Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. FP-74 |
From inside the book
Results 1-5 of 36
Page 37
... linear feet ( 30.48 m ) . All items which are measured by the linear foot , such as pipe cul- verts , guardrail , underdrains , etc. , will be measured parallel to the base or foundation upon which such structures are placed , unless ...
... linear feet ( 30.48 m ) . All items which are measured by the linear foot , such as pipe cul- verts , guardrail , underdrains , etc. , will be measured parallel to the base or foundation upon which such structures are placed , unless ...
Page 47
... Linear basis . — When a linear unit quantity is shown on the bid schedule , the length will be measured along the construction centerline in stations or miles . Measurement of hedge rows removed will be made horizontally in units of 100 ...
... Linear basis . — When a linear unit quantity is shown on the bid schedule , the length will be measured along the construction centerline in stations or miles . Measurement of hedge rows removed will be made horizontally in units of 100 ...
Page 48
... Linear basis . - When linear quantities are shown in the schedule , the quantities will be paid for at the contract unit price such items . ( d ) Individual unit basis . - When individual unit quantities shown on the bid schedule , the ...
... Linear basis . - When linear quantities are shown in the schedule , the quantities will be paid for at the contract unit price such items . ( d ) Individual unit basis . - When individual unit quantities shown on the bid schedule , the ...
Page 51
... linear feet , computed by multiplying the number of pipe units removed by the commercial lengths of each pipe unit ( exclusive of end connections ) or by measuring in place prior to removal , if specified . Whenever the bid schedule ...
... linear feet , computed by multiplying the number of pipe units removed by the commercial lengths of each pipe unit ( exclusive of end connections ) or by measuring in place prior to removal , if specified . Whenever the bid schedule ...
Page 61
... linear basis - When it is specified that an item of excavation is to be measured and paid for on a linear basis , the actual length will be measured in the units specified in the contract . ( f ) Measurement of excavation items on a ...
... linear basis - When it is specified that an item of excavation is to be measured and paid for on a linear basis , the actual length will be measured in the units specified in the contract . ( f ) Measurement of excavation items on a ...
Contents
1 | |
6 | |
9 | |
10 | |
15 | |
17 | |
37 | |
45 | |
49 | |
61 | |
63 | |
73 | |
74 | |
77 | |
80 | |
81 | |
83 | |
85 | |
93 | |
103 | |
155 | |
179 | |
267 | |
302 | |
303 | |
304 | |
305 | |
306 | |
307 | |
308 | |
309 | |
310 | |
339 | |
340 | |
343 | |
345 | |
346 | |
350 | |
361 | |
363 | |
365 | |
374 | |
381 | |
385 | |
387 | |
391 | |
397 | |
401 | |
402 | |
406 | |
411 | |
412 | |
413 | |
414 | |
425 | |
457 | |
Common terms and phrases
accordance with subsection adjusted aluminum applied approved areas ASTM backfill Basis of Payment batch bid schedule bituminous material bituminous surface treatment bolts cleaned coat compacted complete in place compressive strength Construction Requirements contract price contract unit price Contractor crete Cubic yard curb curing designated device diameter Emulsified asphalt Engineer equipment excavation expansion joints falsework feet finishing forms furnished Gallon grade grout holes inch joints layer length less Linear foot load masonry ment metal Method of Measurement minimum mixer mixing mortar operations paid paint pavement pay factor Pay item Pay unit percent permitted pipe plans plant plates portland cement precast Precast concrete prestressed concrete price and payment railing reasonably close conformity reinforcing steel removed requirements of AASHTO requirements of subsection rivets samples seal Section shown special provisions specific gravity specified square yard stockpiled stone Structural steel subgrade surface temperature thickness timber tion unless otherwise weight welds width
Popular passages
Page 437 - The Contractor warrants that no person or selling agency has been employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee...
Page 432 - Except as otherwise provided in this contract, any dispute concerning a question of fact arising under this contract which is not disposed of by agreement shall be decided by the Contracting Officer, who shall reduce his decision to writing and mail or otherwise furnish a copy thereof to the Contractor.
Page 432 - ... representative or board is alleged: Provided, however, That any such decision shall be final and conclusive unless the same is fraudulent or capricious or arbitrary or so grossly erroneous as necessarily to imply bad faith, or is not supported by substantial evidence.
Page 440 - UTILIZATION OF SMALL BUSINESS CONCERNS (a) It is the policy of the Government as declared by the Congress that a fair proportion of the purchases and contracts for supplies and services for the Government be placed with small business concerns.
Page 440 - September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for noncompliance; Provided, however, That in the event the contractor becomes involved in or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the contracting agency, the contractor...
Page 439 - (5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
Page 443 - Contractor in the event of failure of the Contractor and the Contracting Officer to agree upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this clause...
Page 448 - ENTERPRISES (a) It is the policy of the Government that minority business enterprises shall have the maximum practicable opportunity to participate in the performance of Government contracts.
Page 453 - The provisions of paragraphs (b), (c), (d), and (e) of this clause do not apply to openings which the contractor proposes to fill from within his own organization or to fill pursuant to a customary and traditional employer-union hiring arrangement. This exclusion does not apply to a particular opening once an employer decides to consider applicants outside of his own organization or employer-union arrangement for that opening. (h) As used in this clause: (1) "All suitable employment openings...
Page 30 - The delay in the completion of the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor...