... DEPARTMENT OF THE INTERIOR RAY LYMAN WILBUR, Secretary of A BUREAU of RECLAMATION 2. ELWOOD MEAD, Commissioner SPECIFICATIONS, SCHEDULE, AND DRAWINGS HOOVER DAM, POWER PLANT AND APPURTENANT WORKS BOULDER CANYON PROJECT ARIZONA ...
... DEPARTMENT OF THE INTERIOR RAY LYMAN WILBUR, Secretary of A BUREAU of RECLAMATION 2. ELWOOD MEAD, Commissioner SPECIFICATIONS, SCHEDULE, AND DRAWINGS HOOVER DAM, POWER PLANT AND APPURTENANT WORKS BOULDER CANYON PROJECT ARIZONA ...
Page
... DEPARTMENT of THE INTERIOR, BUREAU or; RECLAMATION, OFFICE of THE CommissionER, Washington, December 15, 1930. Memorandum for the Secretary. Herewith is transmitted specifications and schedule of drawings of Hoover Dam, power plant, and ...
... DEPARTMENT of THE INTERIOR, BUREAU or; RECLAMATION, OFFICE of THE CommissionER, Washington, December 15, 1930. Memorandum for the Secretary. Herewith is transmitted specifications and schedule of drawings of Hoover Dam, power plant, and ...
Page
... DEPARTMENT OF THE INTERIOR § \ ! BUREAL OF RECLA MATION try \ | BOULDER CANYON PROJECT or, W w § W w NOTE HO OVER DA M § exco Railroad and Highway to be DAM AND APPURTENANT WORKS . 5°N Constructed from Summif so LOCATION MAP S Damsije ...
... DEPARTMENT OF THE INTERIOR § \ ! BUREAL OF RECLA MATION try \ | BOULDER CANYON PROJECT or, W w § W w NOTE HO OVER DA M § exco Railroad and Highway to be DAM AND APPURTENANT WORKS . 5°N Constructed from Summif so LOCATION MAP S Damsije ...
Page
... DEPARTMENT OF THE INTERIOR E U REAU OF RECLA MATION EOUL DER CAN YON FROU ECT NOTES P Total Runoff 7.959,000 A.F. |O 20 | |0 |0 O. O \? IOW.OOO Ac. For | 217,000 AC.Ft Total Runoff (3,319,000 AC.Ft. Total Runoff 14 AC.Ft. Total Runoff ...
... DEPARTMENT OF THE INTERIOR E U REAU OF RECLA MATION EOUL DER CAN YON FROU ECT NOTES P Total Runoff 7.959,000 A.F. |O 20 | |0 |0 O. O \? IOW.OOO Ac. For | 217,000 AC.Ft Total Runoff (3,319,000 AC.Ft. Total Runoff 14 AC.Ft. Total Runoff ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...