ITEM 7 Increase in the family housing requirements results from the station ing of increased divisional forces at Fort Stewart ITEM 9 Additionally there is a projected deficit of 753 units for ineligible personnel within the community. Support and training of an Infantry Division (Mech) (Minus), and nondivisional support units, provides support for tenant and satellited activities. FORM DD 1390 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO 28 Two-bedroom dwellings will be low rise, apartment type buildings with carports. The design will include wood-frame construction brick veneer and wood siding. Warm air heating and air-conditioning will be provided. Site work includes grading, paving, walks, landscaping, storm drainage, street lighting and all utilities except telephone service. Government furnished equipment consists of range, refrigerator, garbage disposal, hot water heater, dishwasher, and smoke detector. Solar assisted domestic hot water systems will be provided. The estimated payback period is 19 years. JNCO 2 BR = 950 New SF x 1.05 x $36.50/SF = $36,409/units x 200 000 SOLAR = 156 SF (collector) x 1.05 x $22.85/SF = $3,743/unit x 200 = $749,000 Fort Polk is the home of the 5th Infantry Division (Mech). Community support housing is inadequate for the current need of this installation. Current statistics indicate a housing deficit of 2543 for eligible personnel. Long-range housing deficit for eligible personnel after the completion of the 1155 units under construction and the 260 in the 78-79 program is 2997. Discussion with local community leaders, realtors, and builders and a review of both current and projected available community assets indicates that the local market is not capable of handling the requirements for all the military families in the area. The only manner to provide suitable accommodations for military families is the construction of military family housing. Land is available and proposed housing would DD1 a. The proposed project will cause no significant air and water pollution during construction or when operational. b. The proposed project will not be located in an area subject to flooding. c. An environmental impact statement is being prepared for the installation's change in mission, including family housing. MAY 請記。 iana 3. DEPARTMENT ARMY CURRENT YSIS (As of 31 Jan 79 PROJECTED (As of 30 Sep 85) S AND ASSETS OFFICERS ELIGIPLE TOTAL NG REQUIREMENTS 881 5350 6231 PARATIONS 47 REQUIREMENTS 834 SING 656 ONTROL 107 107 1152 1259 107 122 0 260 260 here is a projected deficit of 950 units for ineligible ommunity. |