Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 33
Page
... elevator by con13 tractor------------------------- 13 43. Acceptance of cofferdams by Govern13 ment--------------------------- 13 44. Development of power prior to com13 pletion of dam------------------- 14 | Earthwork: ...
... elevator by con13 tractor------------------------- 13 43. Acceptance of cofferdams by Govern13 ment--------------------------- 13 44. Development of power prior to com13 pletion of dam------------------- 14 | Earthwork: ...
Page
... inclined freight elevator structures-------------------- Excavation for highway------------ Excavation for highway structures--- Back fill for power house------------ Back fill for switching station------- Back fill on roofs ...
... inclined freight elevator structures-------------------- Excavation for highway------------ Excavation for highway structures--- Back fill for power house------------ Back fill for switching station------- Back fill on roofs ...
Page
... elevator guide structure---...----------- SCHEDULE-Continued Work or material Excavation: All classes, for Spillways, in. Pipes and structural steel—Continued. 161. Metal floor plates 162. Metal stairways------------------- Gates and ...
... elevator guide structure---...----------- SCHEDULE-Continued Work or material Excavation: All classes, for Spillways, in. Pipes and structural steel—Continued. 161. Metal floor plates 162. Metal stairways------------------- Gates and ...
Page 2
... elevator structures. Excavation: Common, for highway. Excavation: Rock, for highway_ _ Excavation: All classes, for highway structures. Back fill for power house-------- SCHEDULE –Continued Work or material Back fill for switching ...
... elevator structures. Excavation: Common, for highway. Excavation: Rock, for highway_ _ Excavation: All classes, for highway structures. Back fill for power house-------- SCHEDULE –Continued Work or material Back fill for switching ...
Page 6
... elevator structures. Concrete in highway structures--- Gunite surfacing on concrete, 1 inch thick. Special finishing of walls in power house, parapets, and other concrete surfaces. Placing %-inch finish on concrete floors. Thin walls of ...
... elevator structures. Concrete in highway structures--- Gunite surfacing on concrete, 1 inch thick. Special finishing of walls in power house, parapets, and other concrete surfaces. Placing %-inch finish on concrete floors. Thin walls of ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...