Page images
PDF
EPUB
[blocks in formation]

(7) Unsaturated zone flow and transport characteristics, which include:

(i) Unsaturated zone transport-for example, the movement of water with dissolved radionuclides or colloidal particles through the unsaturated zone underlying the repository, including retardation mechanisms such as sorption on rock or mineral surfaces;

(ii) Thermal hydrology-for example, effects of heat from the waste on water flow through the site.

(8) Saturated zone flow and transport characteristics, which include:

(i) Saturated zone transport-for example, the movement of water with dissolved radionuclides or colloidal particles through the saturated zone underlying and beyond the repository, including retardation mechanisms such as sorption on rock or mineral surfaces; and

(ii) Dilution-for example, diffusion of radionuclides into pore spaces, dis

persion of radionuclides along flow paths, and mixing with non-contaminated ground water.

(9) Biosphere characteristics, which include:

(i) Reference biosphere and reasonably maximally exposed individual-for example, biosphere water pathways, location and behavior of reasonably

maximally exposed individual; and

(ii) Biosphere transport and uptake— for example, the consumption of ground or surface waters through direct extraction or agriculture, including mixing with non-contaminated waters and exposure to contaminated agricultural products.

(b) DOE will evaluate the postclosure suitability of the Yucca Mountain disposal system using criteria that consider disruptive processes and events important to the total system performance of the geologic repository. The applicable criteria related to disruptive processes and events include:

(1) Volcanism-for example, the probability and potential consequences of a volcanic eruption intersecting the repository;

(2) Seismic events-for example, the probability and potential consequences of an earthquake on the underground facilities or hydrologic system; and

(3) Nuclear criticality-for example, the probability and potential consequences of a self-sustaining nuclear reaction as a result of chemical or physical processes affecting the waste either in or after release from breached waste packages.

CHAPTER X-DEPARTMENT OF ENERGY

(GENERAL PROVISIONS)

Part 1000

Page

1002

Transfer of proceedings to the Secretary of Energy
and the Federal Energy Regulatory Commission
Official seal and distinguishing flag ......

617

620

[blocks in formation]

1005

Intergovernmental review of Department of En-
ergy programs and activities

654

1008

1009

Records maintained on individuals (Privacy Act)
General policy for pricing and charging for mate-
rials and services sold by DOE

657

[ocr errors]

673

1010 1013 1014

Conduct of employees .....

675

Program fraud civil remedies and procedures
Administrative claims under Federal Tort Claims

676

Act...

692

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

Referral of debts to IRS for tax refund offset ....
National Environmental Policy Act implementing
procedures ......

722

[blocks in formation]

Procedures for financial assistance appeals
Governmentwide debarment and suspension (non-
procurement) and governmentwide requirements
for drug-free workplace (grants)

771

775

1039

Uniform relocation assistance and real property
acquisition for Federal and federally assisted
programs

797

1040

Nondiscrimination in federally assisted programs

797

Part 1041

1042

Enforcement of nondiscrimation on the basis of
handicap in programs or activities conducted by
the Department of Energy

Nondiscrimination on the basis of sex in education
programs or activities receiving federal financial
assistance ...

Page

828

834

1044

1045

1046

1047

Security requirements for protected disclosures
under section 3164 of the National Defense Au-
thorization Act for fiscal year 2000 ......
Nuclear classification and declassification
Physical protection of security interests....
Limited arrest authority and use of force by pro-
tective force officers

8.50

853

867

879

1048

Trespassing on Strategic Petroleum Reserve facili-
ties and other property

882

1049

Limited arrest authority and use of force by pro-
tective force officers of the Strategic Petroleum
Reserve ....

883

1050 1060

Foreign gifts and decorations

886

Payment of travel expenses of persons who are not
Government employees

895

[blocks in formation]

§ 1000.1 Transfer of proceedings.

(a) Scope. This part establishes the transfer of proceedings pending with regard to those functions of various agencies which have been consolidated in the Department of Energy and identifies those proceedings which transferred into the jurisdiction of the Secretary and those which are transferred into the jurisdiction of the Federal Energy Regulatory Commission.

are

(b) Proceedings transferred to the Secretary. The following proceedings are transferred to the Secretary:

(1) All Notices of Proposed Rulemaking, pending and outstanding, which have been proposed by the Department of Energy and the DepartEment of Energy;

(2) All Notices of Inquiry which have been issued by the Department of Energy;

(3) All Requests for Interpretations which have been filed pursuant to 10 CFR part 205, subpart F, and on which no interpretation has been issued, with the Office of General Counsel of the Department of Energy;

(4) All Applications for Exception Relief which have been filed pursuant to 10 CFR part 205, subpart D, and on which no final decision and order has been issued, with the Office of Exceptions and Appeals of the Department of Energy;

(5) All petitions for special redress, relief or other extraordinary assistance which have been filed pursuant to 10 CFR part 205, subpart R, and on which no order has been issued, with the Office of Private Grievances and Redress of the Department of Energy;

(6) All appeals from Remedial Orders, Exception Decisions and Orders, Interpretations issued by the Office of General Counsel, and other agency orders which have been filed pursuant to 10 CFR part 205, subpart H, and on which no order has been issued prior to October 1, 1977, with the Office of Exceptions and Appeals of the Department of Energy;

(7) All applications for modification or rescission of any DOE order or interpretation which have been filed pursuant to 10 CFR part 205, subpart J, and on which no order has been issued prior to October 1, 1977, with the Office of Exceptions and Appeals of the Federal Energy Administation;

NOTE: For a document relating to procedures for natural gas import and export proceedings see 42 FR 61856, Dec. 7, 1977.

(8) All applications for temporary stays and stays which have been filed pursuant to 10 CFR part 205, subpart I, and on which no order has been issued, with the Office of Exceptions and Appeals of the Department of Energy;

(9) All applications which have been filed with the Office of Regulatory Programs of the Department of Energy and on which no final order has been issued;

(10) All investigations which have been instituted and have not been resolved by the Office of Compliance of the Department of Energy;

(11) All Notices of Probable Violation which have been issued prior to October 1, 1977, by the Office of Compliance of Department of Energy;

(12) All Notices of Proposed Disallowance which have been issued prior to October 1, 1977, by the Office of Compliance of Department of Energy;

(13) All Prohibition Orders which have been issued pursuant to 10 CFR part 303 and as to which no Notice of Effectiveness has been issued;

(14) From the Department of the Interior:

(i) The tentative power rate adjustments for the Central Valley Project, California, proposed on September 12, 1977 (42 FR 46619, September 16, 1977). (15) From the Interstate Commerce Commission:

(i) Ex Parte No. 308 (Sub-No. 1)-Investigation of Common Carrier Pipelines.

(16) From the Federal Power Commission:

[blocks in formation]
« PreviousContinue »