Code of Federal Regulations: Containing a Codification of Documents of General Applicability and Future Effect as of December 31, 1948, with Ancillaries and IndexDivision of the Federal Register, the National Archives, 1999 - Administrative law |
From inside the book
Results 1-5 of 100
Page 32
... application . ( c ) Additional information . The regu- latory authority shall notify the appli- cant if the application for exemption is incomplete and may at any time re- quire submittal of additional informa- tion . ( d ) Public ...
... application . ( c ) Additional information . The regu- latory authority shall notify the appli- cant if the application for exemption is incomplete and may at any time re- quire submittal of additional informa- tion . ( d ) Public ...
Page 123
... application as an original application . [ 42 FR 62704 , Dec. 13 , 1977 , as amended at 47 FR 38490 , Aug. 31 , 1982 ] $ 725.16 Grant agreement . ( a ) If a Director or his authorized designee approves an agency's grant application ...
... application as an original application . [ 42 FR 62704 , Dec. 13 , 1977 , as amended at 47 FR 38490 , Aug. 31 , 1982 ] $ 725.16 Grant agreement . ( a ) If a Director or his authorized designee approves an agency's grant application ...
Page 142
... application is required . Each application must include the fol- lowing : ( 1 ) Part I , Coversheet , SF 424 . Application Form ( 2 ) Part II , Project Approval Informa- tion . ( i ) For non - construction grants use Form OSM - 50A ...
... application is required . Each application must include the fol- lowing : ( 1 ) Part I , Coversheet , SF 424 . Application Form ( 2 ) Part II , Project Approval Informa- tion . ( i ) For non - construction grants use Form OSM - 50A ...
Page 143
... application . The Director or his authorized designee shall process the revised application as an original application . [ 47 FR 62706 , Dec. 13 , 1977. Redesignated at 44 FR 15312 , Mar. 13 , 1979 , and amended at 47 FR 38492 , Aug. 31 ...
... application . The Director or his authorized designee shall process the revised application as an original application . [ 47 FR 62706 , Dec. 13 , 1977. Redesignated at 44 FR 15312 , Mar. 13 , 1979 , and amended at 47 FR 38492 , Aug. 31 ...
Page 150
... application ; ( ii ) Because subsequent to submittal of a permit application , the lands con- tained in the permit application are de- clared unsuitable for mining under sub- chapter F of this chapter ; or ( iii ) Because subsequent to ...
... application ; ( ii ) Because subsequent to submittal of a permit application , the lands con- tained in the permit application are de- clared unsuitable for mining under sub- chapter F of this chapter ; or ( iii ) Because subsequent to ...
Other editions - View all
Common terms and phrases
accordance agency agreement ance approved postmining land ations backfilled blasting certified chapter clude coal exploration coal mine waste coal mining operations coal preparation plant compliance comply conduct surface coal construction criteria dams determine Director disturbed area drainage enforcement environmental eral erosion excess spoil facilities Federal lands FEDERAL REGISTER gram grant ground water hydrologic hydrologic balance impoundments Information collection inspection land reclamation latory authority located material ment mining and rec mining and reclamation monitoring notice Office OSMRE paragraph performance bond performance standards permit application permittee prime farmland procedures proposed permit area protection pursuant quired quirements reclamation operations reclamation plan regu regulations regulatory authority regulatory program requirements revegetation roads runoff safety Secretary sedimentation Sept slope soil specified stability structures subchapter submitted surface coal mining Surface Mining thority tion topsoil turbed underground mining vegetation violation wildlife
Popular passages
Page 212 - An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Page 389 - Sec. 507. (a) No person shall fire, or in any other way discriminate against, or cause to be fired or discriminated against, any employee or any authorized representative of employees by reason of the fact that such employee or representative has filed, instituted, or caused to be filed or instituted any proceeding under this Act, or...
Page 390 - Labor deems appropriate, including, but not limited to, the rehiring or reinstatement of the employee or representative of employees to his former position with compensation.
Page 19 - Approximate original contour means that surface configuration achieved by backfilling and grading of the mined areas so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all highwalls, spoil piles and coal refuse piles eliminated.
Page 276 - Confinement of surface coal mining and reclamation operations including, but not limited to, the location of spoil disposal areas to lands within the permit area; and (j) Striking a balance between protection of the environment and agricultural productivity and the Nation's need for coal as an essential source of energy.
Page 413 - Public reporting burden for this information is estimated to average 1,040 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to...
Page 88 - ... is designed and certified by a qualified registered professional engineer in conformance with professional standards established to assure the stability, drainage, and configuration necessary for the intended use of the site...
Page 276 - ... minimize the disturbances to the prevailing hydrologic balance at the mine-site and in associated offsite areas and to the quality and quantity of water in surface and ground water systems both during and after surface coal mining operations and during reclamation...
Page 76 - The permittee shall replace the water supply of an owner of interest in real property who obtains all or part of his supply of water for domestic, agricultural, industrial, or other legitimate use from an underground or surface source where such supply has been affected by contamination, diminution or interruption proximately resulting from surface coal mine operation by the permittee.
Page 371 - When a notice of violation has been issued under §843.12(a) and the permittee fails to abate the violation within the abatement period fixed or subsequently extended by the authorized representative, the authorized representative of the Secretary shall immediately order a cessation of coal exploration or surface coal mining and reclamation operations, or of the portion relevant to the violation. (2) A cessation order issued under this paragraph (b) shall require the permittee to take all steps the...