Military Construction Appropriations for Fiscal Year 1969: Joint Hearings Before the Subcommittees on Military Construction of the Committee on Appropriations and the Committee on Armed Services, United States Senate, Ninetieth Congress, Second Session, on H.R. 18785 ... |
Other editions - View all
Common terms and phrases
accommodate additional adequate Admiral HUSBAND Air Command Air Force Base aircraft amount appropriation barracks building Calif Center Chairman Colonel FENLON Committee communications Congress DALRYMPLE deficiency dormitory engine equipment estimated cost family housing fiscal year 1969 Fort Huachuca Fort Polk funds GODDARD hangar headquarters hospital increase installation item provides item will provide line item proposes located Logistics maintenance facilities Marine Corps ment Military Airlift Command military construction program million missile mission MORRIS Naval Air Station Navy North Dakota percent personnel planning pollution reclama reduce repair Reserve runway Secretary of Defense Senator BIBLE Senator ELLENDER Senator INOUYE Senator JACKSON Senator THURMOND Senator YOUNG sewage SHERIDAN shipyard South Vietnam Southeast Asia space squadron square feet storage supply tactical Tactical Air Command tion training facilities troop housing U.S. Air Force U.S. Army units utilities Vietnam YOUNG of North
Popular passages
Page 292 - San Antonio, Tex. The use of this base is for the Aerospace Medical Division Headquarters and the School of Aerospace Medicine. The total program requested is $2,414,000 and consists of one item to provide an aviation medical facility.
Page 75 - ... for support of military family housing, including operating expenses, leasing, maintenance of real property, payments of principal and interest on mortgage debts incurred, payments to the Commodity Credit Corporation, and mortgage insurance premiums authorized under section 222 of the National Housing Act, as amended (12 USC 1715m), an amount not to exceed $489,700,000.
Page 628 - A better evaluation of program direction by missions is obtained by use of the program package management totals, the system now used throughout the Department of Defense. Table II, also attached, summarizes the request in these program packages.
Page 414 - The sixth item is for construction of an aircraft maintenance hangar at the estimated cost of $4,913,000.
Page 297 - AIR TRAINING COMMAND The mission of the Air Training Command is to provide flying training leading to an aeronautical rating ; air crew training ; basic and advanced technical training leading to an Air Force specialty ; basic military training ; mobile training, and such other training as may be directed by the Chief of Staff, USAF.
Page 338 - Command is to provide supervision, guidance and administrative control of the USAF missions in Latin America; provide supervision, guidance, and administrative control of the Air Force phase of the mutual defense assistance program (MDAP) for Latin American countries; conduct a USAF school for Latin America; provide logistic support for air attaches and USAF missions in Latin America; provide airlift within Latin America for the Intra-American Geodetic Survey Team, and provide administrative control...
Page 338 - America; provide supervision, guidance, and administrative control of the Air Force phase of the mutual defense assistance program (MDAP) for Latin American countries: conduct a USAF school for Latin America; provide logistic support for air attaches and USAF missions in Latin America; provide airlift within Latin America for the Intra-American Geodetic Survey Team, and provide administrative control of the US Air Force Section. Joint BrazilUnited States Military Commission. This program contains...
Page 556 - Such improvisations carry with them the almost certain assurance that we will be forced to continue in use buildings that are uneconomical or not functionally suitable for the expedient role we may be forced to give them.".
Page 73 - Is for the control of air pollution, and $68.8 million for the control of water pollution. All of the latter projects are based on the recommendations of the Federal Water Pollution Control Administration.
Page 335 - Command. The program requested for this base totals $1,053,000 and consists of the following two items : The first item for construction of a covered aircraft corrosion control facility is required to provide covered space for inspection and treatment for aircraft surface metals which have a high affinity for corrosion. The construction of new airmen dormitories with space for 300 men will reduce the overcrowding in existing dormitories of substandard condition. These facilities will provide approximately...