Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 25
Page
... plates in 16 tunnels, adits, and shafts--------- 17 54. Open-cut excavation for diversion tun17 nels---------------------------- 55. Excavation of diversion tunnels-- - - - 19 56. Care of river and unwatering founda– tions ...
... plates in 16 tunnels, adits, and shafts--------- 17 54. Open-cut excavation for diversion tun17 nels---------------------------- 55. Excavation of diversion tunnels-- - - - 19 56. Care of river and unwatering founda– tions ...
Page
... 147. 148. . Placing . Finishing * * * * * * * * - - - - - - - - - - - - - - - - = - - * * * * * * * * * * * - - - - - - - - - - - - - - 140. 141. 76 76 Pipes and structural steel—Continued. 161. Metal floor plates 162. Metal IV.
... 147. 148. . Placing . Finishing * * * * * * * * - - - - - - - - - - - - - - - - = - - * * * * * * * * * * * - - - - - - - - - - - - - - 140. 141. 76 76 Pipes and structural steel—Continued. 161. Metal floor plates 162. Metal IV.
Page
... Plate-steel conduit linings for outlet Plate-steel conduit linings for power penstocks ... plates 162. Metal stairways------------------- Gates and other mechanical machinery: 163. Stoney gates and hoists ...
... Plate-steel conduit linings for outlet Plate-steel conduit linings for power penstocks ... plates 162. Metal stairways------------------- Gates and other mechanical machinery: 163. Stoney gates and hoists ...
Page 7
... plate-steel conduit 6,435,000 pounds, at ---------------------------- linings for outlet works. - (Words) some o 'o - - - so som ... plates, and arch ring (Words) Segmental bars in tunnels, l------------------ ($---------- ) per pound ...
... plate-steel conduit 6,435,000 pounds, at ---------------------------- linings for outlet works. - (Words) some o 'o - - - so som ... plates, and arch ring (Words) Segmental bars in tunnels, l------------------ ($---------- ) per pound ...
Page 16
... plate-steel conduit lining, having a thickness varying from 1% to 2. inches, and the Space between the steel lining and the rock will be filled with concrete. 20. Description of inclined freight elevator.—The inclined freight elevator ...
... plate-steel conduit lining, having a thickness varying from 1% to 2. inches, and the Space between the steel lining and the rock will be filled with concrete. 20. Description of inclined freight elevator.—The inclined freight elevator ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.