(b) Forms.-If shown on the plans, forms of a type satisfactory to the Engineer shall be staked securely into position at the correct line and elevation. Other approved equipment and methods may be used.

(c) Placing mixture.—The mixture shall be placed on the prepared bed only when the bed is sufficiently dry and weather conditions are suitable. The mixture shall be placed in one or more courses of uniform thickness as shown on the plans. Each course shall be smoothed by raking or screeding and shall be thoroughly compacted by rolling with a hand-operated roller weighing not less than 300 (136 kg) pounds or with a small power roller of a type satisfactory to the Engineer. Areas that cannot be reached with rollers may be compacted with hand tampers. After compaction, the surfacing shall be of the nominal thickness and cross-section shown on the plans, shall be smooth and even, and of a dense and uniform texture.

622.08 Concrete Paving. Concrete paving shall be class A, plain or reinforced as shown by the plans, conforming to applicable subsections of Sections 552 and 554.

622.09 Finishing Work. For all types of paved waterway, any forms used shall be removed and necessary repairs made to edges of the waterway. The adjacent slopes and shoulders shall be shaped and compacted to the required cross section.

Method of Measurement

622.10 The quantities to be paid for will be the number of square yards, surface measurement, of paved waterway of the several kinds, completed and accepted.

Basis of Payment

622.11 The quantities, determined as provided above, will be paid for at the contract price per unit of measurement, respectively, for each of the particular pay items listed below that is shown in the bid schedule, which prices and payment will be full compensation for the work prescribed in this section, including excavation and backfill. Payment will be made under:

[blocks in formation]

Section 623.-MONUMENTS, MARKERS, AND

GUIDE POSTS

Description

623.01 This work shall consist of right-of-way monuments, maintenance marker posts, culvert marker posts, guide posts, and similar monuments or posts furnished and installed in reasonably close conformity with these specifications and with the sizes, dimensions and design at the locations shown on the plans or as directed by the Engineer.

Materials

623.02 Materials shown on the plans or in the special provisions shall conform to the requirements specified in the following sections or subsections:

[blocks in formation]

Metal, paint, and warning reflectors, if required, shall conform to the requirements shown on the plans or in the special provisions.

For concrete monuments, markers and posts supplied by an established commercial manufacturer, whose capability of producing specification monuments has been well established by both testing and performance, the Contractor may request the Engineer's approval of the units without sampling and testing. Written approval shall be obtained prior to installation of the units on the project.

Construction Requirements

623.03 Fabrication and installation of monuments and posts shall be as shown on the plans or in the special provisions shall include attaching warning reflectors and the painting of posts if required. Each monument and post shall be set accurately at the required location and elevation and in such manner as to insure its being held firmly in place.

Method of Measurement

623.04 The quantities to be paid for will be the actual number of monuments and posts of the types shown in the bid schedule, furnished, placed, and accepted.

Basis of Payment

623.05 The quantities, determined as provided above, will be paid for at the contract price per unit of measurement, respectively, for each of the particular pay items listed below that is shown in the bid schedule, which prices and payment shall be full compensation for the work prescribed in this section.

Payment will be made under:

[blocks in formation]

624.01 This work shall consist of topsoil furnished, transported, and spread, or topsoil removed from designated stockpiles, hauled, and spread, in reasonably close conformity with these specifications at the locations shown on the plans or as designated by the Engineer.

Materials

624.02 Materials. Materials shall meet the requirements specified in the following subsection of Section 700-Materials.

Topsoil

Construction Requirements

713.01

624.03 Topsoil Furnished by the Contractor. The Contractor shall notify the Engineer at least 5 days before he intends to start topsoil stripping operations.

624.04 Placing. Whenever slope areas to be topsoiled are steeper than 3:1 these slopes shall be disked or scarified to the depths indicated on the plans prior to placing topsoil. After the Engineer has approved the graded areas, topsoil shall be spread to a depth which, after settlement, will provide the nominal depth shown on the plans. Spreading shall not be done when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work. The roadway surfaces shall be kept clean during hauling and spreading operations.

After spreading has been completed, large clods, stones larger than 2 inches (50.8 mm) and any roots, stumps, and other litter shall be raked up and removed and disposed of at an approved location.

Method of Measurement

624.05 The quantities to be paid for will be the number of cubic yards of topsoil complete in place and accepted. Topsoil furnished by the Contractor will be measured in the vehicles at the point of delivery. Topsoil furnished from designated stockpiles will be measured in the original position.

Basis of Payment

624.06 The quantities, determined as provided above, will be paid for at the contract unit price respectively, for each of the particular pay items listed below that is shown in the bid schedule, which prices and payment will be full compensation for furnishing, when so required, and placing all material, including all labor, equipment, tools, and incidentals necessary to complete the work prescribed in this section, except that when provided for in the special provisions, payment for overhaul of topsoil from designated stockpiles will be made in accordance with Section 205. If not otherwise provided, preparation of areas to be topsoiled will be included for payment under the work of this section.

[blocks in formation]

Section 625.—TURF ESTABLISHMENT

Description

625.01 This work shall consist of soil preparation, seeding, fertilizing, liming if required, and mulching on all areas designated for turf establishment as shown on the plans or where directed by the Engineer in reasonably close conformity with these specifications.

Materials

Materials shall meet the requirements specified in the following subsections of Section 700-Materials:

[blocks in formation]

625.03 The Contractor shall carry out erosion control items of work such as "Turf Establishment" as soon as he has satisfactorily completed a unit or portion of the project, such as a structure, an interchange or a section of road or pavement for partial acceptance as provided under Section 105.16.

(a) Soil preparation.-All areas to be seeded shall be cultivated to provide a reasonably firm, but friable seedbed. Depth of cultivation shall be as shown on the plans unless otherwise directed by the Engineer. On slopes steeper than 3.1, depth of cultivation may be reduced as directed. All areas to be seeded shall meet the specified finish grades, be free of any weed or plant growth, stones of at least two inches (50.8 mm) in diameter or larger, or other debris. Limestone, if required, shall be applied uniformly either prior to or during soil preparation, and shall be incorporated into the soil surface to the depth shown on the plans. The application of limestone after soil preparation has been completed shall be only on approval of the Engineer.

(b) Seeding seasons.-The normal seasonal dates for seeding shall be as shown on the plans or designated in the special provisions. Seeding shall not be done during windy weather or when the ground is excessively wet, frozen or otherwise untillable.

(c) Application methods.-Seed, fertilizer, limestone and mulch material may be placed by the following methods: