Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 45
Page 24
... paragraph shall be construed as in any wise obligating the Government to continue to operate the town of Boulder ... requirements for domestic water, and the quality and adequao of the supply of water shall be subject to the approval of the ...
... paragraph shall be construed as in any wise obligating the Government to continue to operate the town of Boulder ... requirements for domestic water, and the quality and adequao of the supply of water shall be subject to the approval of the ...
Page 25
... provisions of this paragraph shall be included in the unit prices bid for the various items of work in the schedule. The contractor shall furnish water for use by the Government in the testing laboratory and for other purposes at the ...
... provisions of this paragraph shall be included in the unit prices bid for the various items of work in the schedule. The contractor shall furnish water for use by the Government in the testing laboratory and for other purposes at the ...
Page 26
... requirements in Boulder City at rates to be established for the sale of power in ... provisions of these specifications, as stated in other paragraphs, require ... paragraph shall be included in the unit prices bid in the schedule for the ...
... requirements in Boulder City at rates to be established for the sale of power in ... provisions of these specifications, as stated in other paragraphs, require ... paragraph shall be included in the unit prices bid in the schedule for the ...
Page 26
... paragraph 37) 37, Sand and gravel deposits.-Sand, gravel, and cobbles for ... provisions of these specifications, as stated in other paragraphs, require ... paragraph, except as provided for stripping under item No. 119, shall be included ...
... paragraph 37) 37, Sand and gravel deposits.-Sand, gravel, and cobbles for ... provisions of these specifications, as stated in other paragraphs, require ... paragraph, except as provided for stripping under item No. 119, shall be included ...
Page 31
... provisions of article 5 of the contract and paragraph 10 of these specifications: And provided further, That if the contractor shall fail to use due diligence in the enlargement, repair, and maintenance of the accepted works as directed ...
... provisions of article 5 of the contract and paragraph 10 of these specifications: And provided further, That if the contractor shall fail to use due diligence in the enlargement, repair, and maintenance of the accepted works as directed ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...