Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 11
Page
... Gunite surfacing on concrete-------- Rough finish for tile floors---------- Cement mortar finish for concrete Thin walls of metal lath and plaster-- Metal work and painting, general: Installing metal work--------------- Weights of ...
... Gunite surfacing on concrete-------- Rough finish for tile floors---------- Cement mortar finish for concrete Thin walls of metal lath and plaster-- Metal work and painting, general: Installing metal work--------------- Weights of ...
Page 6
... Gunite surfacing on concrete, 1 inch thick. Special finishing of walls in power house, parapets, and other concrete surfaces. Placing %-inch finish on concrete floors. Thin walls of metal lath and plaster. Placing reinforcement bars and ...
... Gunite surfacing on concrete, 1 inch thick. Special finishing of walls in power house, parapets, and other concrete surfaces. Placing %-inch finish on concrete floors. Thin walls of metal lath and plaster. Placing reinforcement bars and ...
Page 21
... gunite, and mortar; stones for rubble-masonry walls; all form materials, including oil for oiling forms, except as otherwise provided in paragraph 122; all lumber for temporary timbering in tunnels, shafts, and adits, if required, and ...
... gunite, and mortar; stones for rubble-masonry walls; all form materials, including oil for oiling forms, except as otherwise provided in paragraph 122; all lumber for temporary timbering in tunnels, shafts, and adits, if required, and ...
Page 26
... gunite shall be obtained by the contractor from natural deposits on the Arizona side of the Colorado River about 8 miles upstream from the dam site. These deposits will be referred to in these specifications as the Arizona gravel ...
... gunite shall be obtained by the contractor from natural deposits on the Arizona side of the Colorado River about 8 miles upstream from the dam site. These deposits will be referred to in these specifications as the Arizona gravel ...
Page 26
... gunite shall be obtained by the contractor from natural deposits on the Arizona side of the Colorado River about 8 miles upstream from the dam site. These deposits will be referred to in these specifications as the Arizona gravel ...
... gunite shall be obtained by the contractor from natural deposits on the Arizona side of the Colorado River about 8 miles upstream from the dam site. These deposits will be referred to in these specifications as the Arizona gravel ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...