Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 40
Page
... joints in dam----------- Pressure grouting contraction joints Concrete: 96. . Broken rock or gravel-------------- . Cobble rock----------------------- . Samples of concrete aggregates------ . Water for mixing------------------ ...
... joints in dam----------- Pressure grouting contraction joints Concrete: 96. . Broken rock or gravel-------------- . Cobble rock----------------------- . Samples of concrete aggregates------ . Water for mixing------------------ ...
Page 4
... joints in dam. (Words) * * * * * * * * * * * * * * * * * * ($----------) per cu. ft.------- 46 | Manufacturing and placing po- || 38,400 lin. ft., at - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - rous concrete draintile ...
... joints in dam. (Words) * * * * * * * * * * * * * * * * * * ($----------) per cu. ft.------- 46 | Manufacturing and placing po- || 38,400 lin. ft., at - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - rous concrete draintile ...
Page 9
... ------------------ in contraction joints. (Words) - - - - - - - - - - - - - - - - - - ($---------- ) per lin. ft--------|-------------- 113 | Installing miscellaneous items of 231,000 pounds, at--------------------------- ...
... ------------------ in contraction joints. (Words) - - - - - - - - - - - - - - - - - - ($---------- ) per lin. ft--------|-------------- 113 | Installing miscellaneous items of 231,000 pounds, at--------------------------- ...
Page 15
... joints thus formed between adjacent columns will be equipped with pipe and fittings, installed in systems 100 feet in height, by which, after the concrete embedding each system is placed and after the setting heat has been dissipated ...
... joints thus formed between adjacent columns will be equipped with pipe and fittings, installed in systems 100 feet in height, by which, after the concrete embedding each system is placed and after the setting heat has been dissipated ...
Page 17
... joint layout–Plan and sections. 26. (24.126) 45–D–926–Contraction joint layout—Detail perspective. 27. (24197) 45–D–927–Grouting system layout. - 28. (24128) 45–D–928—Cooling system layout. 29. (24.129) 45—D—929–Shafts and galleries. 30 ...
... joint layout–Plan and sections. 26. (24.126) 45–D–926–Contraction joint layout—Detail perspective. 27. (24197) 45–D–927–Grouting system layout. - 28. (24128) 45–D–928—Cooling system layout. 29. (24.129) 45—D—929–Shafts and galleries. 30 ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...