most probable for the specific site, including the use of team training for these accident scenarios.

(k) Safe shutdown. A brief description of the means of restoring the plant to a safe condition after an accident.

(1) Exercises. Provisions for conducting quarterly communications checks with offsite response organizations and biennial onsite exercises to test response to simulated emergencies. Quarterly communications checks with offsite response organizations must include the check and update of all necessary telephone numbers. The Corporation shall invite offsite response organizations to participate in the biennial exercises. Participation of offsite response organizations in biennial exercises, although recommended, is not required. Exercises must use accident scenarios postulated as most probable for the specific site and the accident scenarios must not be made known to most exercise participants. The Corporation shall critique each exercise using individuals that do not have direct implementation responsibility for the plan. Critiques of exercises must evaluate the appropriateness of the plan, emergency procedures, facilities, equipment, training of personnel, and overall effectiveness of the response. Deficiencies found by the critiques must be corrected.

(m) Hazardous chemicals. Confirmation that the Corporation has met its responsibilities under the Emergency Planning and Community Right-toKnow Act of 1986, Title III, Public Law 99-499, if applicable to the Corporation's activities at the proposed place of use of the special nuclear material.

(n) Comment from offsite response organizations. The Corporation shall allow the offsite response organizations expected to respond in case of an accident 60 days to comment on the emergency plan before submitting it to NRC with the initial certification application. The Corporation shall provide any comments received within the 60 days to the NRC with the emergency plan.

(0) Changes to emergency plan. The Corporation may make changes to the emergency plan without prior Commission approval if the changes do not decrease the effectiveness of the plan. The Corporation shall furnish these

changes to the NRC in accordance with §76.5 and to affected offsite response organizations within 6 months after the change is made.

$76.93 Quality assurance.

The Corporation shall establish, maintain, and execute a quality assurance program satisfying each of the applicable requirements of ASME NQA-11989, "Quality Assurance Program Requirements for Nuclear Facilities," or satisfying acceptable alternatives to the applicable requirements. The Corporation shall execute the criteria in a graded approach to an extent that is commensurate with the importance to safety.

$76.95 Training.

A training program must be established, implemented, and maintained for individuals relied upon to operate, maintain, or modify the GDPs in a safe manner. The training program shall be based on a systems approach to training that includes the following:

(a) Systematic analysis of the jobs to be performed.

(b) Learning objectives derived from the analysis which describe desired performance after training.

(c) Training design and implementation based on the learning objectives. (d) Evaluation of trainee mastery of the objectives during training.

(e) Evaluation and revision of the training based on the performance of trained personnel in the job setting.

Subpart E-Safeguards and
Security

876.111 Physical security,

material control and accounting, and protection of certain information. Nuclear Regulatory Commission regulations that will be used for certification of the Corporation2 for physical security and material control and accounting are contained in title 10 of the Code of Federal Regulations as described in this subpart. The regulations

2For the purpose of this subpart, the terms "licensee" or "license" used in parts 70, 73, and 74 of this chapter, mean, respectively, the Corporation, or the certificate of compliance or approved compliance plan.

referenced in this subpart contain requirements for physical security and material control and accounting for formula quantities of strategic special nuclear material (Category I), special nuclear material of moderate strategic significance (Category II), and special nuclear material of low strategic significance (Category III), and for protection of Restricted Data, National Security Information, Safeguards Information, and information designated by the U.S. Department of Energy as Unclassified Controlled Nuclear Information.

[62 FR 6671, Feb. 12, 1997]

§76.113 Formula quantities of strategic special nuclear material-Category I.

(a) The requirements for material control and accounting for formula quantities of strategic special nuclear material (Category I) are contained in §§ 70.51, 74.11, 74.13, 74.15, 74.17. 74.51, 74.53, 74.55, 74.57, 74.59, 74.81, and 74.82.

(b) The requirements for physical security for formula quantities of strategic special nuclear material (Category I) are contained in §§ 70.22(h), 73.20, 73.40, 73.45, 73.46, 73.70, and 73.71.

(c) The requirements for the protection of Safeguards Information pertaining to formula quantity of strategic special nuclear material (Category I) are contained in §73.21 of this chapter. Information designated by the U.S. Department of Energy as Unclassified Controlled Nuclear Information must be protected at a level equivalent to that accorded Safeguards Information.

(d) The Corporation may neither transport Category I material offsite nor deliver Category I material to a carrier for transport offsite.

[59 FR 48960, Sept. 23, 1994, as amended at 62 FR 6671, Feb. 12, 1997]

$76.115 Special nuclear material of moderate_strategic significanceCategory II.

(a) The requirements for material control and accounting for special nuclear material of moderate strategic significance (Category II) are contained in §§ 70.51, 70.52, 70.53, 70.54, 70.57, 70.58, 74.11. 74.13, 74.15, 74.17, 74.81, and 74.82 of this chapter.

(b) The requirements for physical security for special nuclear material of moderate strategic significance (Category II) are contained in §§ 73.67, and 73.71 of this chapter.

(c) The Corporation may neither transport Category II material offsite nor deliver Category II material to a carrier for transport offsite.

$76.117 Special nuclear material of low strategic significance-Category III.

(a) The requirements for material control and accounting for special nuclear material of low strategic significance (Category III) are contained in §§ 70.51, 74.11, 74.13, 74.15, 74.17, 74.33, 74.81, and 74.82 of this chapter. However, inventories of uranium outside of the enrichment processing equipment conducted at least every 370 days are deemed to satisfy the requirements of § 70.51(d).

(b) The requirements for physical security for special nuclear material of low strategic significance (Category III) are contained in §§ 73.67, 73.71, and 73.74 of this chapter.

$76.119 Security facility approval and safeguarding of National Security Information and Restricted Data.

The requirements for security facility approval and for safeguarding of classified matter are contained in part 95 of this chapter. For the purpose of this subpart, the term "licensee" or "license" used in part 95 of this chapter means, respectively, the corporation, or the certificate of compliance or approved compliance plan.

Subpart F-Reports and
Inspections

$76.120 Reporting requirements.

(a) Immediate report. The Corporation shall notify the NRC Operations Center3 within 1 hour after discovery of:

(1) A criticality event;

(2) Any loss, other than normal operating loss, of special nuclear material;

3 The commercial telephone number for the NRC Operations Center is (301) 816-5100 or (301) 951-0550, FAX (301) 816-5151.

(3) Any theft or unlawful diversion of special nuclear material which the Corporation is authorized to possess or any incident in which an attempt has been made or is believed to have been made to commit a theft or unlawful diversion of special nuclear material; or (4) An emergency condition that has been declared an alert or site area emergency.

(b) Four-hour report. The Corporation shall notify the NRC Operations Center as soon as possible but not later than 4 hours after discovery of an event that prevents immediate protective actions necessary to avoid releases or exposures to radiation or radioactive materials that could exceed regulatory limits.

(c) Twenty-four hour report. The Corporation shall notify the NRC Operations Center within 24 hours after the discovery of any of the following events involving radioactive material: (1) An unplanned contamination event that:

(i) Requires access to the contaminated area, by workers or the public, to be restricted for more than 24 hours by imposing additional radiological controls or by prohibiting entry into the area;

(ii) Involves a quantity of material greater than five times the lowest annual limit on intake specified in appendix B to §§ 20.1001 through 20.2402 of 10 CFR part 20 for the material; and

(iii) Causes access to the contaminated area to be restricted for any reason other than to allow isotopes with a half-life of less than 24 hours to decay prior to decontamination.

(2) An event in which equipment is disabled or fails to function as designed when:

(i) The equipment is required by a Technical Safety Requirement to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a preestablished safe condition after an accident;

(ii) The equipment is required by a Technical Safety Requirement to be available and operable and either

4 Events may include fires, explosions, radiological releases, etc.

should have been operating or should have operated on demand; and

(iii) No redundant equipment is available and operable to perform the required safety function.

(3) An event that requires unplanned medical treatment at a medical facility of an individual with radioactive contamination on the individual's clothing or body.

(4) A fire or explosion damaging any radioactive material or any device, container, or equipment containing radioactive material when:

(i) The quantity of material involved is greater than five times the lowest annual limit on intake specified in appendix B to §§ 20.1001 through 20.2402 of 10 CFR part 20 for the material; and

(ii) The damage affects the integrity of the radioactive material or its container.

(d) Preparation and submission of reports. Reports made by the Corporation in response to the requirements of this section must be made as follows:

(1) Operations Center reports. The Corporation shall make reports required by paragraphs (a), (b), and (c) of this section by telephone to the NRC Operations Center. To the extent that the information is available at the time of notification, the information provided in these reports must include: (i) The caller's name and call back telephone number;

(ii) A description of the event, including date and time;

(iii) The exact location of the event; (iv) The isotopes, quantities, and chemical and physical form of the material involved;

(v) Any personnel radiation exposure data available; and

(vi) A description of any actions taken in response to the event.

(2) Written report. A report required by paragraph (a), (b) or (c) of this section must be followed by a written report within 30 days of the initial report. Written reports prepared pursuant to other regulations may be submitted to fulfill this requirement if the reports contain all of the necessary information and the appropriate distribution is made. These written reports must be sent to the U.S. Nuclear Regulatory Commission, Document Control Desk, Washington, DC 20555-0001, with

a copy to the NRC Region III Office listed in appendix D of part 20 of this chapter and the Resident Inspector. The reports must include the following information:

(i) A description of the event, including the probable cause and the manufacturer and model number (if applicable) of any equipment that failed or malfunctioned;

(ii) The exact location of the event;

(iii) A description of isotopes, quantities and chemical and physical form of the material involved;

(iv) The date and time of the event; (v) The causes, including the direct cause, the contributing cause, and the root cause;

(vi) Corrective actions taken or planned and the results of any evaluations or assessments;

(vii) The extent of exposure of individuals to radiation or to radioactive materials without identification of individuals by name; and

(viii) Lessons learned from the event.

§76.121 Inspections.

(a) The Corporation shall afford to the Commission opportunity to inspect the premises and plants under the Corporation's control where radioactive material is used, produced, or stored.

(b) The Corporation shall make available to the Commission for inspection records kept pertaining to receipt, possession, use, acquisition, import, export, or transfer of radioactive material.

(c)(1) The Corporation shall provide rent-free office space for the exclusive use of Commission inspection personnel upon request by the Director, Office of Nuclear Material Safety and Safeguards, or the NRC Region III Administrator. Heat, air conditioning, light, electrical outlets, and janitorial services must be furnished by the Corporation. The office must be convenient to and have full access to the plant, and must provide the inspector both visual and acoustic privacy.

(2) The space provided must be adequate to accommodate the NRC resident inspection staff, a part-time secretary, and transient NRC personnel. Space must be generally commensurate with other office facilities at the site. The office space that is provided

must be subject to the approval of the Director, Office of Nuclear Material Safety and Safeguards, or the NRC Region III Office. All furniture, supplies, and communication equipment will be furnished by the Commission.

(3) The Corporation shall afford any NRC resident inspector assigned to that site or other NRC inspectors identified by the Director, Office of Nuclear Material Safety and Safeguards, or the NRC Region III Administrator, as likely to inspect the plant, immediate, unfettered access equivalent to access provided regular plant employees, following proper identification and compliance with applicable access control measures for security, radiological protection, and personal safety.

$76.123 Tests.

The Corporation shall perform, or permit the Commission to perform, any tests the Commission deems appropriate or necessary for administration of the requirements in this part. These tests include tests of:

(a) Radioactive material;

(b) Facilities where radioactive material is utilized, produced or stored; (c) Radiation detection and monitoring instruments; and

(d) Other equipment and devices used in connection with the production, utilization, or storage of radioactive material.

Subpart G-Enforcement

876.131 Violations.

(a) The Commission may obtain an injunction or other court order to prevent a violation of the provisions of: (1) The Atomic Energy Act of 1954, as amended;

(2) Title II of the Energy Reorganization Act of 1974, as amended;

(3) A regulation or order issued pursuant to those Acts.

(b) The Commission may obtain a court order for the payment of a civil penalty imposed under Section 234 of the Atomic Energy Act of 1954, as amended, or under Section 1312(e) of the Atomic Energy Act of 1954, as amended, and Section 206 of the Energy Reorganization Act of 1974, as amended, for violations of:

(1) Sections 53, 57, 62, 63, 81, 82, 101, 103, 104, 107, 109, or 1701 of the Atomic Energy Act of 1954, as amended;

(2) Section 206 of the Energy Reorganization Act;

(3) Any rule, regulation, or order issued pursuant to the sections specified in paragraph (b)(1) of this section;

(4) Any term, condition, or limitation of any certificate of compliance or approved compliance plan issued under the sections specified in paragraph (b)(1) of this section.

[62 FR 6671, Feb. 12, 1997]

$76.133 Criminal penalties.

(a) Section 223 of the Atomic Energy Act of 1954, as amended, provides for criminal sanctions for willful violation of, attempted violation of, or conspiracy to violate, any regulation issued under Section 161b or 161i of the Act. For purposes of Section 223, all the regulations in part 76 are issued under Section 161b or 161i except for the sections listed in paragraph (b) of this section.

(b) The regulations in part 76 that are not issued under Section 161b or 161i for the purposes of Section 223 are as follows: §§ 76.1, 76.2, 76.4, 76.5, 76.6, 76.23, 76.33, 76.35, 76.37, 76.39, 76.41, 76.43, 76.45, 76.53, 76.55, 76.60, 76.62, 76.64, 76.70, 76.72, 76.131, and 76.133.

[blocks in formation]
[blocks in formation]

§81.2 Definitions.

As used in this part:

(a) Act means the Atomic Energy Act of 1954 (68 Stat. 619), including any amendments thereto;

(b) Commission means the Nuclear Regulatory Commission as established by the Act, or its duly authorized designee. The Assistant General Counsel for Patents is the designee of the Commission under this subpart;

(c) NRC invention means an invention covered by a U.S. patent or patent application that is vested in the Government of the United States, as represented by or in the custody of the Commission, or in which the Government of the United States of America, as represented by the Commission, has the right to accord or require the grant of licenses where such invention is designated by the Commission as appropriate for the grant of a nonexclusive or exclusive license; and

(d) To the point of practical application means to manufacture in the case of composition, machine or product, to practice in the case of a process, or to operate in the case of a machine, under such conditions as to establish that the invention is being worked and that its benefits are reasonably accessible to the public.