Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 37
Page
... Grout and drainage systems: 84. 85. 86. 87. 88. 89. 90. 91. 92. 93. Roofs: 94. 95. Drilling grout holes in tunnels, adits, and shafts---------------------- Drilling grout holes in foundations for dam and spillway crests ...
... Grout and drainage systems: 84. 85. 86. 87. 88. 89. 90. 91. 92. 93. Roofs: 94. 95. Drilling grout holes in tunnels, adits, and shafts---------------------- Drilling grout holes in foundations for dam and spillway crests ...
Page
... grouting tunnels, adits, and * = ** as so some , s = * * * * * * * * * * * * m some so o osmo some o os Pipe for draining foundation of dam_Pipe for cooling concrete------------ Control piping for high-pressure gatesMetal pipe for ...
... grouting tunnels, adits, and * = ** as so some , s = * * * * * * * * * * * * m some so o osmo some o os Pipe for draining foundation of dam_Pipe for cooling concrete------------ Control piping for high-pressure gatesMetal pipe for ...
Page 3
... grout holes in tunnels, adits, and shafts. Drilling grout holes in foundations for dam and spillway crests, not more than 50 feet deep. - - Drilling grout holes in foundations for dam and spillway crests more than 50 feet and not more ...
... grout holes in tunnels, adits, and shafts. Drilling grout holes in foundations for dam and spillway crests, not more than 50 feet deep. - - Drilling grout holes in foundations for dam and spillway crests more than 50 feet and not more ...
Page 4
... grout holes in founda- || 17,000 lin. ft., at -------------------------------- tions for dam and spillway (Words) ... grouting bars in place. (Words) * * * * * * * * * * * * * *s-, * =s sm o ($----------) per lin. ft.-------- 40 ...
... grout holes in founda- || 17,000 lin. ft., at -------------------------------- tions for dam and spillway (Words) ... grouting bars in place. (Words) * * * * * * * * * * * * * *s-, * =s sm o ($----------) per lin. ft.-------- 40 ...
Page 15
... grout holes will vary in depth up to a maximum of about 150 feet, with alternate holes about two-thirds the depth of adjacent holes. The main drainage gallery will be parallel to the axis of the dam, with the upstream wall of the ...
... grout holes will vary in depth up to a maximum of about 150 feet, with alternate holes about two-thirds the depth of adjacent holes. The main drainage gallery will be parallel to the axis of the dam, with the upstream wall of the ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...