocr errors]

Ź Dec. 28, 1970

[ocr errors]
[ocr errors]

500 .....do........

[blocks in formation]

600 Nov. 9, 19701 1,025

.....do.....

--...do.. " 279 .....do........ 65, 305 ............

.........
Ź Dec. 28, 1970- 680 ....

........... 279

5,250 60,055

Totals (as of Mar. 10, 1971).........

1 Amount reserved at the time of initial apportionment.

FEBRUARY 18, 1971. MR. CLARK MACGREGOR, Counsel to the President for Legislative and Congressional Affairs, The White House, Washington, D.C.

DEAR CLARK: Thank you for your February 8 letter. I have talked with you briefly about this since then, but I told you I would write to you and so I am doing so now. It is my understanding from your letter and also from previous conversations with members of the Council that the summary which you are presenting in the letter of February 8 was actually compiled after the Presi. dent had announced his decision, and is not the paper which was presented to the President. I would still like to have a copy of the thing that was presented to the President and upon which he based his decision. I think that you can see that this would very much lighten my burden in bringing the issues out concretely and specifically, when you consider the tremendous bulk of material that was summarized in the attachment to your letter, much of which is categorically denied by outstanding ecologists and geologists who have an opposite point of view. I would like to be able to present to the President opposing points of view on many of the things which are involved and not taken issue with in the material which you sent.

With regard to the second point of your letter on legal aspects of the President's action, I enclose herein an extension of my remarks which I have put in the CONGRESSIONAL RECORD recently. I would appreciate very much receiving any legal opinion that you may have accumulated to the contrary.

With regard to the fact that you would like to see me and others to discuss recommendations you mention, you can count on it that I would be glad to attend any meeting that has a relevance to the Canal, but I understand from your letter that this does not have anything to do with whether or not the Canal will be continued but only as to what is planned by people in the Administration for the area of the Canal. It is not quite clear to me how people in the Administration can make decisions of that nature since we are involved with a law which was duly enacted and since undoubtedly lawsuits are going to be prevalent and extensive in this field. I enclose herein a clipping from a newspaper with regard to recent action taken by the Florida Canal Authority,

« PreviousContinue »