whose liquid discharges are not subject to external regulation.

C15 Siting, construction (or expansion), and operation of research and development incinerators for any type of waste and of any other incinerators that would treat nonhazardous solid waste (as designated in 40 CFR Part 261.4(b)).

C16 Siting, construction (or modification to increase capacity), operation, and decommissioning of packaging and unpacking facilities (that may include characterization operations) and large storage facilities (greater than approximately 50,000 square feet in area) for waste, except high-level radioactive waste, generated onsite or resulting from activities connected to site operations. These actions do not include storage, packaging, or unpacking of spent nuclear fuel. See also B6.4, B6.5, B6.6, and B6.10.

[57 FR 15144, Apr. 24, 1992, as amended at 61 FR 36242, July 9, 1996; 61 FR 64608, Dec. 6, 1996]

APPENDIX D TO SUBPART D TO PART 1021-CLASSES OF ACTIONS THAT NORMALLY REQUIRE EISS

Table of Contents

D1. Strategic Systems

D2. Siting/construction/operation/decommissioning of nuclear fuel reprocessing facilities

D3. Siting/construction/operation/decommis

sioning of uranium enrichment facilities

D4. Siting/construction/operation/decommis

sioning of reactors

D5. Main transmission system additions
D6. Integrating transmission facilities

D7. Allocation of electric power, major new generation resources/major changes in operation of generation resources/major loads. D8. Import/export of natural gas, involving major new facilities

D9. Import/export of natural gas, involving significant operational change

D10.

Siting/construction/operation/decommissioning of major treatment, storage, and disposal facilities for high-level waste and spent nuclear fuel

D11. Siting/construction/expansion of waste disposal facility for transuranic waste D12. Siting/construction/operation of incinerators (other than research and development, other than nonhazardous solid waste)

D1 Strategic Systems, as defined in DOE Order 430.1, "Life-Cycle Asset Management," and designated by the Secretary.

D2 Siting, construction, operation, and decommissioning of nuclear fuel reprocessing facilities.

D3 Siting, construction, operation, and decommissioning of uranium enrichment fa

cilities.

D4 Siting, construction, operation, and decommissioning of power reactors, nuclear material production reactors, and test and research reactors.

D5 Main transmission system additions (that is, additions of new transmission lines) to a Power Marketing Administration's main transmission grid.

D6 Integrating transmission facilities (that is, transmission system additions for integrating major new sources of generation into a Power Marketing Administration's main grid).

D7 Establishment and implementation of contracts, policies, marketing plans or allocation plans for the allocation of electric power that involve (1) the addition of new generation resources greater than 50 average megawatts, (2) major changes in the operating limits of generation resources greater than 50 average megawatts, or (3) service to discrete new loads of 10 average megawatts or more over a 12 month period. This applies to power marketing operations and to siting construction, and operation of power generating facilities at DOE sites.

D8 Approval or disapproval of an application to import/export natural gas under section 3 of the Natural Gas Act involving major new natural gas pipeline construction or related facilities, such as construction of new liquid natural gas (LNG) terminals. regasification or storage facilities, or a significant expansion of an existing pipeline or related facility or LNG terminal, regasification, or storage facility.

D9 Approval or disapproval of an application to import/export natural gas under section 3 of the Natural Gas Act involving a significant operational change, such as a major increase in the quantity of liquid natural gas imported or exported.

D10 Siting, construction, operation, and decommissioning of major treatment, storage, and disposal facilities for high-level waste and spent nuclear fuel, including geologic repositories, but not including onsite replacement or upgrades of storage facilities for spent nuclear fuel at DOE sites where such replacement or upgrade will not result in increased storage capacity.

D11 Siting, construction (or expansion), and operation of a disposal facility for transuranic (TRU) waste and TRU mixed waste (TRU waste also containing hazardous waste as designated in 40 CFR part 261).

D12 Siting, construction, and operation of incinerators, other than research and development incinerators or incinerators for nonhazardous solid waste (as designated in 40 CFR part 261.4(b)).

[57 FR 15144, Apr. 24, 1992, as amended at 61 FR 36243, July 9, 1996; 61 FR 64608, Dec. 6, 1996]

[blocks in formation]

Subpart A-General

§ 1022.1 Background.

Executive Order (E.O.) 11988-Floodplain Management (May 24, 1977), requires each Federal agency to issue or amend existing regulations and procedures to ensure that the potential effects of any action it may take in a floodplain are evaluated and that its planning programs and budget requests reflect consideration of flood hazards and floodplain management. Guidance for implementation of the Order is provided in the Floodplain Management Guidelines of the U.S. Water Resources Council (40 FR 6030, Feb. 10, 1978). Executive Order 11990-Protection of Wetlands (May 24, 1977), requires all Federal agencies to issue or amend existing procedures to ensure consideration of wetlands protection in decisionmaking. It is the intent of both Executive orders that Federal agencies implement the floodplain/wetlands re

quirements through existing procedures such as those established to implement the National Environmental Policy Act (NEPA) of 1969. In those instances where the impacts of actions in floodplains and/or wetlands are not significant enough to require the preparation of an environmental impact statement (EIS) under section 102(2)(C) of NEPA, alternative floodplain/wetlands evaluation procedures are to be established.

§ 1022.2 Purpose and scope.

(a) This part establishes policy and procedures for discharging the Department of Energy's (DOE's) responsibilities with respect to compliance with E.O. 11988 and E.O. 11990, including:

(1) DOE policy regarding the consideration of floodplain/wetlands factors in DOE planning and decisionmaking; and

(2) DOE procedures for identifying proposed actions located in floodplain/ wetlands, providing opportunity for early public review of such proposed actions, preparing floodplain/wetlands assessments, and issuing statements of findings for actions in a floodplain.

(b) To the extent possible, DOE will accommodate the requirements of E.O. 11988 and E.O. 11990 through applicable DOE NEPA procedures.

§ 1022.3 Policy.

DOE shall exercise leadership and take action to:

(a) Avoid to the extent possible the long- and short-term adverse impacts associated with the destruction of wetlands and the occupancy and modification of floodplains and wetlands, and avoid direct and indirect support of floodplain and wetlands development wherever there is a practicable alternative.

(b) Incorporate floodplain management goals and wetlands protection considerations into its planning, regulatory, and decisionmaking processes, and shall to the extent practicable:

(1) Reduce the hazard and risk of flood loss;

(2) Minimize the impact of floods on human safety, health, and welfare; (3) Restore and preserve natural and beneficial values served by floodplains;

(4) Require the construction of DOE structures and facilities to be, at a minimum, in accordance with the standards and criteria set forth in, and consistent with the intent of, the regulations promulgated by the Federal Insurance Administration pursuant to the National Flood Insurance Act of 1968, as amended, 42 U.S.C. 4001 et seq.; (5) Minimize the destruction, loss, or degradation of wetlands;

(6) Preserve and enhance the natural and beneficial values of wetlands;

(7) Promote public awareness of flood hazards by providing conspicuous delineations of past and probable flood heights on DOE property which has suffered flood damage or is in an identified flood hazard area and which is used by the general public; and

(8) Prior to the completion of any financial transaction related to an area located in a floodplain, which is guaranteed, approved, regulated or insured by DOE, inform any private participating parties of the flood-related hazards involved.

(c) Undertake a careful evaluation of the potential effects of any DOE action taken in a floodplain and any new construction undertaken by DOE in wetlands not located in a floodplain.

(d) Identify, evaluate, and, as appropriate implement alternative actions which may avoid or mitigate adverse floodplain/wetlands impacts; and

(e) Provide opportunity for early public review of any plans or proposals for actions in floodplains and new construction in wetlands.

§ 1022.4 Definitions.

For purposes of this part:

(a) Action means any DOE activity, including, but not limited to:

(1) Acquiring, managing, and disposing of Federal lands and facilities;

(2) DOE-undertaken, financed, or assisted construction and improvements; and

(3) The conduct of DOE activities and programs affecting land use, including but not limited to water and related land resources planning, regulating and licensing activities.

(b) Base Flood means that flood which has a 1 percent chance of occurrence in any given year (also known as a 100year flood).

(c) Critical Action means any activity for which even a slight chance of flooding would be too great. Such actions may include the storage of highly volatile, toxic, or water reactive materials. (d) Environmental Assessment (EA)

means a document for which DOE is responsible that serves to: (1) Briefly provide sufficient evidence and analysis for determining whether to prepare an environmental impact statement (EIS) or a finding of no significant impact, (2) aid DOE compliance with NEPA when no EIS is necessary, and (3) facilitate preparation of an EIS when one is necessary. The EA shall include brief discussions of the need for the proposal, alternatives, environmental impacts of the proposed action and alternatives, and a listing of agencies and persons consulted.

(e) Environmental Impact Statement means a document prepared in accordance with the requirements of section 102(2)(C) of NEPA.

(f) Facility means any man-placed item other than a structure.

(g) Finding of No Significant Impact (FONSI) means a document prepared by DOE which briefly presents the reasons why an action will not significantly effect on the human environment and for which an EIS therefore will not be prepared.

(h) Flood or Flooding means a temporary condition of partial or complete inundation of normally dry land areas from the overflow of inland and/or tidal waters, and/or the unusual and rapid accumulation or runoff of surface waters from any source.

(i) Floodplain means the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands including, at a minimum, that area inundated by a 1 percent or greater chance flood in any given year. The base floodplain is defined as the 100-year (1.0 percent) floodplain. The critical action floodplain is defined as the 500-year (0.2 percent) floodplain.

(j) Floodplain Action means any DOE action which takes place in a floodplain.

(k)

Floodplain/Wetlands

Assessment means an evaluation consisting of a description of a proposed action, a discussion of its effects on the floodplain/wetlands, and consideration of alternatives.

(1) Floodproofing means the modification of individual structures and facilities, their sites, and their contents to protect against structural failure, to keep water out, or to reduce the effects of water entry.

(m) High Hazard Areas means those portions of riverine and coastal floodplains nearest the source of flooding which are frequently flooded and where the likelihood of flood losses and adverse impacts on the natural and beneficial values served by floodplains is greatest.

(n) Minimize means to reduce to the smallest degree practicable.

(0) New Construction for the purpose of compliance with E.O. 11990 includes draining, dredging, channelizing, filling, diking, impounding, and related activities and any structures or facilities begun or authorized after October 1, 1977.

(p) Practicable means capable of being accomplished within existing constraints. The test of what is practicable depends on the situation and includes consideration of many factors, such as environment, cost, technology, and implementation time.

(q) Public Notice means a brief notice published in the FEDERAL REGISTER, and circulated to affected and interested persons and agencies, which describes a proposed floodplain/wetlands action and affords the opportunity for public review.

(r) Preserve means to prevent modification to the natural floodplain/wetlands environment or to maintain it as closely as possible to its natural state.

(s) Restore means to reestablish a setting or environment in which the natural functions of the floodplain can again operate.

(t) Statement of Findings means a statement issued pursuant to E.O. 11988 which explains why a DOE action is proposed in a floodplain, lists alternatives considered, indicates whether the action conforms to State and local floodplain standards, and describes

steps to be taken to minimize harm to or within the floodplain.

(u) Structure means a walled or roofed building, including mobile homes and gas or liquid storage tanks.

(v) Wetlands means those areas that are inundated by surface or groundwater with a frequency sufficient to support and under normal circumstances does or would support a prevalence of vegetative or aquatic life that requires saturated or seasonally saturated soil conditions for growth and reproduction. Wetlands generally include swamps, marshes, bogs, and similar areas such as sloughs, potholes, wet meadows, river overflow, mudflats, and natural ponds.

(w) Wetlands Action means an action undertaken by DOE in a wetlands not located in a floodplain, subject to the exclusions specified at § 1022.5(c).

§1022.5 Applicability.

(a) This part shall apply to all organizational units of DOE, except that it shall not apply to the Federal Energy Regulatory Commission.

(b) This part shall apply to all proposed floodplain/wetlands actions, including those sponsored jointly with other agencies, where practicable alternatives to the proposed action are still available. With respect to programs and projects for which the appropriate environmental review has been completed or a final EIS filed prior to the effective date of these regulations, DOE shall, in lieu of the procedures set forth in this part, review the alternatives identified in the environmental review or in the final EIS to determine whether an alternative action may avoid or minimize impacts on the floodplain/wetlands. If project or program implementation has progressed to the point where review of alternatives is no longer practicable, or if DOE determines after a review of alternatives to take action in a floodplain, DOE shall design or modify the selected alternative in order to minimize potential harm to or within the floodplain and to restore and preserve floodplain values. DOE shall publish in the FEDERAL REGISTER, a brief description of measures to be employed and shall endeavor to notify appropriate Federal, State, and local agencies and

persons or groups known to be interested in the action.

(c) This part shall not apply to wetlands projects under construction prior to October 1, 1977; wetlands projects for which all of the funds have been appropriated through fiscal year 1977; or wetlands projects and programs for which a draft or final EIS was filed prior to October 1, 1977. With respect to proposed actions located in wetlands (not located in a floodplain), this part shall not apply to the issuance by DOE of permits, licenses, or allocations to private parties for activities involving wetlands which are located on non-Federal property.

(d) This part applies to activities in furtherance of DOE responsibilities for acquiring, managing, and disposing of Federal lands and facilities. When property in a floodplain or wetlands is proposed for lease, easement, right-ofway, or disposal to non-Federal public or private parties, DOE shall: (1) Identify those uses that are restricted under Federal, State, or local floodplains or wetlands regulations; (2) attach other appropriate restrictions to the uses of the property; or (3) withhold the property from conveyance.

fi

(e) This part applies to activities in furtherance of DOE responsibilities for providing federally undertaken, nanced, or assisted construction and improvements. Applicants for assistance shall provide DOE with an analysis of the impacts which would result from any proposed wetland or floodplain activity.

(f) This part applies to activities in furtherance of DOE responsibilities for conducting Federal activities and programs affecting land use, including but not limited to, water and related resource planning, regulating and licensing activity.

(g) This part ordinarily shall not apply to routine maintenance of existing facilities and structures on DOE property within a floodplain/wetlands since such actions normally have minimal or no adverse impact on a floodplain/wetlands. However, where unusual circumstances indicate the possibility of impact on a floodplain/wetlands, DOE shall consider the need for a floodplain/wetlands assessment for such actions.

[blocks in formation]

(a) Concurrent with its review of a proposed action to determine appropriate NEPA requirements, DOE shall determine the applicability of the floodplain management and wetlands protection requirements of this part.

(b) In making the floodplain determination, DOE shall utilize the Flood Insurance Rate Maps (FIRM's) or the Flood Hazard Boundary Maps (FHBM's) prepared by the Federal Insurance Administration of the Department of Housing and Urban Development to determine if a proposed action is located in the base or critical action floodplain, as appropriate. For a proposed action in an area of predominantly Federal or State land holdings where FIRM or FHBM maps are not available. information shall be sought from the land administering agency (e.g., Bureau of Land Management, Soil Conservation Service, etc.) or from agencies with floodplain analysis expertise.

(c) In making the wetlands determination, DOE shall utilize information available from the following sources, as appropriate:

(1) U.S. Fish and Wildlife Service National Wetlands Inventory;

(2) U.S. Department of Agriculture Soil Conservation Service Local Identification Maps;

(3) U.S. Geological Survey Topographic Maps;

(4) State wetlands inventories; and (5) Regional or local governmentsponsored wetland or land use inventories.