and if the nature of the required product necessitates limiting the grant of a waiver to a product produced at the same plant in which the product previously acquired or tested was produced, add the following paragraph (e) to the basic provision:

(e) At the discretion of the Contracting Officer, the requirements for furnishing bid samples may be waived for a bidder if (1) the bid states that the offered product is the same as a product offered by the bidder to the Officer shall designate the contracting office or an alternate activity or office] on a previous acquisition, (2) the Contracting Officer determines that the previously offered product was accepted or tested and found to comply with specification and other requirements for technical acceptability conforming in every material respect with those of this solicitation, and (3) the product offered under this solicitation will be produced under a resulting contract at the same plant in which the previously acquired or tested product was produced.

[as appropriate, the Contracting

52.214-21 Descriptive Literature.

As prescribed in 14.201-6(p)(1), insert the following provision in invitations for bids if (a) descriptive literature is required to evaluate the technical acceptability of an offered product and (b) the required information will not be readily available unless it is submitted by bidders:

DESCRIPTIVE LITERATURE (APR 1984)

(a) Descriptive literature means information (e.g., cuts, illustrations, drawings, and brochures) that is submitted as part of a bid. Descriptive literature is required to establish, for the purpose of evaluation and award, details of the product offered that are specified elsewhere in the solicitation and pertain to significant elements such as (1) design; (2) materials; (3) components; (4) performance characteristics; and (5) methods of manufacture, assembly, construction, or operation. The term includes only information required to determine the technical acceptability of the offered product. It does not include other information such as that used in determining the responsibility of a prospective Contractor or for operating or maintaining equipment.

(b) Descriptive literature, required elsewhere in this solicitation, must be (1) identifled to show the item(s) of the offer to which it applies and (2) received by the time specified in this solicitation for receipt of bids. Failure to submit descriptive literature on time will require rejection of the bid, except that late descriptive literature sent by mail

may be considered under the Late Submissions, Modifications, and Withdrawals of Bids provision of this solicitation.

(c) The failure of descriptive literature to show that the product offered conforms to the requirements of this solicitation will require rejection of the bid.

(End of provision)

Alternate I (APR 1984). If the possibility exists that the contracting officer may waive the requirement for furnishing descriptive literature for a bidder offering a previously supplied product that meets specification requirements of the current solicitation, add the following paragraphs (d) and (e).

(d) At the discretion of the Contracting Officer, the requirement for furnishing descriptive literature under this solicitation may be waived for any bidder that makes an affirmative representation in subparagraph (d)(1) below, if the Contracting Officer determines that the product supplied by the bidder under a prior contract meets the requirements of this solicitation.

(1) The bidder represents that it has, □ has not [check applicable box] supplied a product to the [as appropriate, the Contracting Officer shall designate the contracting office or an alternate activity or office] under a prior contract that is the same as the product offered under this solicitation for which descriptive literature is required.

(2) If the bidder checked has in paragraph (d)(1) above, and seeks a waiver of the requirement for submitting descriptive literature, the bidder must fill in the following information:

Prior contract number

Date of prior contract

Contract line item number of product supplied

Name and address of government activity to which delivery was made

Date of final delivery of product supplied

(e) Bidders must submit bids on the basis of required descriptive literature or on the basis of a previously supplied product under paragraph (d) above. A bidder submitting a bid on one of these two bases may not elect to have its bid considered on the alternative basis after the time specified for receipt of bids. A bidder's request for a waiver under paragraph (d) above will be disregarded if that bidder has submitted the descriptive literature required under this solicitation.

52.214-22 Evaluation of Bids for Multiple Awards.

As prescribed in 14.201-6(q), insert the following provision:

EVALUATION OF BIDS FOR MULTIPLE AWARDS (MAR 1990)

In addition to other factors, bids will be evaluated on the basis of advantages and disadvantages to the Government that might result from making more than one award (multiple awards). It is assumed, for the purpose of evaluating bids, that $500 would be the administrative cost to the Government for issuing and administering each contract awarded under this solicitation, and individual awards will be for the items or combinations of items that result in the lowest aggregate cost to the Government, including the assumed administrative costs.

(End of provision)

[48 FR 42478, Sept. 19, 1983, as amended at 55 FR 3887, Feb. 5, 1990]

52.214-23

Late Submissions, Modifications, and Withdrawals of Technical Proposals Under Two-Step Sealed Bidding.

As prescribed in 14.201-6(r), insert the following provision:

LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF TECHNICAL PROPOSALS UNDER TWO-STEP SEALED BIDDING (AUG 1996)

(a) Any technical proposal under step one of two-step sealed bidding received at the office designated in this solicitation after the exact time specified for receipt will not be considered unless it is received before the invitation for bids in step two is issued and it

(1) Was sent by registered or certified mail not later than the fifth calendar day before the date specified for receipt of technical proposals (e.g., technical proposal submitted in response to a solicitation requiring receipt of technical proposals by the 20th of the month must have been mailed by the 15th);

(2) Was sent (1) by mail, or (ii) if authorized, by telegram (including mailgram) or via facsimile, and it is determined by the Government that the late receipt was due solely to mishandling by the Government after receipt at the Government installation;

(3) Was sent by U.S. Postal Service Express Mail Next Day Service-Post Office To Addressee, not later than 5:00 p.m. at the place of mailing 2 working days prior to the date specified for receipt of technical proposals. The term working days excludes weekends and U.S. Federal holidays;

(4) Was transmitted through an electronic commerce method authorized by the solicitation and was received by the Government not later than 5:00 p.m. one working day

prior to the date specified for receipt of technical proposals; or

(5) Is the only technical proposal received. (b) Any modification of a technical proposal is subject to the same conditions as in paragraph (a) of this provision, except that (1) the use of a telegram (or mailgram) is authorized, and (2) if the solicitation authorizes facsimile bids, technical proposals may be modified via facsimile received at any time before the exact time set for receipt of bids under step two, subject to the conditions specified in the provision entitled Facsimile Bids.

(c) Technical proposals may be withdrawn by written notice or telegram (including mailgram) received at any time before the exact time set for receipt of bids under step two. If the solicitation authorizes facsimile bids, technical proposals may be withdrawn via facsimile received at any time before the exact time set for receipt of bids under step two, subject to the conditions specified in the provision entitled Facsimile Bids. Technical proposals may be withdrawn in person by the submitter or the submitter's authorized representative if, before the exact time set for receipt of bids in step two, the identity of the person requesting withdrawal is established and that person signs a receipt for the technical proposal.

or

(d) The only acceptable evidence to establish the date of mailing of a late technical proposal, modification, or withdrawal of a technical proposal sent either by registered or certified mail is the U.S. or Canadian Postal Service postmark both on the envelope or wrapper and on the original receipt from the U.S. or Canadian Postal Service. Both postmarks must show a legible date, or the technical proposal, modification, withdrawal of technical proposal shall be processed as if mailed late. Postmark means a printed, stamped, or otherwise placed impression (exclusive of a postage meter machine impression) that is readily identifiable without further action as having been supplied and affixed by employees of the U.S. or Canadian Postal Service on the date of mailing. Therefore, submitters of technical proposals should request the postal clerk to place a legible hand cancellation bull's-eye postmark on both the receipt and the envelope or wrapper.

(e) The only acceptable evidence to establish the time of receipt at the Government installation is the time/date stamp of that installation on the proposal wrapper or other documentary evidence of receipt maintained by the installation.

(f) The only acceptable evidence to establish the date of mailing of a late technical proposal, modification, or withdrawal sent by U.S. Postal Service Express Mail Next Day Service-Post Office to Addressee is the date entered by the post office receiving clerk on the Express Mail Next Day Service

Post Office to Addressee label and the postmark on the envelope or wrapper and on the original receipt from the U.S. Postal Service. Postmark has the same meaning as defined in paragraph (d) of this provision, excluding postmarks of the Canadian Postal Service. Therefore, submitters of technical proposals should request the postal clerk to place a legible hand cancellation bull's-eye postmark on both the receipt and the envelope or wrapper.

(g) If an emergency or unanticipated event interrupts normal Government processes so that technical proposals cannot be received at the office designated for receipt of technical proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of technical proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office.

(End of provision)

[54 FR 48991, Nov. 28, 1989, as amended at 60 FR 34740, July 3, 1995; 61 FR 31620, June 20, 1996]

52.214-24 Multiple Technical Proposals.

As prescribed in 14.201-6(s), insert the following provision:

MULTIPLE TECHNICAL PROPOSALS (APR 1984) In the first step of this two-step acquisition, solicited sources are encouraged to submit multiple technical proposals presenting different basic approaches. Each technical proposal submitted will be separately evaluated and the submitter will be notified as to its acceptability.

(End of provision)

[48 FR 42478, Sept. 19, 1983, as amended at 50 FR 1747, Jan. 11, 1985; 50 FR 52429, Dec. 23, 1985]

52.214-25 Step Two of Two-Step Sealed Bidding.

As prescribed in 14.201–6(t), insert the following provision:

STEP TWO OF TWO-STEP SEALED BIDDING (APR 1985)

(a) This invitation for bids is issued to initiate step two of two-step sealed bidding

under subpart 14.5 of the Federal Acquisition Regulation.

(b) The only bids that the Contracting Officer may consider for award of a contract are those received from bidders that have submitted acceptable technical proposals in step one of this acquisition under [the Contracting Officer shall insert the identification of the step-one request for technical proposals].

(c) Any bidder that has submitted multiple technical proposals in step one of this acquisition may submit a separate bid on each technical proposal that was determined to be acceptable to the Government.

(End of provision)

[48 FR 42478, Sept. 19, 1983, as amended at 50 FR 1747, Jan. 11, 1985; 50 FR 52429, Dec. 23, 1985]

52.214-26 Audit and Records-Sealed Bidding.

As prescribed in 14.201-7(a), insert the following clause:

AUDIT AND RECORDS SEALED BIDDING (OCT 1995)

(a) As used in this clause, records includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.

(b) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor's records, including computations and projections, related to

(1) The proposal for the modification; (2) The discussions conducted on the proposal(s), including those related to negotiating;

(3) Pricing of the modification; or
(4) Performance of the modification.

(c) Comptroller General. In the case of pricing any modification, the Comptroller General of the United States, or an authorized representative, shall have the same rights as specified in paragraph (b) of this clause.

(d) Availability. The Contractor shall make available at its office at all reasonable times the materials described in paragraph (b) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract, or for any other period specified in subpart 4.7 of the Federal Acquisition Regulation (FAR). FAR Subpart 4.7, Contractor Records Retention, in effect on

the data of this contract, is incorporated by reference in its entirety and made a part of this contract.

(1) If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

(2) Records pertaining to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to the performance of this contract shall be made available until disposition of such appeals, litigation, or claims.

(e) The Contractor shall insert a clause containing all the provisions of this clause, including this paragraph (e), in all subcontracts expected to exceed the threshold in FAR 15.804-2(a)(1) for submission of cost or pricing data.

(End of clause)

[60 FR 42651, Aug. 16, 1995; 60 FR 44548, Aug. 28, 1995]

52.214-27 Price Reduction for Defective Cost or Pricing Data-Modifications Sealed Bidding.

As prescribed in 14.201-7(b), insert the following clause:

PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA-MODIFICATIONS-SEALED

BIDDING (OCT 1995)

(a) This clause shall become operative only for any modification to this contract involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for the submission of cost or pricing data at FAR 15.804-2(a)(1), except that this clause does not apply to a modification if an exception under FAR 15.804-1 applies.

(b) If any price, including profit, negotiated in connection with any modification under this clause, was increased by any significant amount because (1) the Contractor or a subcontractor furnished cost or pricing data that were not complete, accurate, and current as certified in its Certificate of Current Cost or Pricing Data, (2) a subcontractor or prospective subcontractor furnished the Contractor cost or pricing data that were not complete, accurate, and current as certified in the Contractor's Certificate of Current Cost or Pricing Data, or (3) any of these parties furnished data of any description that were not accurate, the price shall be reduced accordingly and the contract shall be modified to reflect the reduction. This right to a price reduction is limited to that resulting from defects in data relating to modifications for which this clause becomes operative under paragraph (a) above.

(c) Any reduction in the contract price under paragraph (b) above due to defective data from a prospective subcontractor that was not subsequently awarded the subcontract shall be limited to the amount, plus applicable overhead and profit markup, by which (1) the actual subcontract or (2) the actual cost to the Contractor, if there was no subcontract, was less than the prospective subcontract cost estimate submitted by the Contractor; provided, that the actual subcontract price was not itself affected by defective cost or pricing data.

(d)(1) If the Contracting Officer determines under paragraph (b) of this clause that a price or cost reduction should be made, the Contractor agrees not to raise the following matters as a defense

(i) The Contractor or subcontractor was a sole source supplier or otherwise was in a superior bargaining position and thus the price of the contract would not have been modified even if accurate, complete, and current cost or pricing data had been submitted;

(ii) The Contracting Officer should have known that the cost or pricing data in issue were defective even though the Contractor or subcontractor took no affirmative action to bring the character of the data to the attention of the Contracting Officer;

(iii) The contract was based on an agreement about the total cost of the contract and there was no agreement about the cost of each item procured under the contract; or

(iv) The Contractor or subcontractor did not submit a Certificate of Current Cost or Pricing Data.

(2)(i) Except as prohibited by subdivision (d)(2)(ii) of this clause, an offset in an amount determined appropriate by the Contracting Officer based upon the facts shall be allowed against the amount of a contract price reduction if

(A) The Contractor certifies to the Contracting Officer that, to the best of the Contractor's knowledge and belief, the Contractor is entitled to the offset in the amount requested; and

(B) The Contractor proves that the cost or pricing data were available before the date of agreement on the price of the contract (or price of the modification) and that the data were not submitted before such date.

(ii) An offset shall not be allowed if

(A) The understated data was known by the Contractor to be understated when the Certificate of Current Cost or Pricing Data was signed; or

(B) The Government proves that the facts demonstrate that the contract price would not have increased in the amount to be offset even if the available data had been submitted before the date of agreement on price.

(e) If any reduction in the contract price under this clause reduces the price of items for which payment was made prior to the date of the modification reflecting the price

reduction, the Contractor shall be liable to and shall pay the United States at the time such overpayment is repaid

(1) Simple interest on the amount of such overpayment to be computed from the date(s) of overpayment to the Contractor to the date the Government is repaid by the Contractor at the applicable underpayment rate effective for each quarter prescribed by the Secretary of the Treasury under 26 U.S.C. 6621(a)(2); and

(2) A penalty equal to the amount of the overpayment, if the Contractor or subcontractor knowingly submitted cost or pricing data which were incomplete, inaccurate, or noncurrent.

[blocks in formation]

As prescribed in 14.201-7(c), insert the following clause:

SUBCONTRACTOR COST OR PRICING DATA— MODIFICATIONS-SEALED BIDDING (OCT 1995) (a) The requirements of paragraphs (b) and (c) of this clause shall (1) become operative only for any modification to this contract involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for submission of cost or pricing data at (FAR) 48 CFR 15.804-2(a)(1), and (2) be limited to such modifications.

(b) Before awarding any subcontract expected to exceed the threshold for submission of cost or pricing data at FAR 15.8042(a)(1), on the date of agreement on price or the date of award, whichever is later; or before pricing any subcontract modifications involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for submission of cost or pricing data at FAR 15.8042(a)(1), the Contractor shall require the subcontractor to submit cost or pricing data (actually or by specific identification in writing), unless an exception under FAR 15.804-1 applies.

(c) The Contractor shall require the subcontractor to certify in substantially the form prescribed in subsection 15.804-4 of the Federal Acquisition Regulation that, to the best of its knowledge and belief, the data submitted under paragraph (b) above were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in each subcontract that, when entered into, exceeds the threshold for submission of cost or pricing data at FAR 15.8042(a)(1).

(End of clause)

[48 FR 42478, Sept. 19, 1983, as amended at 50 FR 1747, Jan. 11, 1985; 50 FR 52429, Dec. 23, 1985; 56 FR 67415, Dec. 30, 1991; 59 FR 62499, Dec. 5, 1994; 60 FR 48218, Sept. 18, 1995]

52.214-29 Order

Sealed Bidding.

[blocks in formation]
[blocks in formation]
« PreviousContinue »