The FEDERAL REGISTER along with the notice of the proposed prohibition.

(c) Technical capability. (1) In the case of electing and certifying powerplants, OFP will consider "technical capability" on a case-by-case basis in order to make the required finding. In the case of a certifying powerplant, the powerplant should present information to support the certification relevant to the considerations set forth below. OFP will consider the ability of the unit, from the point of fuel intake to physically sustain combustion of a given fuel and to maintain heat transfer.2

(2) OFP considers that a unit "had" the technical capability to use an alternate fuel if the unit was once able to burn that fuel (regardless of whether the unit was expressly designed to burn that fuel or whether it ever actually did burn it), but is no longer able to do so at the present due to temporary or permanent alterations to the unit itself.3

(3) A unit "has" the technical capability to use an alternate fuel if it can burn an alternate fuel, notwithstanding the fact that adjustments must be made to the unit beforehand or that pollution control equipment may be required to meet air quality requirements.1

20FP will not ordinarily consider the nature or absence of appurtenances outside the unit. For example, OFP will examine the furnace configuration and ash removal capability but will not normally consider the need to install pollution control equipment as a measure of technical capability. Furthermore, OFP will not normally conclude that the absence of fuel handling equipment, such as conveyor belts, pulverizers, or unloading facilities, bears on the issue of a unit's "technical capability" to burn an alternate fuel.

3 For example, a unit which at one time burned solid coal but which could no longer do so because its coal firing ports and sluicing channels had been cemented over, would be classified as having "had" the technical capability to use coal. (The question of whether it again "could have" such capability without "substantial physical modification" is a separate and additional question.)

A unit designed to burn natural gas shall be presumed to have the technical capability to burn a synthetic fuel such as medium Btu gas from coal (assuming such gas is available

(d) Substantial physical modification. In the case of electing and certifying powerplants, OFP will make its determination on whether a physical modification to a unit is "substantial" on a case-by-case basis. In the case of certifying powerplants, OFP will consider the factors set forth below for the purpose of concurrence in the certification. OFP will consider physical modifications made to the unit as "substantial" where warranted by the magnitude and complexity of the engineering task or where the modification would impact severely upon operations at the site.5 OFP will not, however, assess physical modification on the basis of cost.

(e) Substantial reduction in rated capacity. In the case of electing and certifying powerplants, OFP will make this determination on the basis of the following factors. A certifying powerplant should present information to support its certification regarding these factors in order for OFP to make its review for concurrence.

(1) OFP regards a unit's derating of 25 percent or more, as a result of converting a unit from oil or gas to an alternate fuel, as substantial.

(2) OFP will presume that a derating of less than 10 percent, as a result of converting a unit from oil or gas to an alternate fuel, is not substantial unless

unless convincing evidence to the contrary is submitted in rebuttal). Also a unit designed to burn oil may, depending upon the chemical characteristics, be a unit that "has" the technical capability to burn liquefied coal. The fact that certain adjustments may be necessary does not render this a "hypothetical" as opposed to a "real" capability. Even an oil fired unit converting from the use of #2 distillate to #6 residual oil may be required to adjust or replace burner nozzles and add soot blowers.

5 Generally, modification of a unit to burn coal or an alternate fuel will be considered insubstantial if significant alterations to the boiler, such as a change to the furnace configuration or a complete respacing of the tubes, are not required. Minor alterations such as replacement of burners or additions of soot blowers, and additions or alterations outside the boiler, shall not cause the modification to be substantial.

convincing evidence to the contrary is submitted in rebuttal. 6

(3) OFP will assess units for which a derating is claimed of 10 percent or more, but less than 25 percent, on a case-by-case.

re

(4) In assessing whether a unit's derating is not substantial, OFP will consider the impact of a reduction in rated capacity of the unit taking into consideration all necessary appurtenances such as air pollution control equipment required to burn an alternate fuel in compliance with environmental quirements expected to be applicable at the date the prohibitions contained in the final prohibition order become effective. However, the potential order recipient may raise in rebuttal the impact of derating on the site at which the unit is located and on the system as well as on the unit itself, if under paragraph (e)(2), or case-by-case, if under paragraph (e)(3) of this section.

(f) Financial feasibility. In the case of certifying and electing powerplants, OFP will make this finding based on the following considerations. A certifying powerplant should present information to support its certification relevant to these considerations in order for OFP to make its review for concurrence. Conversion of a unit to burn coal or an alternate fuel shall be deemed financially feasible if the firm has the actual ability to obtain sufficient capital to finance the conversion, including all necessary land, coal and ash handling equipment, pollution control equipment, and all other necessary expenditures, without violating legal restrictions on its ability to raise debt or equity capital, unreasonably diluting shareholder equity, or unreasonably adversely affecting its credit rating. OFP will consider any economic or financial factors presented by the proposed order recipient in determining

6 For example, units that are the subject of a prohibition order will not have installed any operating air pollution control equipment sufficient to burn coal in compliance with applicable environmental equipments. The installation and use of air pollution control equipment alone can, in many cases, produce a derating. Moreover, the shift to coal itself will, because of differences in energy density and fuel flow characteristics, typically involve some derating.

the firm's ability or inability to finance the conversion including, but not limited to, the following:

(1) The required coverage ratios on the firm's debt and preferred stock; (2) The firm's investment program; and

(3) The financial impact of the conversion, including other conversions which are or may be undertaken voluntarily by the proposed order recipient or imposed upon the recipient's system by the Act, and including pending or planned construction or reconstruction of alternate-fuel-fired plants and plants exempt from FUA prohibitions. Where helpful in clarifying the longterm financial feasibility of a conversion, DOE may analyze the economic benefits anticipated from operation of the converted unit or units using coal or other alternate fuel relative to those from continued operation using petroleum or natural gas.

(Approved by the Office of Management and Budget under control number 1903-0077) (Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and 15 U.S.C. 719 et seq.; Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981 (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[45 FR 53692, Aug. 12, 1980, as amended at 47 FR 17044, Apr. 21, 1982; 47 FR 50849, Nov. 10, 1982]

§ 504.7 Prohibition against excessive use of petroleum or natural gas in mixtures-electing powerplants.

(a) In the case of electing powerplants, if OFP finds that it is technically and financially feasible for a unit to use a mixture of petroleum or natural gas and an alternate fuel as its primary energy source, OFP may prohibit, by order, the use in that unit of

70FP will not require the proposed order recipient to cancel or defer construction or reconstruction of any alternate-fuel-fired facility, or any facility exempt from the prohibitions of the Act, for which a decision to finance such facility has been made by the appropriate company official before the publication of the prohibition order. The proposed order recipient may choose to cancel or defer any such facility.

petroleum or natural gas, or both, in amounts exceeding the minimum amount necessary to maintain reliability of operation consistent with maintaining reasonable fuel efficiency of the mixture.

(b) In making the technical feasibility finding required by former section 301 (b) and (c) of the Act and paragraph (a) of this section, OFP may weigh "physical modification" or "derating of the unit," but these considerations, by themselves, will not control the technical feasibility finding. A technical feasibility finding might be made notwithstanding the need for substantial physical modification. The economic consequences of a substantial physical modification are taken into account in determining financial feasibility.

(Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and 15 U.S.C. 719 et seq.; Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981 (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[47 FR 17045, Apr. 21, 1982, and 47 FR 50850, Nov. 10, 1982]

$504.8 Prohibitions against excessive

use of petroleum or natural gas in mixtures certifying powerplants.

(a) In the case of certifying powerplants, OFP may prohibit the use of petroleum or natural gas in such powerplant in amounts exceeding the minimum amount necessary to maintain reliability of operation consistent with maintaining the reasonable fuel efficiency of the mixture. This authority is contained in section 301(c) of the Act, as amended. The owner or operator of the powerplant may certify at any time to OFP that it is technically capable and financially feasible for the unit to use a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source. In assessing whether the unit is technically capable of using a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source, for purposes of this section, the extent of any physical modification necessary to convert the unit

and any concomitant reduction in rated capacity are not relevant factors. So long as a unit as proposed to be modified would be technically capable of using the mixture as a primary energy source under $504.6(c), this certification requirement shall be deemed met. The criteria for certification of financial feasibility are found at § 504.6(f). In addition, the powerplant's owner or operator must submit a prohibition compliance schedule, which meets the requirements of § 504.5(d).

(b) If OFP concurs with the certification, a prohibition order against the unit's excessive use of petroleum or natural gas in the mixture will be issued following the procedure outlined in §501.52 of these regulations.

(c) The petitioner may seek to amend its certification in order to take into account changes in relevant facts and circumstances by following the procedure contained in §501.52(d).

NOTE: The authority of OFP implemented under this section should not be confused with the other two fuel mixture provisions of these regulations. One is the general requirement that petitioners for permanent exemptions demonstrate that the use of a mixture of natural gas or petroleum and an alternate fuel is not economically or technically feasible (See $504.15). The second is the permanent fuel mixtures exemption itself (See §504.56).

(Approved by the Office of Management and Budget under control number 1903-0077) (Department of Energy Organization Act, Pub. L. 95-91 (42 U.S.C. 7101 et seq.); Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and Pub. L. 95-620 (15 U.S.C. 719 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, as amended by Pub. L. 97-35 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35)

[47 FR 17045, Apr. 21, 1982]

[blocks in formation]

these regulations, OFP may prohibit the excessive use of natural gas or petroleum in a mixture with an alternate fuel as a primary energy source in a certifying powerplant.

(a) NEPA compliance. Except as provided in paragraph (c) of this section, where the owner or operator of a powerplant seeks to obtain an OFP prohibition order through the certification procedure, and did not hold either a proposed prohibition order under former section 301 of FUA or pending order under section 2 of ESECA, it will be responsible for the costs of preparing any necessary Environmental Assessment (EA) or Environmental Impact Statement (EIS) arising from OFP's obligation to comply with NEPA. The powerplant owner or operator shall enter into a contract with an independent party selected by OFP, who is qualified to conduct an environmental review and prepare an EA or EIS, as appropriate, and who does not have a financial or other interest in the outcome of the proceedings, under the supervision of OFP. The NEPA process must be completed and approved before OFP will issue a final prohibition order based on the certification.

(b) Environmental review procedure. Except as provided in paragraph (c) of this section, environmental documents, including the EA and EIS, where necessary, will be prepared utilizing the process set forth above. OFP, the powerplant owner or operator and the independent third party shall enter into an agreement for the owner or operator to engage and pay directly for the services of the qualified third party to prepare the necessary documents. The third party will execute an OFP prepared disclosure document stating that

he does not have any conflict of interest, financial or otherwise, in the outcome of either the environmental process or the prohibition order proceeding. The agreement shall outline the responsibilities of each party and his relationship to the other two parties regarding the work to be done or supervised. OFP shall approve the information to be developed and supervise the gathering, analysis and presentation of the information. In addition, OFP will have the authority to approve and modify any statement, analysis, and conclusion contained in the third party prepared environmental documents.

(c) Financial hardship. Whenever the bona fide estimate of the costs associated with NEPA compliance, if borne by the powerplant owner or operator, would make the conversion financially infeasible, OFP may waive the requirement set forth in paragraphs (a) and (b) of this section and perform the necessary environmental review.

(Approved by the Office of Management and Budget under control number 1903-0077) (Department of Energy Organization Act, Pub. L. 95-91 (42 U.S.C. 7101 et seq.); Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and Pub. L. 95-620 (15 U.S.C. 719 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, as amended by Pub. L. 97-35 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35)

[47 FR 17046, Apr. 21, 1982]

APPENDIX I TO PART 504-PROCEDURES FOR THE COMPUTATION OF THE REAL COST OF CAPITAL

(a) The firm's real after-tax weighted average marginal cost of capital (K) is computed with equation 1.

[merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small]

The terms in equation 1 are defined as follows:

Wa-Fraction of existing capital structure which is debt.

WD-Fraction of existing capital structure which is preferred equity.

We-Fraction of existing capital structure which is common equity and retained earnings. Ra=Predicted nominal cost of long term debt expressed as a fraction.

Rp-Predicted nominal cost of preferred stock expressed as a fraction. Re-Predicted nominal cost of common stock expressed as a fraction.

INF=Percentage change in the GNP implicit

price deflator over the past 12 months expressed as a fraction.

fa Flotation cost of debt expressed as a fraction.

fp=Flotation cost of preferred stock expressed as a fraction.

f=Flotation cost of common stock expressed as a fraction.

t=Marginal federal income tax rate for the current year.

(b) Information on parameters used in Equation 1. (1) The parameters used in equation 1 will be the best practicable estimates. They will be obtained from the firm, accepted rating services (e.g., Standard & Poors, Moody's), government publications, accepted financial publications, annual financial reports and statements of firms, and investment bankers.

(2) The predicted nominal cost of debt (Ra) may be estimated by determining the current average yield on newly issued bondsindustrial or utility as appropriate which have the same rating as the firm's most recent debt issue.

(3) The predicted nominal cost of preferred stock (Rp) may be estimated by determining the current average yield on newly issued preferred stock-industrial or utility as appropriate which has the same rating as the firm's most recent preferred stock issue.

(4)(A) The predicted nominal cost of common stock (R) is computed with equation 2. Eq 2 R=R+BXRm where:

R-The risk free interest rate the average of the most recent auction rates of U.S. Government 13-week Treasury Bills, B-The "beta" coefficient-the relationship between the excess return on common stock and the excess return on the S&P 500 composite index, and Rm-The mean excess return on the S&P 500 composite index-the mean of the difference between the return on the S&P 500 composite index and the risk free interest rate for the years 1926-1976 as computed by Ibbotson and Sinquefield(1)— 9.2%

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]

et=The error in month t. PRCC=Closing market prices of the firm's

common stock at the end of month t fully adjusted for splits and stock dividends. DIVRATE=The sum of the dividends paid in the fiscal year which contain month t. Vap.t=The market value of "one share" of the S&P 500 composite index at the end of month t.

Dsp.t=The estimated monthly income received from holding "one share" of the S&P 500 in month t.

The regression analysis is done with sixty months of data. The first month (t=1) is sixty months before the month in which the firm's current fiscal year started. The last month (t=60) is the last month of the past fiscal year.

(5) Where the parameters specified above are not obtainable, alternate parameters that closely correspond to those above may be used. This may include substituting a bond yield for nominal cost of preferred stock where the former is not available. Where the capital structure does not consist of any debt, preferred equity, or common equity, an alternate methodology to predict the firm's real after-tax marginal cost of capital may be used.

Example of using alternate parameters that closely correspond to those above are:

(A) In the case of industrials, who do not typically issue preferred stock, the predicted nominal cost of preferred stock (Rp) can be estimated by determining the current average yield on newly issued industrial bonds which have the same rating as the firm's most recent debt issue.

(B) If necessary, the following assumptions can be made to determine the nominal cost of debt or preferred stock and their flotation costs.

(i) Where a company issued privately placed debt that was not rated, the rating,