Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 40
Page 14
... forms, and other like material, belonging to him or used under his direction during construction, and in the event ... form a water-tight cut-off wall in the river bed and the top of this piling will be incased in the concrete wall at ...
... forms, and other like material, belonging to him or used under his direction during construction, and in the event ... form a water-tight cut-off wall in the river bed and the top of this piling will be incased in the concrete wall at ...
Page 21
... form materials, including oil for oiling forms, except as otherwise provided in paragraph 122; all lumber for temporary timbering in tunnels, shafts, and adits, if required, and for stop planks for inlet of inner diversion tunnel; steel ...
... form materials, including oil for oiling forms, except as otherwise provided in paragraph 122; all lumber for temporary timbering in tunnels, shafts, and adits, if required, and for stop planks for inlet of inner diversion tunnel; steel ...
Page 32
... forms, ladders, spikes, nails, troughs for plumb-bob lines, light, and such assistance as may be required by the contracting officer in giving lines and grades. The contracting officer's marks shall be carefully preserved by the ...
... forms, ladders, spikes, nails, troughs for plumb-bob lines, light, and such assistance as may be required by the contracting officer in giving lines and grades. The contracting officer's marks shall be carefully preserved by the ...
Page 33
... forms, measurement for payment will be made only for the excavation within the neat lines of the structure: And provided further, That for any structure or open cut where, in the opinion of the contracting officer, the conditions ...
... forms, measurement for payment will be made only for the excavation within the neat lines of the structure: And provided further, That for any structure or open cut where, in the opinion of the contracting officer, the conditions ...
Page 39
... forms. 64. Excavation for intake towers.-The item in the schedule covering excavation for intake towers includes the required excavation for all intake towers, terminating at the base of the concrete foundation for the Superstructures ...
... forms. 64. Excavation for intake towers.-The item in the schedule covering excavation for intake towers includes the required excavation for all intake towers, terminating at the base of the concrete foundation for the Superstructures ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...