Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 58
Page 13
... cover materials, supplies, labor, tools, machinery, and all other ... cost to the Government, provide such material and give such assistance as ... expense, and his sureties shall be liable therefor. - 8. Data to be furnished by ...
... cover materials, supplies, labor, tools, machinery, and all other ... cost to the Government, provide such material and give such assistance as ... expense, and his sureties shall be liable therefor. - 8. Data to be furnished by ...
Page 14
... price in the order, the extra work and material shall be paid for at actual necessary cost as determined by the contracting officer, plus 15 per cent for superintendence, general expense, and profit. The actual necessary cost will include ...
... price in the order, the extra work and material shall be paid for at actual necessary cost as determined by the contracting officer, plus 15 per cent for superintendence, general expense, and profit. The actual necessary cost will include ...
Page 21
... cost of unloading, hauling, storing, and caring for all materials furnished by the Government for use or installation by the contractor shall be included in the prices bid for the work in which the materials are to be used. The cost of ...
... cost of unloading, hauling, storing, and caring for all materials furnished by the Government for use or installation by the contractor shall be included in the prices bid for the work in which the materials are to be used. The cost of ...
Page 22
... cost of hauling, storing, and handling all the materials described above and of furnishing all the materials required to be furnished by the contractor shall be included in the unit prices bid for the work for which the materials are ...
... cost of hauling, storing, and handling all the materials described above and of furnishing all the materials required to be furnished by the contractor shall be included in the unit prices bid for the work for which the materials are ...
Page 23
... included with these specifications are those which have been submitted to the Colorado River Board for approval. Final ... cost to the Government. - 34. Use of Boulder City as camp site.—Owing to the inaccessibility of the work, the ...
... included with these specifications are those which have been submitted to the Colorado River Board for approval. Final ... cost to the Government. - 34. Use of Boulder City as camp site.—Owing to the inaccessibility of the work, the ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...