Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 35
Page 10
... yard and end of construction railroad. Transporting freight of all kinds on the construction railroad for the Government or its agents, other than the contractor, in car lots, between delivery yard and end of construction railroad ...
... yard and end of construction railroad. Transporting freight of all kinds on the construction railroad for the Government or its agents, other than the contractor, in car lots, between delivery yard and end of construction railroad ...
Page 21
... yard near Boulder City as shown on the location map and further described in paragraph 40 for construction railroad. The contractor shall haul all such materials from the point of delivery to the work, shall provide suitable warehouses ...
... yard near Boulder City as shown on the location map and further described in paragraph 40 for construction railroad. The contractor shall haul all such materials from the point of delivery to the work, shall provide suitable warehouses ...
Page 26
... yard bid under item No. 119 of the schedule. No payment will be made for any other material wasted from the gravel deposits, including excess material of any of the sizes into which the aggregates are required to be separated by the ...
... yard bid under item No. 119 of the schedule. No payment will be made for any other material wasted from the gravel deposits, including excess material of any of the sizes into which the aggregates are required to be separated by the ...
Page 27
... yard near Boulder City to a point about 1,500 feet west of the olam on the Nevada side of the river, a distance of ... yards. It is contemplated that the railroad will be completed and ready for opera|ion by September 1, 1931, but the ...
... yard near Boulder City to a point about 1,500 feet west of the olam on the Nevada side of the river, a distance of ... yards. It is contemplated that the railroad will be completed and ready for opera|ion by September 1, 1931, but the ...
Page 28
... yard to the end of the construction railroad or from the end of the construction railroad to the delivery yard, materials of every kind and nature required to be transported for the Government or for other contractors or agents of the ...
... yard to the end of the construction railroad or from the end of the construction railroad to the delivery yard, materials of every kind and nature required to be transported for the Government or for other contractors or agents of the ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...