... paragraph 24, and is shown on the drawings. This program assumes that the date of receipt by the contractor of ... 27. Materialso no i. o o: Complete the work as provided in paragraph 24. use in concrete gro ut it y d e Government—The ...
... paragraph 24, and is shown on the drawings. This program assumes that the date of receipt by the contractor of ... 27. Materialso no i. o o: Complete the work as provided in paragraph 24. use in concrete gro ut it y d e Government—The ...
Page 22
... paragraph or in Paragraph 27, that will not become a part of the completed construction work. The contractor shall haul all these materials as well as all materials delivered to the contractor by the Government from the point of ...
... paragraph or in Paragraph 27, that will not become a part of the completed construction work. The contractor shall haul all these materials as well as all materials delivered to the contractor by the Government from the point of ...
Page 27
... paragraph 39, are |shown on the drawings. The Government assumes no responsibility for the condition or maintenance of any road or highway or structure thereon that may be used by the contractor in performing the work under these ...
... paragraph 39, are |shown on the drawings. The Government assumes no responsibility for the condition or maintenance of any road or highway or structure thereon that may be used by the contractor in performing the work under these ...
Page 28
... paragraph 27 for use in constructing the dam and related works, and the entire cost thereof shall be included in the unit prices bid in the schedule for the items of work in the performance of which the railroad is used. The engines ...
... paragraph 27 for use in constructing the dam and related works, and the entire cost thereof shall be included in the unit prices bid in the schedule for the items of work in the performance of which the railroad is used. The engines ...
Page 48
... paragraph 10 of these specifications. Drainage holes will be measured for ... 27. When required by the contracting officer, the cement shall be screened ... paragraph 102, under continuous pressure, as required by the contracting officer ...
... paragraph 10 of these specifications. Drainage holes will be measured for ... 27. When required by the contracting officer, the cement shall be screened ... paragraph 102, under continuous pressure, as required by the contracting officer ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...