Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 30
Page 21
... hauling, storing, and caring for all materials furnished by the Government for use or installation by the contractor shall be included in the prices bid for the work in which the materials are to be used. The cost of handling and ...
... hauling, storing, and caring for all materials furnished by the Government for use or installation by the contractor shall be included in the prices bid for the work in which the materials are to be used. The cost of handling and ...
Page 22
... hauling, storing, and handling all the materials described above and of furnishing all the materials required to be furnished by the contractor shall be included in the unit prices bid for the work for which the materials are required ...
... hauling, storing, and handling all the materials described above and of furnishing all the materials required to be furnished by the contractor shall be included in the unit prices bid for the work for which the materials are required ...
Page 26
... prices shall also include all expenses of the 000" ****reening, Washing, furnishing, hauling, storing, mixing, and other operations necessary on the aggregates, - (Revision of February 17, 1931, to be inserted at page. 26.
... prices shall also include all expenses of the 000" ****reening, Washing, furnishing, hauling, storing, mixing, and other operations necessary on the aggregates, - (Revision of February 17, 1931, to be inserted at page. 26.
Page 26
... of the contractor in screening, washing, furnishing, hauling, storing, mixing, and other operations necessary on the aggregates. 43037–31 38. Roads and highways, general,—The approximate locations of existing roads 26—a.
... of the contractor in screening, washing, furnishing, hauling, storing, mixing, and other operations necessary on the aggregates. 43037–31 38. Roads and highways, general,—The approximate locations of existing roads 26—a.
Page 28
... hauled unchanged over the railroad. In addition to the materials to be transported over the railroad as specified above, the contractor shall also transport from the delivery yard to the end of the construction railroad or from the end ...
... hauled unchanged over the railroad. In addition to the materials to be transported over the railroad as specified above, the contractor shall also transport from the delivery yard to the end of the construction railroad or from the end ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...