Page 35
... Work Within Contract Time . Liquidated damages in the amount set forth in the following table will be charged for each day of delay until the work is complete . Charge for liquidated damages for each day of delay Original 35 108.07.
... Work Within Contract Time . Liquidated damages in the amount set forth in the following table will be charged for each day of delay until the work is complete . Charge for liquidated damages for each day of delay Original 35 108.07.
Page 82
... Table 212.04 . Table 212.04 Specified Course Selected Embankment Subgrade Bases & Subbases Bituminous Concrete Surfacing Approximate Sublot Size Square Yards Square Meters 1500 1254 1000 836 1000 836 400 334 If an individual test result ...
... Table 212.04 . Table 212.04 Specified Course Selected Embankment Subgrade Bases & Subbases Bituminous Concrete Surfacing Approximate Sublot Size Square Yards Square Meters 1500 1254 1000 836 1000 836 400 334 If an individual test result ...
Page 103
... tables and figures referenced herein are included at the end of this section . Materials 401.02 Composition of ... Table 703-4 . ( 2 ) The percentage of bituminous material to be added , based on the total weight of mixture . ( 3 ) ...
... tables and figures referenced herein are included at the end of this section . Materials 401.02 Composition of ... Table 703-4 . ( 2 ) The percentage of bituminous material to be added , based on the total weight of mixture . ( 3 ) ...
Page 114
... table ; BASE TEMPERATURE LIMITATIONS Compacted Thickness Surface Course Sub - Surface Courses < 0.10 ' ( 30 mm ) 55 ° F ( 13 t ° c ) 55 ° F ( 13 t ° c ) 45 ° F ( 7 t ° c ) 35 ° F ( 2 t ° c ) 0.21 ' to 0.35 ' ( 64 mm ) to ( 107 mm ) 35 ...
... table ; BASE TEMPERATURE LIMITATIONS Compacted Thickness Surface Course Sub - Surface Courses < 0.10 ' ( 30 mm ) 55 ° F ( 13 t ° c ) 55 ° F ( 13 t ° c ) 45 ° F ( 7 t ° c ) 35 ° F ( 2 t ° c ) 0.21 ' to 0.35 ' ( 64 mm ) to ( 107 mm ) 35 ...
Page 116
... Table 401-2 . The average plot gives a reliable indication as to whether the average level of the production process is reasonably close to the target value . The range plot gives a reliable indication as to whether the variabil- ity of ...
... Table 401-2 . The average plot gives a reliable indication as to whether the average level of the production process is reasonably close to the target value . The range plot gives a reliable indication as to whether the variabil- ity of ...
Contents
1 | |
6 | |
9 | |
10 | |
15 | |
17 | |
32 | |
37 | |
45 | |
49 | |
61 | |
63 | |
73 | |
74 | |
77 | |
80 | |
81 | |
83 | |
85 | |
103 | |
155 | |
179 | |
267 | |
302 | |
303 | |
304 | |
305 | |
306 | |
307 | |
308 | |
309 | |
310 | |
311 | |
334 | |
339 | |
341 | |
344 | |
346 | |
349 | |
350 | |
360 | |
363 | |
371 | |
381 | |
385 | |
386 | |
389 | |
397 | |
401 | |
402 | |
403 | |
406 | |
411 | |
412 | |
413 | |
414 | |
423 | |
457 | |
Common terms and phrases
accordance with subsection aggregate aluminum applied approved areas asphalt ASTM backfill Basis of Payment batch bid schedule bituminous material bituminous surface treatment bolts cleaned coat compacted compressive strength concrete Construction Requirements contract price contract unit price Contracting Officer Contractor Cubic yard curb curing designated diameter Emulsified Emulsified asphalt Engineer equipment excavation expansion joints falsework feet finished forms furnished Gallon grade grout holes inch joints layer less Linear foot load masonry ment metal Method of Measurement minimum mixer mixing mixture mortar operations paid paint pavement pay factor Pay item Pay unit percent permitted piles pipe plans plant portland cement precast Precast concrete prestressed concrete prestressing price and payment protected railing reasonably close conformity removed requirements of AASHTO requirements of subsection rivets samples Section shown special provisions specific gravity specified square yard stone Structural steel subgrade surface temperature thickness timber tion Unless otherwise weight welds width
Popular passages
Page 437 - The Contractor warrants that no person or selling agency has been employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee...
Page 432 - Except as otherwise provided in this contract, any dispute concerning a question of fact arising under this contract which is not disposed of by agreement shall be decided by the Contracting Officer, who shall reduce his decision to writing and mail or otherwise furnish a copy thereof to the Contractor.
Page 432 - ... representative or board is alleged: Provided, however, That any such decision shall be final and conclusive unless the same is fraudulent or capricious or arbitrary or so grossly erroneous as necessarily to imply bad faith, or is not supported by substantial evidence.
Page 440 - UTILIZATION OF SMALL BUSINESS CONCERNS (a) It is the policy of the Government as declared by the Congress that a fair proportion of the purchases and contracts for supplies and services for the Government be placed with small business concerns.
Page 440 - September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for noncompliance; Provided, however, That in the event the contractor becomes involved in or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the contracting agency, the contractor...
Page 439 - (5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
Page 443 - Contractor in the event of failure of the Contractor and the Contracting Officer to agree upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this clause...
Page 448 - ENTERPRISES (a) It is the policy of the Government that minority business enterprises shall have the maximum practicable opportunity to participate in the performance of Government contracts.
Page 453 - The provisions of paragraphs (b), (c), (d), and (e) of this clause do not apply to openings which the contractor proposes to fill from within his own organization or to fill pursuant to a customary and traditional employer-union hiring arrangement. This exclusion does not apply to a particular opening once an employer decides to consider applicants outside of his own organization or employer-union arrangement for that opening. (h) As used in this clause: (1) "All suitable employment openings...
Page 30 - The delay in the completion of the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor...