Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 67
Page 13
... unit prices.—The quantities noted in the Schedules are approximations for comparing bids, and no claim shall be made against the Government for excess or deficiency therein, actual or relative. Payment at the prices agreed upon will be ...
... unit prices.—The quantities noted in the Schedules are approximations for comparing bids, and no claim shall be made against the Government for excess or deficiency therein, actual or relative. Payment at the prices agreed upon will be ...
Page 21
... unit prices are not provided in the schedule shall be included in the unit prices bid for the work to which they are appurtenant. The contractor shall return to the Government at the delivery yard, at the dam site, or at any point on ...
... unit prices are not provided in the schedule shall be included in the unit prices bid for the work to which they are appurtenant. The contractor shall return to the Government at the delivery yard, at the dam site, or at any point on ...
Page 22
... cost of hauling, storing, and handling all the materials described above and of furnishing all the materials required to be furnished by the contractor shall be included in the unit prices bid for the work for which the materials are ...
... cost of hauling, storing, and handling all the materials described above and of furnishing all the materials required to be furnished by the contractor shall be included in the unit prices bid for the work for which the materials are ...
Page 25
... unit prices bid for the various items of work in the schedule. The contractor shall furnish water for use by the Government in the testing laboratory and for other purposes at the site of the work and payment therefor will be made at the ...
... unit prices bid for the various items of work in the schedule. The contractor shall furnish water for use by the Government in the testing laboratory and for other purposes at the site of the work and payment therefor will be made at the ...
Page 26
... cost of all work required by this paragraph shall be included in the unit prices bid in the schedule for the items of work in which the materials obtained are used, which unit prices shall also include all expenses of the 000 ...
... cost of all work required by this paragraph shall be included in the unit prices bid in the schedule for the items of work in which the materials obtained are used, which unit prices shall also include all expenses of the 000 ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...