Page images
PDF
EPUB
[blocks in formation]

10

DESCRIPTION OF PROPOSED CONSTRUCTION Concrete foundation and floor slab, masonry walls, built-up roof, ventilation and fume control devices, bladder maintenance, maintenance bay, adminstrative area, tool storage, utilities control room, latrines and mechanical room.

AIR CONDITIONING: 8 TONS

11.

SUBSTANDARD: -0

REQUIREMENT: 11,000 SF ADEQUATE: -0PROJECT: Alteration of the existing washrack to provide a Fuel System Maintanance Dock for the 156 Tactical Fighter Group. REQUIREMENT: A covered maintenance dock is required for the disassembly inspection, and repair of aircraft fuel systems. Periodic maintenance of these systems is essential to providing safe and operational aircraft to aircrews. Maintenance of these systems exposes personnel to hazardous fuel fumes which necessitates special design considerations such as explosion proof electrical fixtures, special ventilation systems, and oil/water separators. The facility will also enable aircraft washing and minor corrosion control activities to be accomplished indoors in inclement weather. CURRENT SITUATION: There is no facility of this type in which to do the Fuel Maintenance work. This work is now performed outside on the washrack and bladder maintenance is accomplished in any available facility. IMPACT IF NOT PROVIDED: Without this facility the unit will be unable to effectively maintain its mission.

FORM

DD1 DEC 76 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

4-157

PAGE NO

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY...

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY......

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY......

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT......

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]

3

($000)

None

(PEOPLE)

N/A

($000)

N/A ($000)

28/11/79
35

100
30/07/80

b. Where Design Was Most Recently Used Hulman Field IN

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

Feb 81 (month and year)

Cost ($000)

None

FORM

DD 1391c

PHEVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO. 4-157b

[blocks in formation]

The funds requested for planning and design will provide for final
design for facilities and to achieve full evaluation for each project
in terms of technical adequacy and estimated cost. In addition, the
funds are required to prepare working drawings, specifications, project
planning reports, and design of construction projects to be included
in the Military Construction Program.

FORM

DD10 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO

4-158

57-729 0 - 80 - 42

[blocks in formation]

To provide funds for the construction of facilities not otherwise authorized by law, which are urgently required and cannot wait for the next annual submittal of the Military Construction Program. Such projects are generally the result of program changes or other circumstances which could cause undue hardship or otherwise impair the effective operation and training of Air National Guard units.

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
« PreviousContinue »