not have been incurred had the other cost not been incurred.

(2) Expressly unallowable cost. A particular item or type of cost which, under the express provisions of an applicable law, regulation, or contract, is specifically named and stated to be unallowable.

(3) Indirect cost. Any cost not directly identified with a single final cost objective but identified with two or more final cost objectives or with at least one intermediate cost objective.

(4) Unallowable cost. Any cost which, under the provisions of any pertinent law, regulation, or contract, cannot be included in prices, cost reimbursements, or settlements under a Government contract to which it is allocable.

(b) The following modifications of definitions set forth in Part 400 of this chapter are applicable to this standard:

None.

§ 405.40 Fundamental requirements.

(a) Costs expressly unallowable or mutually agreed to be unallowable, including costs mutually agreed to be unallowable directly associated costs, shall be identified and excluded from any billing, claim, or proposal applicable to a Government contract.

(b) Costs which specifically become designated as unallowable as a result of a written decision furnished by a contracting officer pursuant to contract disputes procedures shall be identified if included in or used in the computation of any billing, claim, or proposal applicable to a Government contract. This identification requirement applies also to any costs incurred for the same purpose under like circumstances as the costs specifically identified as unallowable under either this paragraph or paragraph (a) above.

(c) Costs which, in a contracting officer's written decision furnished pursuant to contract disputes procedures, are designated as unallowable directly associated costs of unallowable costs covered by either (a) or (b) above shall be accorded the identification required by paragraph (b) above.

(d) The costs of any work project not contractually authorized, whether or not related to performance of a proposed or existing contract, shall be accounted for, to the extent appropriate, in a manner which permits ready separation from the costs of authorized work projects.

(e) All unallowable costs covered by paragraphs (a) through (d) above shall be subject to the same cost accounting principles governing cost allocability as allowable costs. In circumstances where these unallowable costs normally would be part of a regular indirect-cost allocation base or bases, they shall remain in such base or bases. Where a directly associated cost is part of a category of costs normally includ

ed in an indirect-cost pool that will be allocated over a base containing the unallowable cost with which it is associated, such a directly associated cost shall be retained in the indirect-cost pool and be allocated through the regular allocation process.

(f) Where the total of the allocable and otherwise allowable costs exceeds a limitation-of-cost or ceiling-price provision in a contract, full direct and indirect cost allocation shall be made to the contract cost objective in accordance with established cost accounting practices and standards which regularly govern a given entity's allocations to Government contract cost objectives. In any determination of unallowable cost overrun, the amount thereof shall be identified in terms of the excess of allowable costs over the ceiling amount, rather than through specific identification of particular cost items or cost elements.

§ 405.50 Techniques for application.

(a) The detail and depth of records required as backup support for proposals, billings, or claims shall be that which is adequate to establish and maintain visibility of identified unallowable costs (including directly associated costs), their accounting status in terms of their allocability to contract cost objectives, and the cost accounting treatment which has been accorded such costs. Adherence to this cost accounting principle does not require that allocation of unallowable costs to final cost objectives be made in the detailed cost accounting records. It does require that unallowable costs be given appropriate consideration in any cost accounting determinations governing the content of allocation bases used for distributing indirect costs to cost objectives. Unallowable costs involved in the determination of rates used for standard costs, or for indirect-cost bidding or billing, need be identified only at the time rates are proposed, established, revised, or adjusted.

(b) The visibility requirement of paragraph (a) above may be satisfied by any form of cost identification which is adequate for purposes of contract cost determination and verification. The standard does not require such cost identification for purposes which are not relevent to the determination of Government contract cost. Thus, to provide visibility for incurred costs, acceptable alternative practices would include (1) the segregation of unallowable costs in separate accounts maintained for this purpose in the regular books of account, (2) the development and maintenance of separate accounting records or work papers, or (3) the use of any less formal cost accounting techniques which establishes and maintains adequate cost identification to permit audit verification of the accounting recognition given unallowable costs. Contractors may satisfy the visibility requirements for esti

mated costs either (1) by designation and description (in backup data, workpapers, etc.) of the amounts and types of any unallowable costs which have specifically been identified and recognized in making the estimates, or (2) by description of any other estimating technique employed to provide appropriate recognition of any unallowable costs pertinent to the estimates.

(c) Specific identification of unallowable costs is not required in circumstances where, based upon considerations of materiality, the Government and the contractor reach agreement on an alternate method that satisfies the purpose of the standard.

§ 405.60 Illustrations.

(a) An auditor recommends disallowance of certain direct labor and direct material costs, for which a billing has been submitted under a contract, on the basis that these particular costs were not required for performance and were not authorized by the contract. The contracting officer issues a written decision which supports the auditor's position that the questioned costs are unallowable. Following receipt of the contracting officer's decision, the contractor must clearly identify the disallowed direct labor and direct material costs in his accounting records and reports covering any subsequent submission which includes such costs. Also, if the contractor's base for allocation of any indirect cost pool relevant to the subject contract consists of direct labor, direct material, total prime cost, total cost input, etc., he must include the disallowed direct labor and material costs in his allocation base for such pool. Had the contracting officer's decision been against the auditor, the contractor would not, of course, have been required to account separately for the costs questioned by the auditor.

(b) A contractor incurs, and separately identifies, as a part of his manufacturing overhead, certain costs which are expressly unallowable under the existing and currently effective regulations. If manufacturing overhead is regularly a part of the contractor's base for allocation of general and administrative (G&A) or other indirect expenses, the contractor must allocate the G&A or other indirect expenses to contracts and other final cost objectives by means of a base which includes the identified unallowable manufacturing overhead costs.

(c) An auditor recommends disallowance of the total direct indirect costs attributable to an organizational planning activity. The contractor claims that the total of these activity costs are allowable under the Armed Services Procurement Regulation as "Economic Planning Costs" (ASPR 15-205.47) (FPR Note: Comparable section in the FPR is 1-15.205.47); the auditor contends that they constitute "Organization Costs" (ASPR 15-205.23) (FPR Note: Comparable

section in the FPR is 1-15.205.23) and therefore are unallowable. The issue is referred to the contracting officer for resolution pursuant to the contract disputes clause. The contracting officer issues a written decision supporting the auditor's position that the total costs questioned are unallowable under the regulation. Following receipt of the contracting officer's decision, the contractor must identify the disallowed costs and specific other costs incurred for the same purpose in like circumstances in any subsequent estimating, cost accumulation or reporting for Government contracts, in which such costs are included. If the contracting officer's decision had supported the contractor's contention, the costs questioned by the auditor would have been allowable "Economic Planning Costs," and the contractor would not have been required to provide special identification.

(d) A defense contractor was engaged in a program of expansion and diversification of corporate activities. This involved internal corporate reorganization, as well as mergers and acquisitions. All costs of this activity were charged by the contractor as corporate or segment general and administrative (G&A) expense. In the contractor's proposals for final segment G&A rates (including corporate home office allocations) to be applied in determining allowable costs of its defense contracts subject to section XV, Part 2, of the Armed Services Procurements Regulation (FPR Note: Comparable reference in the FPR is Subpart 1-15.2), the contractor identified and excluded the expressly unallowable costs (as listed in ASPR 15205.23) (FPR Note: Comparable section in the FPR is 1-15.205.23) incurred for incorporation fees and for charges for special services of outside attorneys, accountants, promoters, and consultants. In addition, during the course of negotiation of interim bidding and billing G&A rates, the contractor agreed to classify as unallowable various in-house costs incurred for the expansion program, and various directly associated costs of the identifiable unallowable costs. On the basis of negotiations and agreements between the contractor and the contracting officer's authorized representatives, interim G&A rates were established, based on the net balance of allowable G&A costs. Application of the rates negotiated to proposals, and on an interim basis to billings, for covered contracts constitutes compliance with the standard.

(e) An official of a company, whose salary, travel, and subsistence expenses are charged regularly as general and administrative (G&A) expenses, takes several business associates on what is clearly a business entertainment trip. The entertainment costs of such trips is expressly unallowable because it constitutes entertainment expense, and is separately identified by the contractor. The

40-104 O-79——19

[blocks in formation]

AUTHORITY: Sec. 719, Defense Production Act of 1950, as amended (Pub. L. 91-379, 50 U.S.C. App. 2168).

SOURCE: 38 FR 30730, Nov. 7, 1973 unless otherwise noted.

§ 406.10 General applicability.

This standard shall be used by defense contractors and subcontractors under Federal contracts entered into after the effective date hereof and by all relevant Federal agencies in estimating, accumulating, and reporting costs in connection with the pricing, administration, and settlement of all negotiated prime contract and subcontract national defense procurements with the United States in excess of $100,000 other than contracts or subcontracts where the price negotiated is based on: (a) Established catalog or market prices of commercial items sold in substantial quantities to the general public, or (b) prices set by law or regulation.

§ 406.20 Purpose.

The purpose of this Cost Accounting Standard is to provide criteria for the selection of the time periods to be used as cost accounting periods for contract cost estimating, accumulating, and reporting. This standard will reduce the effects of variations in the flow of costs within each cost accounting period. It will also enhance ob

jectivity, consistency, and verifiability, and promote uniformity and comparability in contract cost measurements.

§ 406.30 Definitions.

(a) The following definitions which are prominent in this standard are reprinted from Part 400 of this chapter for convenience. Other terms which are used in this standard and are defined in Part 400 of this chapter have the meanings ascribed to them in that part unless the text demands a different definition or the definition is modified in paragraph (b) of this section.

(1) Allocate. To assign an item of cost, or a group of items of cost, to one or more cost objectives. This term includes both direct assignment of cost and the reassignment of a share from an indirect cost pool.

(2) Cost objective. A function, organizational subdivision, contract or other work unit for which cost data are desired and for which provision is made to accumulate and measure the cost of processes, products, jobs, capitalized projects, etc.

(3) Fiscal year. The accounting period for which annual financial statements are regularly prepared, generally a period of 12 months, 52 weeks, or 53 weeks.

(4) Indirect cost pool. A grouping of incurred costs identified with two or more objectives but not identified specifically with any final cost objective.

(b) The following modifications of definitions set forth in Part 400 of this chapter are applicable: None.

§ 406.40 Fundamental requirement.

(a) A contractor shall use his fiscal year as his cost accounting period, except that:

(1) Costs of an indirect function which exists for only a part of a cost accounting period may be allocated to cost objectives of that same part of the period as provided in § 406.50(a).

(2) An annual period other than the fiscal year may, as provided in § 406.50(d), be used as the cost accounting period if its use is an established practice of the contractor.

(3) A transitional cost accounting period other than a year shall be used whenever a change of fiscal year occurs.

(4) Where a contractor's cost accounting period is different from the reporting period required by Renegotiation Board regulations, the latter may be used for such reporting.

(b) A contractor shall follow consistent practices in his selection of the cost accounting period or periods in which any types of expense and any types of adjustment to expense (including prior-period adjustments) are accumulated and allocated.

(c) The same cost accounting period shall be used for accumulating costs in an indirect cost pool as for establishing its allocation base, except that the contracting par

ties may agree to use a different period for establishing an allocation base as provided in § 406.50(e).

§ 406.50 Techniques for application.

(a) The cost of an indirect function which exists for only a part of a cost accounting period may be allocated on the basis of data for that part of the cost accounting period if the cost is (1) material in amount, (2) accumulated in a separate indirect cost pool, and (3) allocated on the basis of an appropriate direct measure of the activity or output of the function during that part of the period.

(b) The practices required by § 406.40(b) of this standard shall include appropriate practices for deferrals, accruals, and other adjustments to be used in identifying the cost accounting periods among which any types of expense and any types of adjustment to expense are distributed. If an expense, such as taxes, insurance or employee leave, is identified with a fixed recurring, annual period which is different from the contractor's cost accounting period, the standard permits continued use of that different period. Such expenses shall be distributed to cost accounting periods in accordance with the contractor's established practices for accruals, deferrals and other adjustments.

(c) Indirect cost allocation rates, based on estimates, which are used for the purpose of expediting the closing of contracts which are terminated or completed prior to the end of a cost accounting period need not be those finally determined or negotiated for that cost accounting period. They shall, however, be developed to represent a full cost accounting period, except as provided in paragraph (a) of this section.

(d) A contractor may, upon mutual agreement with the Government, use as his cost accounting period a fixed annual period other than his fiscal year, if the use of such a period is an established practice of the contractor and is consistently used for managing and controlling the business, and appropriate accruals, deferrals, or other adjustments are made with respect to such annual periods.

(e) The contracting parties may agree to use an annual period which does not coincide precisely with the cost accounting period for developing the data used in establishing an allocation base: Provided, (1) The practice is necessary to obtain significant administrative convenience, (2) the practice is consistently followed by the contractor, (3) the annual period used is representative of the activity of the cost accounting period for which the indirect costs to be allocated are accumulated, and (4) the practice can reasonably be estimated to provide a distribution to cost objectives of the cost account

ing period not materially different from that which otherwise could be obtained.

(f) When a transitional cost accounting period is required under the provisions of § 406.40(a)(3), the contractor may select any one of the following: (1) The period, less than a year in length, extending from the end of his previous cost accounting period to the beginning of his next regular cost accounting period; (2) a period in excess of a year, but not longer than fifteen months, obtained by combining the period described in subparagraph (1) of this paragraph with the previous cost accounting period; or (3) a period in excess of a year, but not longer than fifteen months, obtained by combining the period described in subparagraph (1) of this paragraph with the next regular cost accounting period. A change in the contractor's cost accounting period is a change in accounting practices for which an adjustment in the contract price may be required in accordance with paragraph (a)(4)(B) of the contract clause set out at § 331.50 of this chapter.

§ 406.60 Illustrations.

(a) A contractor allocates general management expenses on the basis of total cost input. In a proposal for a covered negotiated fixed-price contract, he estimates the allocable expenses based solely on the estimated amount of the general management expense pool and the amount of the total cost input base estimated to be incurred during the eight months in which performance is scheduled to be commenced and completed. Such a proposal would be in violation of the requirements of this standard that the calculation of the amounts of both the indirect cost pools and the allocation bases be based on the contractor's cost accounting period.

(b) A contractor whose cost accounting period is the calendar year, installs a computer service center to begin operations on May 1. The operating expense related to the new service center is expected to be material in amount, will be accumulated in a separate indirect cost poll, and will be allocated to the benefiting cost objectives on the basis of measured usage. The total operating expenses of the computer service center for the eight month part of the cost accounting period may be allocated to the benefiting cost objectives of that same eight month period.

(c) A contractor changes his fiscal year from a calendar year to the 12-month period ending May 31. For financial reporting purposes, he has a five-month transitional "fiscal year." The same five-month period must be used as the transitional cost accounting period; it may not be combined as provided in § 406.50(f), because the transitional period would be longer than fifteen months. The new fiscal year must be adopted thereafter as his regular cost accounting

period. The change in his cost accounting period is a change in accounting practices; adjustments of the contract prices may thereafter be required in accordance with paragraph (a)(4)(B) of the contract clause set out at § 331.50 of this chapter.

(d) Financial reports to stockholders are made on a calendar year basis for the entire contractor corporation. However, the contracting segment does all internal financial planning, budgeting, and internal reporting on the basis of a "model year." The contracting parties agree to use a "model year" and they agree to overhead rates on the "model year" basis. They also agree on a technique for prorating fiscal year assignments of corporate home office expenses between model years. This practice is permitted by the standard.

(e) Most financial accounts and contract cost records are maintained on the basis of a fiscal year which ends November 30 each year. However, employee vacation allowances are regularly managed on the basis of a "vacation year" which ends September 30 each year. Vacation expenses are estimated uniformly during each "vacation year." Adjustments are made each October to adjust the accrued liability to actual, and the estimating rates are modified to the extent deemed appropriate. This use of a separate annual period for determining the amounts of vacation expense is permitted under § 406.50(b).

[blocks in formation]

This standard shall be used by defense contractors and subcontractors under Federal contracts entered into after the effective date hereof and by all relevant Federal agencies in estimating, accumulating, and reporting costs in connection with the pricing, administration, and settlement of all negotiated prime contract and subcontract national defense procurements with the United States in excess of $100,000, other than contracts or subcontracts where the price negotiated is based on: (a) Established catalog or market prices of commercial items sold in substantial quantities to the general public, or (b) prices set by law or regulation.

§ 407.20 Purpose.

(a) The purpose of this Cost Accounting Standard is to provide criteria under which standard costs may be used for estimating, accumulating, and reporting costs of direct material and direct labor; and to provide criteria relating to the establishment of standards, accumulation of standard costs, and accumulation and disposition of variances from standard costs. Consistent application of these criteria where standard costs are in use will improve cost measurement and cost assignment.

(b) This Cost Accounting Standard is not intended to cover the use of pre-established measures solely for estimating.

$407.30 Definitions.

(a) The following definitions of terms which are prominent in this Cost Accounting Standard are reprinted from Part 400 of this chapter for convenience. Other terms which are used in this Cost Accounting Standard and are defined in Part 400 of this chapter have the meanings ascribed to them in that part unless the text demands a different definition or the definition is modified in paragraph (b) of this section.

(1) Labor cost at standard. A pre-established measure of the labor element of cost, computed by multiplying labor-rate standard by labor-time standard.

(2) Labor-rate standard. A pre-established measure, expressed in monetary terms, of the price of labor.

(3) Labor-time standard. A pre-established measure, expressed in temporal terms, of the quantity of labor.

(4) Material cost at standard. A pre-established measure of the material element of cost, computed by multiplying materialprice standard by material-quantity standard.

(5) Material-price standard. A pre-established measure, expressed in monetary terms, of the price of material.

(6) Material-quantity standard. A pre-established measure, expressed in physical terms, of the quantity of material.