Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 93
Page
... ---- . Data to be furnished by contractor___ . Sanitation------------------------ Cleaning up----------------------- Failure of Congress to appropriate Patents--------------------------- Special conditions: 14. 15. 16. 17. 18. 19 ...
... ---- . Data to be furnished by contractor___ . Sanitation------------------------ Cleaning up----------------------- Failure of Congress to appropriate Patents--------------------------- Special conditions: 14. 15. 16. 17. 18. 19 ...
Page 10
... contractor, in car lots, between delivery yard and end of construction railroad. Unloading freight of all kinds for the Government or its agents, other than the contractor, at the end of the construction railroad and placing in ...
... contractor, in car lots, between delivery yard and end of construction railroad. Unloading freight of all kinds for the Government or its agents, other than the contractor, at the end of the construction railroad and placing in ...
Page 13
... contracting officer may Order the contractor to suspend any work that may be subject to damage by climatic conditions. 4. Rights of way.-The site for the installation of machinery or the right of way for the works to be constructed ...
... contracting officer may Order the contractor to suspend any work that may be subject to damage by climatic conditions. 4. Rights of way.-The site for the installation of machinery or the right of way for the works to be constructed ...
Page 14
... contracting officer, plus 15 per cent for superintendence, general expense, and profit. The actual necessary cost will include all expenditures for material, labor, and supplies furnished by the contractor, and a reasonable allowance ...
... contracting officer, plus 15 per cent for superintendence, general expense, and profit. The actual necessary cost will include all expenditures for material, labor, and supplies furnished by the contractor, and a reasonable allowance ...
Page 16
... contractor will be required to place all con°rete around such machinery as is installed prior to completion of the dam. Half of the Power Penstocks on each side of the river will divert from the 30-foot diameter horizontal penstock ...
... contractor will be required to place all con°rete around such machinery as is installed prior to completion of the dam. Half of the Power Penstocks on each side of the river will divert from the 30-foot diameter horizontal penstock ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...