Page images
PDF
EPUB

within the item description block); however, the unit price may be entered as "NSP" (not separately priced) provided, the price of this item is included in the unit price of another contract line item; (ii) be separately identifiable, i.e., no more than one National Stock Number, one item description, one Manufacturer's Part Number, etc., for a supply line item, or no more than one Scope of Work, one Description of Services, etc., for a services line item (unless this identification is provided by associated subline items of other than an informational nature; in which case, a general narrative description shall be assigned to the contract line item number and the subline item shall include the actual detailed identification in accordance with 20-304.2(c)(iii)); and

(iii) have a separate delivery schedule, period of performance or completion date expressly stated in the procurement instrument (“as required" is an expressly stated delivery schedule) unless there are associated subline items of other than an informational character that meet this requirement (When a requirement has multi-delivery dates or multi-destinations or multi-performance dates/points, that factor alone shall not require but does not preclude establishment of more than one contract line item. However, when more than one delivery date and/or more than one destination are identified to a single contract line item, the delivery schedule will specify delivery dates for the item by the destination when established, or individual contract line items may be established for each destination and/or delivery date and/or requisition.).

(b) As an alternative to setting forth in the Schedule an extensive list of contract line items, they may be shown in a contract exhibit as exhibit line items (see 20-305 and 20-306). In these cases, a Contract Line Item Number (CLIN) which references the exhibit will be assigned in the Schedule and shall specify the exhibit identifier. Contract line items for provisioned spares shown on a contract exhibit and data items shown on DD Form 1423, Contract Data Requirements List, when used as an Exhibit shall specify the exhibit identifiers.

(c) Requirements for test model approval under the development phase or for first article approval under the production phase (whether the requirement is for first article delivery for Government testing or for first article approval test report delivery based on contractor testing) shall require the establishment of a separate contract line or subline item for each item of supply or service (one Scope of Work, one Performance Description, one National Stock Number, one Manufacturer's Part Number, one drawing and piece number) unless the test model or first article consists of a lot composed of a mixture of items, in which case a single contract line or subline item may be established for the lot.

(d) Requirements expressing contractor responsibilities for which a separate price is not established or contained in the price of a supply or service line item but for which the contractor may be entitled to payment, shall not be assigned a contract line or subline item number but shall be identified in the contract schedule. Examples of such requirements are transportation, packaging and handling, reusable containers, and state and/or local taxes. If it is determined that a

separate price is to be established for these requirements, they shall meet the criteria in (a) above or in 20–304.2(c) and shall be established as a line or subline item.

20-303.2 Procedures for Numbering.

(a) Contract line items within a contract shall consist of four numeric digits 0001 through 9999 and shall be numbered sequentially but not necessarily consecutively. Unless there is a valid reason to the contrary, the identical line item number assigned to an item in a solicitation pursuant to 20-302(c) shall be assigned to that item when an award is made. Any given contract line item number shall not be assigned more than once in a contract, and line item numbers beyond "9999" shall not be used.

(b) When a contract line item contains subline items, each such subline item shall be numbered by adding to the basic line item number, two alphabetic or two numeric characters as specified in 20-304.

20-304 Contract Subline Items.

20-304.1 General. Contract subline items provide a further subdivision of the basic contract line item when it is necessary for contract performance or administration purposes to separately identify subordinate requirements. There are only two categories of contract sublines.

(a) The first category comprises those subline items that are included in the procurement instrument for information purposes only and are identified by a numeric suffix. These subline items are an integral part of the associated contract line item but shall not be scheduled separately for delivery, separately identified for shipment or performance or separately priced for payment purposes.

(b) The second category comprises those subline items that have a separate delivery schedule, require separate identification at the time of shipment or performance and/or are separately priced for payment purposes. These subline items are identified by an alpha suffix.

20-304.2 Criteria for Establishing.

(a) Subline items included in procurement instruments for informational purposes only (numeric suffix) shall be established at the discretion of the contracting officer. This type of subline item identifies information that relates directly to and is an integral part of the contract line item; e.g., parts of an assembly or parts of a kit. Such subline items shall not have a separate delivery schedule, a separate price for payment purposes or require separate identification at the time of shipment or performance. Informational quantities, prices or amounts determined by the contracting officer as necessary to satisfy management requirements may be identified to such subline items provided that such quantities, prices or amounts are set forth in parentheses within the Supplies/Services (item description) column of the contractual document (i.e., not within the quantity and price columns).

(b) Subline items that have a separate delivery schedule, require separate identification at the time of shipment and/or are separately priced for payment purposes (alpha suffix) shall be established in lieu of line items at the discretion of the contracting officer. This category subline item shall be established whenever a capability must be provided to accumulate separately identified price and/or quantity data at the contract line item level. For instance, this category subline may be used to identify:

(i) identical items that are to be paid from more than one accounting classification (unless separate contract line items have been established for each accounting classification or accounting classifications have been identified to each consignee in the contract line item delivery schedule in accordance with 20-308);

(ii) items of an identical nature where different sizes have been assigned discrete federal supply stock numbers and/or different prices;

(iii) individually payable items such as packaging costs that pertain to a contract line item but are not included in the contract line item price (in this case, item description, price and quantity data for the line item also are to be entered as a separate subline item);

(iv) individual delivery dates and/or destinations and/or requisitions when multiple delivery dates, destinations and/or requisitions are designated in the procurement instrument for a contract line item; or (v) parts of an assembly or parts of a kit when the parts have a separate delivery schedule, require separate identification at the time of shipment or performance and are separately priced for payment purposes.

Whenever subline items of this category (alpha suffix) are established, the associated contract line item shall serve only as a common denominator for the accumulation of management data by the procuring activity and all requirements for the associated contract line item will be identified as subline items (All shipments and payments will be made at the subline item level.).

(c) Subline items in the alpha suffix category ((b) above) shall:

(i) have a separate (i.e., subline item level) delivery schedule, period of performance or completion date expressly stated in the procurement instrument ("as required" is an expressly stated delivery schedule); and

(ii) have or be anticipated to have a single unit price or, if no unit price is established a single total price or amount (When all subline items for a particular contract line item are identical services or supply items that have identical unit prices, the unit price and total amount (extended unit price for all subline items) may be shown at the contract line item level, or the unit price may be shown at the contract line item level and the extended amounts shown at subline item level, or the unit price and total amounts may be shown at subline item level, but only one of these methods may be used for a contract line item and its associated subline items. However, if any subline item has a different unit price than the remainder of the subline items, all subline items shall be separately priced and the contract line item shall not be priced. In this latter instance, subline items that are not separately priced but must be separately identified for shipment and management purposes may indicate a unit price of "NSP" (not separately priced) provided, the price of this item is included in the unit price of another subline item or different contract line item. The clause set forth in 7-104.7 shall be inserted in applicable contracts when in the opinion of the contracting officer because of dollar value

or other considerations it is necessary to preclude payment for a subline item until all related subline items identified as not separately priced have been delivered. In no instance will the contract line item/subline item structure be constructed in such a way as to require the identification of contractor products or services (shipment or performance) at the subline item level and contractor payment at the contract line item level.); and

(iii) be separately identifiable (i.e., no more than one National Stock Number, one Item Description, one Manufacturer's Part Number, etc., for a supply subline item, or no more than one Scope of Work, one Description of Services, etc.) for a services subline item.

20-304.3 Procedures for Numbering.

(a) When contract subline items are established within a contract line item, the total effort shall be assigned a contract line item number and each subline item shall be assigned a contract subline item number.

(b) Contract subline items established within a contract line item for information purposes only (see 20-304.1(a) and 20–304.2(a)) shall be numbered by adding to the contract line item number two numeric characters commencing with "01" and continuing through “99.” No such designation shall be assigned more than once to the same contract line item number within a procurement instrument. The two supplemental numeric characters shall be placed immediately following the contract line item number without separation by spaces or special characters. Example follows:

[blocks in formation]

NOTE: In the above instance, the delivery schedule will identify the contract line item (not the subline items) and all shipments and payments will be at the contract line item level. Shipment documents and payment vouchers will not identify subline items.

(c) Contract subline items established to identify contractual requirements that have a separate delivery schedule, require identification at the time of shipment or accomplishment and/or are separately priced for payment purposes (see 20–304.1(b) and 20–304.2(b)) shall:

(i) be numbered by adding to the contract line item number two alphabetic characters commencing with "AA" and continuing

through "ZZ." (The letters “I” and “O” shall not be used.) Contract sublines shall be numbered sequentially but not necessarily consecutively. No such designation shall be assigned more than once to the same contract line item number within a contract;

(ii) be sequenced within a contract line item as follows: AA, AB, AC through AZ; then BA, BB, BC through BZ; and continuing, if necessary through ZZ; and

(iii) be constructed by placing the two supplemental alphabetic characters immediately following the contract line item without separation by spaces or special characters. For example, with contract line item number "0001" the first three contract subline items, if consecutive, would be numbered "0001AA," "0001 AB," and "0001AC." Examples of correct line item structures in this category follow: Example 1.-Subline items structured to identify destinations for identical items, identically priced (Delivery schedule shall be established for each subline item, not the contract line item.).

[blocks in formation]

Example 2.-Subline items structured to identify destinations for identical items, not identically priced (Delivery schedule shall be established for each subline item, not the contract line item.).

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

NOTE: Difference in prices for identical items is due to separate destinations for FOB destination delivery.

« PreviousContinue »