Page images
PDF
EPUB

other movable property removed from the vessel is the property of the United States and shall be disposed of in such manner as the Authority may direct within sixty (60) days from the date of the completion of the work. The representative of the Authority, by appropriate item in the specifications, shall cause the Contractor to segregate all equipment, salvageable material and scrap, removed from a vessel in the performance of repairs, in such a manner as to be readily identifiable, and shall submit a list thereof to the local Property and Supply office which is responsible for arranging for retention, disposal, etc., of said equipment, material, and scrap. A copy of the listing is to be attached as a support to the Ship Repair Summary (MA-159).

(b) After the 60-day period, if no direction for disposal is given the Contractor, the Contractor shall store and protect, in the shipyard or outside of the shipyard at its election, such property of the United States, for the additional period directed by said local Property and Supply office who shall furnish a copy of such written direction to the representative of the Authority. The increased contract price for the cost of the storage for such additional period shall be covered by purchase order prepared by the local Property and Supply office.

(c) All scrap removed from the vessel shall be the property of the United States and shall be handled as provided in paragraph (b) of this section: Provided, however, That any scrap or salvage may, upon the written approval of the local Property and Supply office, be purchased or disposed of by the Contractor at the prevailing market price, or at not less than the fair value thereof in the absence of an established market therefor. The net sales price of the scrap or salvage disposed of by the Contractor shall be promptly paid to the office of the District Finance Officer, or at the option of the office of the District Finance Officer, shall be credited against the moneys due or to become due the Contractors.

[SRM-5, Rev., 18 FR 5035, Aug. 22, 1953, as amended at 33 FR 5952, Apr. 18, 1968. Redesignated at 45 FR 44587, July 1, 1980]

Sec. 13. Insurance.

Article 9 of the NSA-LUMPSUM REP Contract sets forth the Contractor's liabilities and obligations with respect to awarded work. Said Article 9 requires that the Contractor shall maintain insurance to cover such liabilities and obligations. Evidence of such insurance shall be submitted to the Chief, Division of Insurance, Washington, D.C., by the contractors for approval.

Sec. 14. Anti-Kickback and Davis-Bacon Acts.

(a) All work awarded under the NSA-LUMPSUMREP Contract is subject to the provisions of the Anti-Kickback Act, and is also subject to the provisions of the Davis-Bacon Act (except in those cases where the Invitations for Bids or job order state that the work covered thereby is not subject to the Davis-Bacon Act). Article 24 of the NSA-LUMPSUMREP Contract requires the compliance of Contractor and its subcontractors with the applicable provisions of said acts. In this respect the Contractor agrees in the NSA-LUMPSUMREP Contract to comply with the regulations of the Secretary of Labor made pursuant to the Anti-Kickback Act.

(b) The Contractor shall, as provided in Article 24(a) of the NSA-LUMPSUM REP Contract, post at the site of the work the wage determination decision of the Secretary of Labor as provided in said Article 24(a).

(c) It shall be the responsibility of the representative of the Authority awarding the work to determine that the Contractor has made the postings required by Article 24(a) of the NSALUMPSUMREP Contract.

(d) In lieu of submitting weekly certified copies of all payrolls to the Authority, as provided in Article 24(d) of the Master LUMPSUMREP Contract the Contractor shall maintain his weekly payrolls for a period of three years and submit weekly an affidavit that the payrolls of the Contractor for the preceding week are correct and complete, that the wage rates contained therein are not less than those determined by the Secretary of Labor and that the classifications set forth

for each labor mechanic conforms with the work he performed. The Contractor shall also submit, and shall be responsible for the submission by its subcontractors of the Anti-Kickback Act affidavits as provided in Article 24(f) of the Master LUMPSUMREP Contract. The Contractor shall submit one copy of each of the weekly payroll and Anti-Kickback Act affidavits to the Records Administration Section, Maritime Administration, Washington 25, D.C.

(e) The representative of the Authority shall require Contractors, pursuant to the provisions of Article 24(d) of the NSA-LUMPSUMREP Contract, to classify or reclassify any class of laborers or mechanics employed on National Shipping Authority contract work and not listed in the Secretary of Labor's decision (schedule of wages). A report of such cases shall be forwarded to the District Ship Repair and Maintenance office for transmittal to the Office of Maritime Labor Policy.

(f) The representatives of the Authority shall be responsible for establishing procedures insuring that Contractors are complying with the DavisBacon Act and in cases of non-compliance withhold payment of contractors' invoices.

(g) The following certification shall be inserted by all contractors on all invoices rendered covering work awarded under the Master Repair Contract subject to the Anti-Kickback and Davis-Bacon Acts.

I hereby certify that in performing the work for which the invoice was rendered that all applicable terms and conditions of the Anti-Kickback and Davis-Bacon Acts as provided in the Master Repair Contract and regulations of the Department of Labor have been complied with.

Sec. 15. Subcontracts.

Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract portions of the work. However, the Contractor must obtain prior approval from the representative of the Authority, awarding the work, for each subcontract in an amount exceeding 10 percent of the contract price for the work covered by a job order or supplemental job order.

Sec. 16. Liquidated damages.

(a) The liquidated damages payable for each calendar day of delay shall be placed on each job order and supplemental job order whether awarded on a competitive bid or negotiated basis.

(b) The completion certificates are to contain the date on which work is actually completed, whereas the job order and supplemental job orders are to contain a completion date based on a fair and reasonable estimate of time to be allowed the contractor to perform the work. Thus, the difference between the completion date specified on the job order or supplemental job orders and on the completion certificates will be the period for which liquidated damages are assessed. If an extension of an original completion date is considered justifiable, the completion certificates are to bear in detail in the space provided for "exceptions" the reasons why the completion dates were extended beyond that specified in the original job orders. The face of the Ship Repair Summaries (MA-159) shall reflect the amounts of liquidated damages. The penalty amount shall be deducted from the invoice prior to payment for the work involved.

[18 FR 5035, Aug. 22, 1953; 18 FR 5294, Sept. 2, 1953. Redesignated at 45 FR 44587, July 1, 1980]

Sec. 17. Performance of work resulting from damage sustained while undergoing repairs.

(a) When damage is sustained by a vessel during performance of repairs under the NSA Master Contract, negotiations for accomplishment of work necessary to correct such damage are to be made with the repair contractor involved, if practicable, and a job order issued to the contractor for the repair of damage. Such job orders are to be assigned a new number and are not to be supplemental to the original award. The following "without prejudice" clause is to be made a part of and place on each job order issued for the performance of work discussed in this section.

It is understood and agreed that the work covered by this job order is awarded and accepted without prejudice to, or waiver of,

any rights of the United States or the Contractor.

(b) If it is determined that the contractor is at fault and the contractor refuses to accept the responsibility, the procedure outlined in Article 27 of the master repair contract shall be followed. It is to be understood that the payment of this type of account is to be withheld pending establishment that the contractor involved is relieved of all responsibility for the damage.

(c) In the event other than the original contractor effects the damage repairs immediate arrangements are to be made by and through the General Agent to collect from the contractor considered responsible for the damages.

(d) A damage survey is to be conducted in all such cases and a report thereon submitted to the Chief, Division of Ship Repair and Maintenance, Washington, D.C.

[blocks in formation]

44

Conversions (conversion of vessels to troop carriers, hospital ships, and for other special purposes). 51 Alterations, Additions and Betterments (additional equipment, such as, spar decks, heavy lift equipment, change of cargo or passenger space, increasing speed of vessel, and structural changes).

52 Strengthening of Newly Constructed Vessels (strengthening of vessels according to program). 54 Damage Repairs (claimed as a result of enemy action, heavy weather, stranding, collision, fire, stevedore damage, ice damage, and other damages).

[blocks in formation]
[blocks in formation]

65

Other Costs (temporary lights, garbage disposal, tugs to shift vessel while in contractors' yard, and other miscellaneous work requiring distribution of costs over more than one group). 66 Miscellaneous Expenses Applicable to Voyage Operating Expense (removal of cargo debris, fresh water when not required for testing purposes, cleaning cargo and other tanks where no repairs or alterations are involved, and other similar expenses).

67 Preparation of Vessels for Lay-up (stripping, draining and preservation. No repairs to be included in this grouping).

Sec. 19. Ship Repair Summaries.

(a) Ship Repair Summaries shall be prepared on Form MA-159 by the General Agents and local offices of the Authority covering all work performed under their respective jurisdiction and submitted to the District Ship Repair and Maintenance office involved. The summaries must be properly identified and contain the correct cost breakdown as set forth in this order. If the summary covers work other than repairs related to a voyage, the summary must so state, e.g., reactivation, lay-up, idle status, etc. The District Ship Repair and Maintenance office shall review the summaries and supports to ascertain that they have been properly prepared in all respects. The originals of all summaries unsupported shall be forwarded by the District offices to the Chief, Operating Cost Control Branch, Office of Ship Operations, National Shipping Authority, Washington, D.C., and two copies each of all summaries one of which is to be supported by one copy each of job orders, supplemental job orders, invitation for bids, specifications, invoices, itemized prices, completion certificates, ABS invoices and reports, purchase orders, price warehouse delivery tickets, property removal notices, WORKSMAL REP Contracts, a statement that bid, performance and payment bonds were received and approved, abstract of bids containing the list of contractors invit

ed to bid and response of each, an explanation of the basis for an award when the contract is not awarded to lowest bidder, listing of scrap, salvageable material and equipment removed from a vessel, etc., shall be forwarded to the Chief, Division of Ship Repair and Maintenance, Washington, D.C.

(1) Within 60 days after termination of the respective voyages for work awarded by General Agents.

(2) Within 30 days after completion of all work awarded by the Local Offices within a port area.

(b) In the event invoices for particular services are not available such as, American Bureau of Venders Inspectors fees, the summary is nevertheless to be prepared as outlined in this order and estimated costs for the missing billings set forth on the summary. Upon receipt of said invoices a supplementary summary shall promptly be

Contractor

prepared and distributed as outlined in this section.

(c) If no work is performed under a General Agent's jurisdiction for a particular voyage, the General Agent must submit for distribution as stated herein a repair summary stating across the face that no repairs, either foreign or domestic, were performed for the particular voyage involved.

Sec. 20. Reports of awards.

(a) The Coast Directors shall submit to the Chief, Division of Ship Repair and Maintenance, Washington, D.C., a monthly listing of all awards made under their jurisdiction. This listing shall reflect individually the complete contract number, contractor, vessel, type of award, e.g., negotiated or bid, costs and repair period. This listing shall be submitted substantially in the following form:

[blocks in formation]
[blocks in formation]
[blocks in formation]

limitations); Article 3-Maritime Administration Marine Surveyors, Chief, Division of Ship Repair and Maintenance, Coast Directors, Chiefs of District Ship Repair and Maintenance offices, Chiefs of Local Ship Repair and Maintenance offices; and General Agents (within the General Agents' contract limitations); Article 4-Coast Directors, Chief, Division of Ship Repair and Maintenance, Chiefs of District Ship Repair and Maintenance offices, Chiefs of Local Ship Repair and Maintenance offices, and General Agents; Article 5-Maritime Administration Marine Surveyors and General Agents; Article 6-Coast Directors, Chief, Division of Ship Repair and Maintenance, Chiefs of District Ship Repair and Maintenance offices, Chiefs of Local Ship Repair and Maintenance offices, and General Agents (within the General Agent's contract limitations); Article 7-Chiefs of District Ship Repair and Maintenance Offices, Chiefs of Local Ship Repair and Maintenance Offices, and Maritime

Administration Marine Surveyors; Article 18 (d)-Coast Directors; Chief, Division of Ship Repair and Maintenance, Chiefs of District Ship Repair and Maintenance offices, Chiefs of Local Ship Repair and Maintenance offices, and General Agents in connection with work awarded by General Agents; Article 27-Coast Directors, Chiefs of District Ship Repair and Maintenance offices and Chiefs of Local Ship Repair and Maintenance offices.

NOTE: Records and supporting documents referred to in the above order, shall be retained until the completion of the audit by the General Accounting Office, at which time the Maritime Administration will take custody of the records.

[SRM-5, Rev., 18 FR 5035, Aug. 22, 1953, as amended at 21 FR 8106, Oct. 23, 1956. Redesignated at 45 FR 44587, July 1, 1980]

[blocks in formation]

2. Description of NSA-WORKSMALREP Contract.

3. When the NSA-WORKSMALRFP Contract may be used.

4. Persons authorized to make awards under NSA-WORKSMALREP Contract. 5. Responsibility for duplicating copies of

NSA-WORKSMALREP Contract.

AUTHORITY: Sec. 204, 49 Stat. 1987, as amended; 46 U.S.C. 1114. Interpret or apply R.S. 3709, as amended; 41 U.S.C. 5.

SOURCE: SRM-6, Revised, 18 FR 5040, Aug. 22, 1953. Redesignated at 45 FR 44587, July 1, 1980, unless otherwise noted.

Section 1. What this order does.

This order authorizes the use of NSA-WORKSMALREP individual contract for minor repairs to Maritime Administration owned or controlled vessels. The procedure to be followed by the field personnel of the Authority, the General Agents of the Authority, and the ship repair contractors is set forth in the "General Provisions for Small Repairs" and, therefore, no

further reference is made to said procedure herein.

Sec. 2. Description of NSA-WORKSMAL REP Contract.

This is an individual fixed price contract which may be awarded to any firm not holding an NSA-LUMPSUM REP Contract, as a result of formal competitive bids, spot bids, or by negotiation for the performance of ship repair work. NSA Order No. 46 (SRM5, Revised) sets forth the conditions when work may be awarded on the basis of formal competitive bids, spot bids or negotiation, therefore, further reference thereto will not be made herein.

[blocks in formation]

Sec. 5. Responsibility for duplicating copies of NSA-WORKSMALREP Contract.

It will be the responsibility of the several Coast Directors, Local and District Ship Repair and Maintenance Offices and the General Agents to duplicate copies of the work order form and general provisions to suit their respective needs.

« PreviousContinue »