laws. All investment tax credits allowed under Federal tax law must be reflected in the computations. The petitioner must use the method of depreciation which results in the greatest present value of the cash flow due to the tax and depreciation effect. The marginal income tax rate (t) is the firm's anticipated marginal Federal income tax rate in year i. The relevant investment tax credits, depreciation methodology, and marginal Federal income tax rates for a specific exemption petition will be those prescribed by Federal law in effect (or those tax parameters which are known with certainty will be in effect) at the time a decision is rendered. (However, if an investment tax credit expires in a certain year under the law which is in effect at the time the petition is submitted, the petitioner must assume that it will in fact expire in that year.)

(7) If powerplants are being compared, the design capacities or the maximum sustained energy per unit of time that could be produced must be the same. If installations are being compared, the maximum sustained energy per unit of time that could be produced must be the same.

(8) All estimated cash outlays must be computed in accordance with generally accepted accounting principles consistently applied.

(9) The scope of the estimates of relevant costs (as discussed above) of units being compared must be the

same.

(10) All allowances for uncertainty and risk in the cost estimates must be explicit.

(11) All cash outlays must be net of any government subsidies or grants.

(e) Evidence in support of the cost calculation. Petitioners for an exemption which requires the use of the cost calculation shall certify that the cost of using alternate fuel substantially exceeds the cost of using oil as primary energy source as calculated in this section. A brief summary of the petitioner's supporting calculations and estimates shall be submitted with the certification. The summary should inIclude the following:

(1) Cash outlays, Investment tax credits, depreciation methodologies, and anticipated salvage for capital in

vestments including a description of all major construction and equipment;

(2) Annual cash outlays for operations and maintenance expenses including the formulas used to compute them; and

(3) Annual cash outlays for delivered fuel expenses including the formulas used to compute them.

[46 FR 59903, Dec. 7, 1981; 46 FR 63033, Dec. 30, 1981; 47 FR 15314, Apr. 9, 1982; 54 FR 52893, Dec. 22, 1989]

§ 503.7 State

approval-general requirement for new powerplants. (a) Where approvals by the appropriate State regulatory authority are required prior to the construction or use of a new powerplant, a petition for an exemption for consideration by OFE may be submitted to OFE prior to obtaining such approvals from the State regulatory authority.

(b) An exemption granted for a powerplant shall not become effective until an adequate demonstration has been made to OFE that all applicable approvals required by the State regulatory authorities have been obtained.

§ 503.8 No alternate power supplygeneral requirement for certain exemptions for new powerplants.

(a) Application. To qualify for an exemption, except in the case of an exemption for cogeneration units, section 213(c) of the Act requires a demonstration that, despite reasonable good faith efforts, there is no alternative supply of electric power available within a reasonable distance at a reasonable cost without impairing short-run or long-run reliability of service. If a petitioner is unable to demonstrate that there is no alternate supply during the first year of operation, OFE will conclude that the absence of the proposed powerplant will not impair short-term reliability of service, and as a result will not grant the exemption. Such action would not impair long-term reliability of service, since a petition may be submitted for a powerplant that would begin operation in a subsequent year.

(b) Criteria. To meet the demonstration required under paragraph (a) of this section, a petitioner must certify that:

(1) A diligent effort has been made to purchase firm power for the first year of operation to cover all or part of the projected shortfall at a cost that is less than ten (10) percent above the annualized cost of generating power from the proposed plant (including the capital, operation and maintenance expenses, and fuel prices); and

(2)(i) Despite these efforts, the reserve margin in the petitioner's electric region, normal dispatch area, or service area, in the absence of the proposed plant, would fall below twenty (20) percent during the first year of proposed operation; or

(ii) Despite these efforts, the reserve margin will be greater than twenty (20) percent but reliability of service would be impaired. In such case, the certification must be related to factors not included in the calculation of reserve margin, such as transmission constraints.

(c) Evidence. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certification required under paragraph (b) of this section; and

(2) Exhibits containing the basis for the certification submitted under this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support its certification to this general requirement).

(d) FERC consultation. OFE will forward a copy of any petition for which a showing is required under this section to FERC promptly after it is filed with OFE, and OFE will consult with FERC before making the no alternate supply of power finding.

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15314, Apr. 9, 1982; 54 FR 52894, Dec. 22, 1989]

$503.9 Use of mixtures-general requirement for certain permanent exemptions.

(a) Criteria. To qualify for a permanent exemption, except in the case of an exemption for fuel mixtures, section 213(a)(1) of the Act requires a demonstration that the use of a mixture of natural gas and petroleum and an alternate fuel for which an exemption

under 10 CFR 503.38 (Fuel mixtures) would be available, would not be economically or technically feasible.

(b) Evidence. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications to the criteria set forth in paragraph (a) of this section; and

(2) Exhibits containing the basis for the certifications submitted under this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support its certifications to this general requirement.)

NOTE: In meeting this general requirement, OFE will require a petitioner to examine only mixtures of oil and coal and natural gas and coal, or, where petitioner wishes to examine an additional or substitute mixture, such other alternate fuels as OFE and the petitioner agree are reasonable to petitioner's circumstances.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.10 Use of fluidized bed combustion not feasible-general requirement for permanent exemptions.

(a) OFE finding. Except in the case of an exemption for fuel mixtures, OFE may deny permanent exemptions authorized under section 212 of the Act if OFE finds on a site-specific or generic basis that use of a method of fluidized bed combustion of an alternate fuel is economically and technically feasible.

(b) Demonstration. If OFE has made such a finding, OFE will deny a petitioner's request for exemption unless the petitioner demonstrated that the use of a method of fluidized bed combustion is not economically or technically feasible. The petition or any supplement thereto required by OFE must include the following evidence:

(1) If use of a method of fluidized bed combustion were to be required, evidence that the petitioner would be eligible for a permanent exemption for lack of alternate fuel supply, site limitations, environmental requirements, lack of adequate capital, or State or local requirements; or

(2) Use of a method of fluidized bed combustion is not technically or economically feasible due to design or special circumstances.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.11 Alternative sites-general requirement for permanent exemptions for new powerplants.

(a) Criteria. To qualify for permanent exemption due to lack of alternate fuel supply, site limitations, environmental requirements, or inadequate capital, section 212(a) of the Act requires a demonstration that one of these exemptions would be available for any reasonable alternative site for the facility.

(b) Evidence. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications to the criteria set forth in paragraph (a) of this section; and

(2) Exhibits containing the basis for the certifications submitted under this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support its certifications to this general requirement).

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.12 Terms and conditions; compliance plans.

(a) Terms and conditions generally. A petitioner must comply with any terms and conditions imposed upon the grant of an exemption petition. OFE will limit any such terms and conditions to the unit(s) which is the subject of the petition.

(b) Compliance plans for temporary exemptions. (1) Any compliance plan required to accompany a petition for a temporary exemption shall include the following:

(i) A detailed schedule of progressive events and the dates upon which the events are to take place, indicating how compliance with the applicable prohibitions of the Act will occur;

(ii) Evidence of binding contracts for fuel, or for facilities for the production of fuel, which are required for compli

ance with the applicable prohibitions of the Act;

(iii) A schedule indicating how any necessary permits and approvals required to burn an alternate fuel will be obtained; and

(iv) Any other documentary evidence which indicates an ability to comply with the applicable prohibitions of the Act.

(2) Any exemption for which a compliance plan is required shall not be effective until the compliance plan is approved by DOE.

(3) If the petition is granted, an updated, duly executed plan must be submitted to OFE within one (1) month of an alteration of any milestone in the compliance plan, together with the reasons for the alteration and its impact upon the scheduling of all other milestones in the plan.

§ 503.13 Environmental impact analysis.

In order to enable OFE to comply with NEPA, a petitioner must include the information indicated in this section if a permanent exemption is requested. Material which has been prepared pursuant to any Federal, State or local requirement for environmental information for this unit or site may be incorporated by reference and appended to the petition. Guidelines issued by OFE for environmental reports should be used in preparing this analysis (44 FR 63740, November 5, 1979). These guidelines, which are also available in the OFE public document room, have been designed to insure that environmental reports follow the format prescribed by Council on Environmental Quality final regulations implementing NEPA. The guidelines are subject to discussion at a prepetition conference and to modification according to the facts of a particular case.

(a) All petitions for permanent exemptions must contain the following information:

[blocks in formation]
[ocr errors][ocr errors]

fuel capability, and its pollution abatement systems and equipment (including those systems and equipment necessary for all fuel scenarios considered);

(2) A description of the existing environment, including air, water, and land resources;

(3) Direct and indirect environmental impacts of the proposed action including impacts of alternative fuel scenarios, and no build alternatives.

(4) Regulatory requirements governing the facility, including a description of Federal, State and local requirements for air, water, noise and solid waste disposal which must be met for each fuel considered.

(b) For exemptions for cogeneration, the information enumerated below is to be submitted in lieu of the information required by paragraph (a) of this section. However, submission of the following information merely establishes a rebuttable presumption that the grant or denial of the exemption would have no significant environmental impact. OFE may, in individual cases, during the course of the administrative proceeding, determine that additional environmental information is required. In such cases, the petitioner will be required to submit the information described in paragraph (a) of this section.

(1) A certification that the petitioner will, prior to operating the unit under the exemption, secure all applicable environmental permits and approvals pursuant to, but not limited to, the following: Clean Air Act, Rivers and Harbors Act, Coastal Zone Management Act, Safe Drinking Water Act, Resource Conservation and Recovery Act; and

(2) Information required by the following environmental checklist must be provided and certified as accurate:

Environmental Checklist for FUA Certification Exemptions Instructions

All questions are to be answered by placing a check in the appropriate box. N/A represents (not applicable). Although it is not required, the petitioner may elaborate on any question in writing on a separate sheet of paper.

(1) Is your facility located in, or will it affect a wetland (Protection of Wetlands Executive Order No. 11990)?

(2) Is your facility located in, or will it affect, a 100-year floodplain (Floodplain Management Executive Order No. 11988)?

(3) Will your facility affect a designated wild, scenic, or recreation river (Wild and Scenic Rivers Act)?

(4)(A) Is your facility located

within a county in which crit-
ical habitat for threatened or
endangered species are

known to exist (Endangered
Species Act)?

(4)(B) Has a qualified biologist
determined that your facility
will not affect any species on
the Threatened and Endan-
gered Species list?
(5) Is your facility located on, or
will it affect land that has
been classified as prime or
unique farmland or rangeland
by the U.S. Department of
Agriculture?

(6) Is your facility located on, or will it affect, historical archaeological, or cultural resources that have been designated pursuant to the National Historic Preservation Act?

[blocks in formation]

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15315, Apr. 9, 1982; 51 FR 18866, May 22, 1986; 52 FR 658, Jan. 7, 1987; 54 FR 52894, Dec. 22, 1989]

§ 503.14 Fuels search.

Prior to submitting a petition for a permanent exemption for lack of alternate fuel supply, site limitations, inadequate capital, or state or local requirements, a petitioner must examine the use of conventional solid coal as a primary energy source at the site under consideration, and at reasonable alternative sites. Where a petitioner believes that its use of such coal would be infeasible, however, and where OFE and the petitioner can reach accord, it may evaluate use of a different alternate fuel in lieu of solid coal. A petitioner of these exemptions must demonstrate for any fuel examined that he would qualify for an exemption.

[54 FR 52894, Dec. 22, 1989]

Subpart C-Temporary
Exemptions for New Facilities

§ 503.20 Purpose and scope.

(a) This subpart implements the provisions contained in section 211 of the Act with regard to temporary exemptions for new facilities.

(b) This subpart establishes the criteria and standards which owners or operators of new powerplants who petition for a temporary exemption must meet to sustain their burden of proof under the Act.

(c) All petitions for temporary exemptions shall be submitted in accordance with the procedures set out in part 501 of this chapter and the applicable requirements of part 503 of these regulations.

(d) The duration of any temporary exemption granted under this subpart shall be measured from the date that the facility is placed in service using petroleum or natural gas.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.21 Lack of alternate fuel supply.

(a) Eligibility. Section 211(a)(1) of the Act provides for a temporary exemption due to the unavailability of an adequate and reliable supply of an alternate fuel at a cost which does not substantially exceed the cost of using imported petroleum. To qualify, a petitioner must certify that:

(1) A good faith effort has been to obtain an adequate and reliable supply of an alternate fuel of the quality necessary to conform to the design and operational requirements of the unit;

(2) For the period of the proposed exemption, the cost of using such alternate fuel would substantially exceed the cost of using imported petroleum as a primary energy source as defined in § 503.6 (Cost calculation) of these regulations;

(3) The petitioner will be able to comply with the applicable prohibitions of the Act at the end of the proposed exemption period; and

(4) No alternate power supply exists, as required under §503.8 of these regulations.

(b) Evidence required in support of a petition. The petition must include the

following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) All data required by §503.6 (cost calculation) of these regulations necessary for computing the cost calculation formula; and

(4) The anticipated duration of the lack of alternate fuel supply which constitutes the basis for the exemption.

[merged small][ocr errors][merged small]

(c) Duration. This temporary exemption, taking into account any extensions or renewals, may not exceed 10: years.

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15315, Apr. 9, 1982; 54 FR 52894, Dec. 22, 1989]

§ 503.22 Site limitations.

(a) Eligibility. Section 211(a)(2) of the Act provides for a temporary exemption due to a site limitation. To qualify for such an exemption, a petitioner must certify that:

(1) One or more specific physical limitations relevant to the location or operation of the proposed facility exist which, despite diligent good faith efforts, cannot be overcome before the end of the proposed exemption period;

(2) The petitioner will be able to comply with the applicable prohibitions of the Act at the end of the proposed exemption period; and

(3) No alternate power supply exists, as required under §503.8 of these regulations.

NOTE: Examples of the types of site limitations to which a petitioner may certify in order to qualify for this exemption include:

(i) Inaccessability of alternate fuels as a result of a specific physical limitation;

(ii) Unavailability of transportation facilities for alternate fuels;