... presented at the hearing , which was offered to support the conclusion that the NBSR facility can be satisfactorily designed , constructed and safely operated . This in- cludes the conceptual design and design criteria for the core ...
... presented at the hearing , which was offered to support the conclusion that the NBSR facility can be satisfactorily designed , constructed and safely operated . This in- cludes the conceptual design and design criteria for the core ...
Page 8
... presented in this record . NBS has given its accurance that the quantity or argon - 41 to be emitted from the stack will be controlled to prevent injury to persons on or off the site . At the time of the hearing , the program to be ...
... presented in this record . NBS has given its accurance that the quantity or argon - 41 to be emitted from the stack will be controlled to prevent injury to persons on or off the site . At the time of the hearing , the program to be ...
Page 10
... presented in reference to the issue whether NBS was then technically qualified to proceed . Both participants later agreed that consistent with indicated Commission policy to render determinations insofar as possible after a scheduled ...
... presented in reference to the issue whether NBS was then technically qualified to proceed . Both participants later agreed that consistent with indicated Commission policy to render determinations insofar as possible after a scheduled ...
Page 13
... presented under oath by seven witnesses on behalf of the applicant and two witnesses on behalf of the AEC staff ; each witness was presented for such further oral examination as any participant desired to con- duct . The qualifications ...
... presented under oath by seven witnesses on behalf of the applicant and two witnesses on behalf of the AEC staff ; each witness was presented for such further oral examination as any participant desired to con- duct . The qualifications ...
Page 18
... presented five pages of carefully and logically prepared testimony on this subject , and concluded with these words : " The Staff has examined the conceptual plans submitted for the reactor instrument system , including the related ...
... presented five pages of carefully and logically prepared testimony on this subject , and concluded with these words : " The Staff has examined the conceptual plans submitted for the reactor instrument system , including the related ...
Common terms and phrases
accident additional amended appears appellant's application Atomic Energy Act Atomic Energy Commission August authorized Board Boiling Water Reactor byproduct material Change Order claim clause Commission's Rules Company completion concrete construction permit containment Contracting Officer contracting officer's contractor control rod coolant core cost delay Division of Licensing DOCKET Electric Elk River engineering equitable adjustment Esquire evidence facility fact filed fission products fuel elements Government granted health and safety Hearing Examiner hereinafter initial decision issuance issued Jersey Central letter limited liquidated damages matter megawatts Memorandum ment motion nuclear parties performance Piqua plant Polytron power level presented pressure procedures proceeding proposed provisional operating license pursuant radioactive radiographers reactor reasonable assurance record Regulatory Staff request Rules of Practice scram Seaborg Section special nuclear material steam subcontract submitted technical specifications temperature tests thermal tion valves vessel
Popular passages
Page 515 - A word is not a crystal, transparent and unchanged; it is the skin of a living thought and may vary greatly in color and content according to the circumstances and the time in which it is used.
Page 404 - Safeguards for a report and without prior public hearing, upon finding that there is reasonable assurance that the health and safety of the public will not be endangered.
Page 498 - If the Contractor refuses or fails to prosecute the work, or any separable part thereof, with such diligence as will insure its completion within the time specified in this contract...
Page 52 - In any event, no license may be issued to any person within the United States if, in the opinion of the Commission, the issuance of a license to such person would be inimical to the common defense and security or to the health and safety of the public.
Page 640 - Officer grants a further period of time before the date of final payment under the contract), notifies the Contracting Officer in writing of the causes of delay. The Contracting Officer shall ascertain the facts and the extent of the delay and extend the time for completing the work when, in his judgment, the findings of fact justify such an extension, and his findings of fact shall be final and conclusive on the parties subject only to appeal as provided in the clause of this contract entitled "Disputes.
Page 523 - ... the decision of the Contracting Officer shall be final and conclusive. In connection with any appeal proceeding under this clause, the Contractor shall be afforded an opportunity to be heard and to offer evidence in support of its appeal.
Page 565 - When that intention is clearly ascertainable from the writing, effect will be given to the provision, as freely as to any other, where the damages are uncertain in nature or amount or are difficult of ascertainment or where the amount stipulated for is not so extravagant, or disproportionate to the amount of property loss, as to show that compensation was not the object aimed at or as to imply fraud, mistake, circumvention or oppression.
Page 801 - The performance of work under this contract may be terminated by the Government in accordance with this clause In whole, or from time to time In part, whenever the Contracting Officer shall determine that such termination Is In the best Interest of the Government.
Page 801 - Whenever for any reason the Contracting Officer shall determine that such termination is in the best interest of the Government. Any such termination shall be effected by delivery to the Contractor of a Notice of Termination...
Page 640 - WORK (a) The Contracting Officer may order the Contractor in writing to suspend all or any part of the work for such period of time as he may determine to be appropriate for the convenience of the Government.