Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 31
Page 16
... sufficiently large to accommodate at least 6 and possibly 8 main power-generating units together with transformers, switching, and control equipment, and auxiliary apparatus. The length of the front or river face of each wing will be ...
... sufficiently large to accommodate at least 6 and possibly 8 main power-generating units together with transformers, switching, and control equipment, and auxiliary apparatus. The length of the front or river face of each wing will be ...
Page 19
... sufficient to permit installation of the 6 upstream power units on each side of the river;+he-pertier ae—building—e #g—#ke—t wings; the substructure of the power house, for installation of two additional power units on each side of the ...
... sufficient to permit installation of the 6 upstream power units on each side of the river;+he-pertier ae—building—e #g—#ke—t wings; the substructure of the power house, for installation of two additional power units on each side of the ...
Page 26
... sufficient material from these deposits to complete the work after the deposits have been flooded. The storage of this material may be above the water surface of the required storage at any location which may be selected by the ...
... sufficient material from these deposits to complete the work after the deposits have been flooded. The storage of this material may be above the water surface of the required storage at any location which may be selected by the ...
Page 26
... sufficient material from these deposits to complete the work after the deposits have been flooded. The storage of this material may be above the water surface of the required storage at any location which may be selected by the ...
... sufficient material from these deposits to complete the work after the deposits have been flooded. The storage of this material may be above the water surface of the required storage at any location which may be selected by the ...
Page 32
... sufficiently sound and stable to not require removal as contemplated by this paragraph but which is loosened or otherwise rendered unstable by any unnecessary or careless operation of the contractor so that, in the opinion of the ...
... sufficiently sound and stable to not require removal as contemplated by this paragraph but which is loosened or otherwise rendered unstable by any unnecessary or careless operation of the contractor so that, in the opinion of the ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...