adits, and shafts.

SCHEDULE-Continued Construction of Dam, Power Plant, and Appurtenant Works—Continued o Work or material Quantity and price Amount 77 | Laying metal pipe for highway | 10,000 pounds, at-------------------------------drains and culverts. (Words) - - - - - - - - - - - - - - - - - - ($---------- ) per pound------- $-----------78 Installing conduit lining castings- 9,570,000 pounds, at----------------------------(Words) * - - - - - s so * - - - - some as - - - ($----------) per pound-------|-------------79 || Installing plate-steel conduit 6,435,000 pounds, at ---------------------------linings for outlet works. - (Words) some o 'o - - - so som. * - - - as so me - - - ($----------) per pound-------|-------------80 Installing plate-steel conduit 13,915,000 pounds, at --------------------------linings for power penstocks. (Words) ------------------ ($---------- ) per pound-------|-------------81 | Installing structural steel, except | 17,875,000 pounds, at --------------------------bridges to intake towers. . (Words) - ------------------ ($---------- ) per pound-------|-------------82 | Installing structural steel in 577,500 pounds, at -----------------------------bridges to intake towers. (Words) am me - - - - - me so * - - - - am - - - - ($----------) per pound-------|-------------83 || Installing trash rack metal work- 2,340,800 pounds, at ---------------------------- (Words) “E - - - - - - * - - - - - - - - - - ($----------) per pound-------|-------------84 || Driving steel sheet piling for up- || 704,000 pounds, at ------------------------------ stream cofferdam. (Words) so some - - - - s so - - - - * * * - - - ($----------) per pound-------|-------------85 | Installing track rails------------ 413,000 pounds, at -----------------------------(Words) *-I------------------ ($---------- ) per pound-------|-------------86 Installing metal work in inclined 330,000 pounds, at -----------------------------flight elevator guide struc- (Words) UITe. - * - - - - * = to - - - - - so to *- - - ($----------)oper pound)------|-------------87 | Installing metal floor plates----- 132,000 pounds, at ------------------------------ - (Words) — — — — — — — — — — — — — — — — — — ($---------- ) per pound-------|-------------88 || Installing metal stairways------- 308,000 pounds, at ------------------------------ (Words) * - - - - - so o –- - - - - so * - - - ($----------) per pound -------|-------------89 | Furnishing and erecting steel ribs, 3,170,000 pounds, at ---------------------------Steel liner plates, and arch ring (Words) Segmental bars in tunnels, l------------------ ($---------- ) per pound -------|-------------

[graphic]

SCHEDULE-Continued

Construction of Dam, Power Plant, and Appurtenant Works—Continued

[graphic][subsumed][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][subsumed][merged small]
[blocks in formation]

Installing 50-foot by 50-foot Stoney gates and hoists.

Installing high-pressure hydraulically operated gates.

Installing cylinder gates and hoists in intake towers.

Installing needle valves--------

Installing traveling cranes------

Furnishing, installing, and operating cooling plant.

Installing electrical cable for resistance thermometers embedded in concrete.

Installing electrical metal conduit not larger than 1-inch diameter.

Installing electrical metal conduit larger than 1-inch diameter and not larger than 2%inch diameter.

Installing electrical metal conduit larger than 2%-inch diameter and not larger than 4inch diameter.

Installing electrical metal conduit larger than 4-inch diameter and not larger than 6inch diameter.

(Words) -- a- - or = * * = ** = ** = * * * * * * ($----------) per pound ------10, 340,000 pounds, at -----------(words) TTTTTTTTTT so so arm as as amo - some os = * * = * * * * * ($---------- ) per pound ------4,620,000 pounds, at ---------------------------(Words) == * * * * * = * * = = * = * * * * * ($----------) per pound ------4,070,000 pounds, at ---------------------------(Words) ams so me so am so me am o os so so, o so * * * * ($----------) per pound ------295,000 pounds, at -----------------------------(Words) * * * * * * * * * * * * = * * * * * ($----------) per pound ------Complete, for the lump sum of ------------------* = * * * * * * * * * * * * * * * * * * * = * * = * * * * * * * * * * * * * * *s dollars-(Words) 20,000 lin. ft., at -------------------------------(Words) * * * * * * * * * * = * * * * * = os ($----------) per lin. ft.-------75,000 lin. ft., at-------------------------------(Words) * = ** = * * * * * * * * * * * *m as ame ($----------) per lin. ft.-------60,000 lin. ft., at-------------------------------(Words) * * = * * * * * * * * = ** = = = = -s. ($----------) per lin. ft.-------2,000 lin. ft., at --------------------------------(Words) * * * * * * * * * * * = = = = = -e e-, ($----------) per lin. ft.-------500 lin. ft., at ------------------------- --------(Words) * * * * * * * - - - - - - - - - - - ft.-------

[merged small][ocr errors][merged small][merged small][merged small]

Construction of Dam, Power Plant, and Appurtenant Works—Continued

[graphic]

o Work or material Quantity and price Amount 101 || Installing fiber conduit---------- | 2,000 lin. ft., at --------------------------------- * > . - (Words) - - - - - - - - - - - - - - - - - - ($----------) per lin. ft.--------| $–----------102 || Installing metal sash windows | 75,000 sq. ft., at -------------------------------and partitions. - (Words) • * = = - * * * * * - - - - - - - - ($----------) per sq. ft.--------|-------------103 || Installing metal sash window | 120,000 pounds, at -----------------------------operators. -- (Words) - - - - - - - - - - - - - - - - - - ($----------) per pound-------|-------------104 || Installing metal swing doors----- 3,200 sq. ft., at --------------------------------(Words) - * * * * - - - - - as * * - - - - m ($----------) per sq. ft.--------|-------------105 || Installing metal rolling doors----| 500 sq. ft., at----------------------------------(Words) - - some s = ** - - - - s = - - - - - - (s----------) per sq. ft.--------|-------------106 || Installing wooden doors---------| 800 sq. ft., at----------------------------------- (Words) - * * * * - - - - - so s - - - - - = ($----------) per sq. ft.--------|-------------107 | Placing hollow clay tile walls and 2,000 sq. yds., at-------------------------------ceilings. - (Words) - * * * * - - - - some so so o - - - me o ($----------) per sq. yd-------|-------------108 || Placing ceramic tile walls and 250 sq. yds., at---------------------------------floors. - (Words) - * * * * *- - - - * * * *- - - -oo o me ($----------) per sq. yd-------|-------------109 || Installing plumbing fixtures and | 10,000 pounds, at-------------------------------hardware accessories. (Words) . I - - - - - - - - - - - - - - - - - - ($---------- ) per pound--------|-------------110 | Installing steel partitions-------- 10,000 pounds, at-------------------------------(Words) - -s o go - - - - - ame o os - - - - - as ($----------) per pound--------|-------------111 | Installing sheet-metal work------ 33,000 pounds, at-------------------------------- (Words) ------------------ ($---------- ) per pound--------|-------------112 || Placing copper expansion strips | 150,000 lin. ft., at------------------------------in contraction joints. (Words) - - - - - - - - - - - - - - - - - - ($---------- ) per lin. ft--------|-------------113 | Installing miscellaneous items of 231,000 pounds, at------------------------------(Words)

metal work.

Item
No.

Work or material

Amount

114

115

116

117

118

149

Transporting freight of all kinds on the construction railroad for the Government or its agents, other than the contractor, in less than car lots between delivery yard and end of construction railroad.

Transporting freight of all kinds on the construction railroad for the Government or its agents, other than the contractor, in car lots, between delivery yard and end of construction railroad.

Unloading freight of all kinds for the Government or its agents, other than the contractor, at the end of the construction railroad and placing in Government warehouse.

Transporting freight of all kinds for the Government or its agents, other than the contractor, between end of construction railroad, in less than car lots, or between Government warehouse, in any amount, and power house.

Transporting freight of all kinds for the Government or its agents, other than the contractor, between end of construction railroad and power house, in car lots.

Excavation: All classes, stripping
Arizona gravel deposits.

[ocr errors][ocr errors][merged small]

SCHEDULE –Continued
Construction of Dam, Power Plant, and Appurten” Works—Continued
-- Quantity and price
60,000 cwt., at ---------------------------------
(Words)
- - - - - - - - - - - - " " " " To “To ($----------) per cwt.----------
1,000 cars, at -----------------------------------
(Words)
= = a- - - - - * = * * * * * * * * * ($----------) per car----------
60,000 cwt., at ---------------------------------
- (Words)
am me am. * - - - ess -s some me • *- - - * * = ($----------) per cwt.----------
60,000 cwt., at ---------------------------------
(Words)
* * - - - - - - - - - - - - - - - * ($----------) per cwt.---------
600 cars, at ------------------- • *-* = o os o os- - - - * * * * * , - - -
(Words)
* * * * - * * * * * * * - - - - some smos ($----------) per car----------
650,000 cu. yds. at-----------------------
(Words)
* - - - - * * * - - - - * *m. –($---------) per cu. yd.------

Total for Schedule.------

* = * * : *- - - - * * *

* * * * * * * * * * = - -

STATEMENT OF EQUIPMENT

Each bidder shall fill in the following blanks stating the equipment with which it is proposed to do the work: Excavating equipment: Mucking machines--------------------------------------------------------------------------Power shovels---- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Dragline excavators-- -----------------------------------------------------------------------Transporting equipment: Cableways-- --------- so am some on an am m. os am, mos. o so so as so m some so son was ame so me so * = ** = * * * * * = * * * * * * = ** = asso s so so, so am - so so o so, mos = ** = * * *se so so on some so so, o me o sme Tramways------------------ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —

Locomotives--------------------------------------------------------------------------------

Drilling equipment------------------------------------------------------ ------------------- ------Other equipment----------------------------------------------------------------------------- to go to E to so.

* * * * * * * *m, so an ome on so am a sm = m, so on mo m so are me = * * * * me m = * * * = * * * * * * * * * * * * * * * * * * * * * * * * * = * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * = = - - - - - - - - - - -, * = * * * * * = * * * * = * * * * * * * * * * = * * * * * * * * * * * * = * * * * * = ** = = * * * * * - - - - - = * * * * * * * * * * * * * * * * * * * * *

* * * * * * = * * * = - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - * = * ~ * * = = * * * * * * * * * * * *

29919—30—2 (11)