Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ... |
From inside the book
Results 1-5 of 22
Page
... Acceptance of cofferdams by Govern13 ment--------------------------- 13 44. Development of power prior to com13 pletion of dam------------------- 14 | Earthwork: 45. Stripping canyon walls of loose rock-- 14 46. Classification of ...
... Acceptance of cofferdams by Govern13 ment--------------------------- 13 44. Development of power prior to com13 pletion of dam------------------- 14 | Earthwork: 45. Stripping canyon walls of loose rock-- 14 46. Classification of ...
Page 24
... acceptance of the work under these speci. fications by the Government, such charge to also cover the contractor's proportionate part of the cost and expense of operation and administration of the town. In addition to such charge the ...
... acceptance of the work under these speci. fications by the Government, such charge to also cover the contractor's proportionate part of the cost and expense of operation and administration of the town. In addition to such charge the ...
Page 30
... Acceptance of cofferdams by Government.-After the upstream cofferdam, rock blanket in the river channel, the downstream cofferdam and rock barrier, and the rock protection on the two excavated slopes to bedrock have all been completed ...
... Acceptance of cofferdams by Government.-After the upstream cofferdam, rock blanket in the river channel, the downstream cofferdam and rock barrier, and the rock protection on the two excavated slopes to bedrock have all been completed ...
Page 31
... acceptance the contractor shall enlarge, repair, and maintain the accepted works as directed by the contracting officer, and payment, for any enlargement repairs, or replacements will be made to the contractor at the appropriate prices ...
... acceptance the contractor shall enlarge, repair, and maintain the accepted works as directed by the contracting officer, and payment, for any enlargement repairs, or replacements will be made to the contractor at the appropriate prices ...
Page 42
... acceptance of the feature of work of which they are a part. Any approved material placed in embankments that is lost before the date of the written acceptance described in paragraph 43, by floods or other action of the river, by ...
... acceptance of the feature of work of which they are a part. Any approved material placed in embankments that is lost before the date of the written acceptance described in paragraph 43, by floods or other action of the river, by ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...