Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 12
Page
... tile floors---------- Cement mortar finish for concrete Thin walls of metal lath and plaster-- Metal work and painting, general: Installing metal work--------------- Weights of machinery and metal Pipes and structural steel: 143. 144 ...
... tile floors---------- Cement mortar finish for concrete Thin walls of metal lath and plaster-- Metal work and painting, general: Installing metal work--------------- Weights of machinery and metal Pipes and structural steel: 143. 144 ...
Page
... tile------------------------ 177. Ceramic-tile walls and floors 178. Plumbing and hardware 179. Steel partitions--------------------. 180. Sheet metal work------------------ 181. Temporary end walls in power house182. Miscellaneous ...
... tile------------------------ 177. Ceramic-tile walls and floors 178. Plumbing and hardware 179. Steel partitions--------------------. 180. Sheet metal work------------------ 181. Temporary end walls in power house182. Miscellaneous ...
Page 4
... ----) per lin. ft.------- 47 | Placing tile roofs-- - - - - - - - - - - - - - 10,000 sq. ft., at--------------------------------- (Words) * -e oso o so o os o me amo some so to some or so ome som ($----------) per sq. ft.---- ...
... ----) per lin. ft.------- 47 | Placing tile roofs-- - - - - - - - - - - - - - 10,000 sq. ft., at--------------------------------- (Words) * -e oso o so o os o me amo some so to some or so ome som ($----------) per sq. ft.---- ...
Page 9
... tile walls and 2,000 sq. yds., at-------------------------------- ceilings. - (Words) - * * * * - - - - some so so o ... tile walls and 250 sq. yds., at---------------------------------- floors. - (Words) ...
... tile walls and 2,000 sq. yds., at-------------------------------- ceilings. - (Words) - * * * * - - - - some so so o ... tile walls and 250 sq. yds., at---------------------------------- floors. - (Words) ...
Page 21
... tile, lime putty or plastic fire clay, and white Portland cement for hollow-tile walls; ceramic tile for walls and floors; roofing materials except back fill; corrugated metal pipe and coupling bands for highway drains and culverts ...
... tile, lime putty or plastic fire clay, and white Portland cement for hollow-tile walls; ceramic tile for walls and floors; roofing materials except back fill; corrugated metal pipe and coupling bands for highway drains and culverts ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...